Renovation of the façade and centuries of the parish church in the Noom Nace in Piekoszów, including the adaptation to tourist functions (Q127828): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The implementation of the project will be carried out by means of renovation works consisting of: Refurbishment of the roof tower + other (including carpentry) -gram estimate: extraction of cover and decoration, new decoration, status of the membrane, replacement of floor elements, fungal growth, assembly of blinds, construction and assembly of wiyards, maintenance of the load, the renovation of the intermediate wooden frames and the support str...)
Property / summary
 
The implementation of the project will be carried out by means of renovation works consisting of: Refurbishment of the roof tower + other (including carpentry) -gram estimate: extraction of cover and decoration, new decoration, status of the membrane, replacement of floor elements, fungal growth, assembly of blinds, construction and assembly of wiyards, maintenance of the load, the renovation of the intermediate wooden frames and the support structure of the bell bells; — replacement of roof covering + blachal processing: the erection of scaffolds, dismantling of old cover, lid and blackhouse, lightning protection, repair of blackouts; Rehabilitation of the West façade and towers: preparatory work, cleaning of surface, welds, repair of historic walls, completion of plaster, impregnation against mould, location of restoration plasters (emphasis added, tender of the calcareous twine), performance of profiles of ornamental trimmings, surface painting, high quality painting. The project will achieve the following indicators: The number of monuments to be supported by 1050-1 — the number of facilities adapted to the needs of persons with disabilities — 1, the number of projects covering the cost of reasonable accommodation for persons with disabilities — 0 — increase in the expected number of visits to supported sites belonging to the cultural and natural heritage and tourist attractions — the project aims to make the region more accessible by securing the cultural heritage site — the Church of the Church. The NMP in Piekoszów (maintenance, renovation and preservation of the monument against hazards together with the development of the environment), adapting it to tourist functions. The objective is in line with the objective of the priority axis for ROP WŚ 2014-2020 and the objective of the action. The project will run for the period 1.07.2017-31.12.2017. (English)
Property / summary: The implementation of the project will be carried out by means of renovation works consisting of: Refurbishment of the roof tower + other (including carpentry) -gram estimate: extraction of cover and decoration, new decoration, status of the membrane, replacement of floor elements, fungal growth, assembly of blinds, construction and assembly of wiyards, maintenance of the load, the renovation of the intermediate wooden frames and the support structure of the bell bells; — replacement of roof covering + blachal processing: the erection of scaffolds, dismantling of old cover, lid and blackhouse, lightning protection, repair of blackouts; Rehabilitation of the West façade and towers: preparatory work, cleaning of surface, welds, repair of historic walls, completion of plaster, impregnation against mould, location of restoration plasters (emphasis added, tender of the calcareous twine), performance of profiles of ornamental trimmings, surface painting, high quality painting. The project will achieve the following indicators: The number of monuments to be supported by 1050-1 — the number of facilities adapted to the needs of persons with disabilities — 1, the number of projects covering the cost of reasonable accommodation for persons with disabilities — 0 — increase in the expected number of visits to supported sites belonging to the cultural and natural heritage and tourist attractions — the project aims to make the region more accessible by securing the cultural heritage site — the Church of the Church. The NMP in Piekoszów (maintenance, renovation and preservation of the monument against hazards together with the development of the environment), adapting it to tourist functions. The objective is in line with the objective of the priority axis for ROP WŚ 2014-2020 and the objective of the action. The project will run for the period 1.07.2017-31.12.2017. (English) / rank
 
Normal rank

Revision as of 12:46, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation of the façade and centuries of the parish church in the Noom Nace in Piekoszów, including the adaptation to tourist functions
Project in Poland financed by DG Regio

