(Created claim: summary (P836): This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks. (English) | |||||||||||||||
Property / summary: This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 13:06, 8 July 2021
Project Q2913355 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2913355 in Portugal |
Statements
1,419,886.02 Euro
0 references
85.0 percent
0 references
1 September 2017
0 references
31 December 2021
0 references
APA - ADMINISTRAÇÃO DO PORTO DE AVEIRO, S.A.
0 references
Esta operação consiste na execução da empreitada de implementação da operacionalidade das pontes cais n.º 24, n.º, 25 e n.º 26 do TGL do Porto de Aveiro. Os principais trabalhos a executar são o prolongamento da esteira existente até às referidas pontes cais e construção das redes de drenagem de águas pluviais e contaminadas e de combate a incêndios. (Portuguese)
0 references
This operation consists of the implementation of the construction of the operationality of the bridges Pier No. 24, No. 25, and No. 26 of the TGL of the Port of Aveiro. The main work to be carried out is the extension of the existing treadmill to the aforementioned pier bridges and the construction of rainwater drainage and contaminated and firefighting networks. (English)
8 July 2021
0 references
Ílhavo, Gafanha da Nazaré
0 references