REHABILITATION OF THE PUBLIC SPACE OF THE HISTORICAL CENTER – 3TH PHASE (STREET FÉLIX ALVES PEREIRA/ARCOS DE VALDEVEZ (Q2895280): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Removed claim: summary (P836): As far as the intervention itself is concerned, the aim is to resise | re-profiling the street, making uniform not only the profile of the motor vehicle track, but also at the level of the coating of the different floors that constitute it. The consolidation and reinforcement of pedestrian areas (passes) ensuring continuous and clear paths of any kind of architectural barriers, safe and comfortable., remove_old_english_translation)
Property / summary
As far as the intervention itself is concerned, the aim is to resise | re-profiling the street, making uniform not only the profile of the motor vehicle track, but also at the level of the coating of the different floors that constitute it. The consolidation and reinforcement of pedestrian areas (passes) ensuring continuous and clear paths of any kind of architectural barriers, safe and comfortable. (English)
 
Property / summary: As far as the intervention itself is concerned, the aim is to resise | re-profiling the street, making uniform not only the profile of the motor vehicle track, but also at the level of the coating of the different floors that constitute it. The consolidation and reinforcement of pedestrian areas (passes) ensuring continuous and clear paths of any kind of architectural barriers, safe and comfortable. (English) / rank
Normal rank
 
Property / summary: As far as the intervention itself is concerned, the aim is to resise | re-profiling the street, making uniform not only the profile of the motor vehicle track, but also at the level of the coating of the different floors that constitute it. The consolidation and reinforcement of pedestrian areas (passes) ensuring continuous and clear paths of any kind of architectural barriers, safe and comfortable. (English) / qualifier
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 07:16, 8 July 2021

Project Q2895280 in Portugal
Language Label Description Also known as
English
REHABILITATION OF THE PUBLIC SPACE OF THE HISTORICAL CENTER – 3TH PHASE (STREET FÉLIX ALVES PEREIRA/ARCOS DE VALDEVEZ
Project Q2895280 in Portugal

    Statements

    0 references
    140,614.75 Euro
    0 references
    85.0 percent
    0 references
    31 October 2019
    0 references
    30 June 2020
    0 references
    MUNICÍPIO DE ARCOS DE VALDEVEZ
    0 references

    41°50'46.10"N, 8°25'22.73"W
    0 references
    No que à intervenção propriamente dita diz respeito, visa-se o redimensionamento | reperfilamento do arruamento, uniformizandose, não só o perfil da faixa de circulação automóvel, mas também, ao nível do revestimento dos diferentes pavimentos que o constituem. A consolidação e reforço das áreas pedonais (passeios) assegurando percursos contínuos e desobstruídos de qualquer tipo de barreiras arquitetónicas, seguros e confortáveis. (Portuguese)
    0 references
    Arcos de Valdevez, União das freguesias de Arcos de Valdevez (Salvador), Vila Fonche e Parada
    0 references

    Identifiers

    NORTE-04-2316-FEDER-000352
    0 references