    Statements

    0 references
    499,952.0 zloty
    0 references
    119,988.48 Euro
    13 January 2020
    0 references
    1,139,103.0 zloty
    0 references
    273,384.72 Euro
    13 January 2020
    0 references
    43.89 percent
    0 references
    1 July 2017
    0 references
    30 June 2018
    0 references
    PARAFIA RZYMSKOKATOLICKA P.W. NARODZENIA NAJŚWIĘTSZEJ MARYI PANNY W PIEKOSZOWIE
    0 references
    Realizacja projektu polegać będzie na wykonaniu prac renowacyjnych obejmujących: -remont więźby dachowej wież + inne (w tym roboty ciesielskie)-wg kosztorysu: rozebranie pokrycia i deskowania, nowe deskowanie, położenie membrany, wymiana elementów podłóg, odgrzybienie, montaż żaluzji, wykonanie i montaż witraża, konserwacja sztukaterii, remont stropów pośrednich drewnianych i konstrukcji wsporczych dzwonów; -wymiana pokrycia dachów wież + obróbki blacharskie: postawienie rusztowań, demontaż starego pokrycia, krycie wież i kopuł blachą, instalacje odgromowe, remont obróbek blacharskich; -remont tynków elewacji zachodniej i wież: roboty przygotowawcze, czyszczenie powierzchni, spoin, naprawa murów zabytkowych, uzupełnienie tynków, impregnacja preparatem przeciw pleśni, położenie tynków renowacyjnych (nakłady na pogrubienie, przetarcie szpachlą wapienną), wykonanie profili ciągnionych szlachetnych ozdobnych, gruntowanie podłoży, malowanie wysokojakościowe. W ramach projektu osiągnięte zostaną następujące wskaźniki: -liczba zabytków nieruchomych objętych wsparciem–1 - liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami–1 -liczba projektów, w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełnosprawnościami-0 - wzrost oczekiwanej liczby odwiedzin w objętych wsparciem miejscach należących do dziedzictwa kulturalnego i naturalnego oraz stanowiących atrakcje turystyczne–wzrost o 1050 os./rok Celem projektu jest zwiększona dostępność zasobów kulturowych regionu poprzez zabezpieczenie obiektu dziedzictwa kulturowego - kościoła pw. Narodzenie NMP w Piekoszowie (konserwacja, renowacja oraz zabezpieczenie zabytku przed zagrożeniami wraz z zagospodarowaniem otoczenia) wraz z dostosowaniem go do funkcji turystycznych. Cel zgodny jest z celem szcz. wyznaczonym dla danej osi prioryt.RPO WŚ 2014-2020 oraz celem działania. Projekt realizowany będzie w okresie 1.07.2017-31.12.2017 (Polish)
    0 references
    The implementation of the project will be carried out by means of renovation works consisting of: Refurbishment of the roof tower + other (including carpentry) -gram estimate: extraction of cover and decoration, new decoration, status of the membrane, replacement of floor elements, fungal growth, assembly of blinds, construction and assembly of wiyards, maintenance of the load, the renovation of the intermediate wooden frames and the support structure of the bell bells; — replacement of roof covering + blachal processing: the erection of scaffolds, dismantling of old cover, lid and blackhouse, lightning protection, repair of blackouts; Rehabilitation of the West façade and towers: preparatory work, cleaning of surface, welds, repair of historic walls, completion of plaster, impregnation against mould, location of restoration plasters (emphasis added, tender of the calcareous twine), performance of profiles of ornamental trimmings, surface painting, high quality painting. The project will achieve the following indicators: The number of monuments to be supported by 1050-1 — the number of facilities adapted to the needs of persons with disabilities — 1, the number of projects covering the cost of reasonable accommodation for persons with disabilities — 0 — increase in the expected number of visits to supported sites belonging to the cultural and natural heritage and tourist attractions — the project aims to make the region more accessible by securing the cultural heritage site — the Church of the Church. The NMP in Piekoszów (maintenance, renovation and preservation of the monument against hazards together with the development of the environment), adapting it to tourist functions. The objective is in line with the objective of the priority axis for ROP WŚ 2014-2020 and the objective of the action. The project will run for the period 1.07.2017-31.12.2017. (English)
    0 references

    Identifiers

    RPSW.04.04.00-26-0012/16
    0 references