CHANGE FOR LED TECHNOLOGY FIXTURES – 3ST PHASE (Q2894537): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): With this Operation, the aim is to improve energy efficiency in public lighting and the respective intervention target circuits, selected according to technical and economic feasibility criteria. Existing luminaires will be replaced by high-efficiency LED luminaires and new LED luminaires mounted and electrified in existing support., remove_old_english_translation)
(‎Created claim: summary (P836): With this Operation, the aim is to improve energy efficiency in public lighting and the respective intervention target circuits, selected according to technical and economic feasibility criteria. Existing luminaires will be replaced by high-efficiency LED luminaires and new LED luminaires mounted and electrified in existing support., translated_summary)
Property / summary
 
With this Operation, the aim is to improve energy efficiency in public lighting and the respective intervention target circuits, selected according to technical and economic feasibility criteria. Existing luminaires will be replaced by high-efficiency LED luminaires and new LED luminaires mounted and electrified in existing support. (English)
Property / summary: With this Operation, the aim is to improve energy efficiency in public lighting and the respective intervention target circuits, selected according to technical and economic feasibility criteria. Existing luminaires will be replaced by high-efficiency LED luminaires and new LED luminaires mounted and electrified in existing support. (English) / rank
 
Normal rank
Property / summary: With this Operation, the aim is to improve energy efficiency in public lighting and the respective intervention target circuits, selected according to technical and economic feasibility criteria. Existing luminaires will be replaced by high-efficiency LED luminaires and new LED luminaires mounted and electrified in existing support. (English) / qualifier
 
point in time: 8 July 2021
Timestamp+2021-07-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:59, 8 July 2021

Project Q2894537 in Portugal
Language Label Description Also known as
English
CHANGE FOR LED TECHNOLOGY FIXTURES – 3ST PHASE
Project Q2894537 in Portugal

    Statements

    0 references
    141,854.2 Euro
    0 references
    85.0 percent
    0 references
    1 March 2019
    0 references
    31 March 2021
    0 references
    MUNICÍPIO DE OLIVEIRA DE AZEMÉIS
    0 references
    Q3000779 (Deleted Item)
    0 references

    40°50'35.20"N, 8°28'6.67"W
    0 references
    Com a presente Operação, pretende-se melhorar a eficiência energética na iluminação pública e nos respetivos circuitos alvos de intervenção, selecionados de acordo com critérios de viabilidade técnica e económica. Irão ser substituídas as luminárias existentes por luminárias LED de alta eficiência e montadas e eletrificadas novas luminárias LED em apoio existente. (Portuguese)
    0 references
    With this Operation, the aim is to improve energy efficiency in public lighting and the respective intervention target circuits, selected according to technical and economic feasibility criteria. Existing luminaires will be replaced by high-efficiency LED luminaires and new LED luminaires mounted and electrified in existing support. (English)
    8 July 2021
    0 references
    Oliveira de Azeméis, União das freguesias de Oliveira de Azeméis, Santiago de Riba-Ul, Ul, Macinhata da Seixa e Madail
    0 references

    Identifiers

    NORTE-03-1203-FEDER-000177
    0 references