(Created claim: summary (P836): The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users., translated_su...) |
||||||||||||||
Property / summary | |||||||||||||||
The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users. (English) | |||||||||||||||
Property / summary: The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 07:48, 8 July 2021
Project Q2898345 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2898345 in Portugal |
Statements
318,607.2 Euro
0 references
83.0 percent
0 references
7 January 2019
0 references
31 December 2021
0 references
CENTRO SOCIAL PAROQUIAL DE S.MIGUEL DE LOBRIGOS
0 references
O projeto pretende requalificar todo o edifício e simultaneamente ampliar, com a integração e adaptação das antigas instalações da Creche e do CATL, no Nível 1, para ampliação da ERPI e aumento da capacidade do SADEste vai permitir o alargamento da capacidade para 43 residentes (alojados em 22 quartos, sendo 4 triplos, 13 duplos e 5 individuais), SAD para 80 utentes, mantendo-se, contudo, inalterada a capacidade do Centro de Dia em 20 utentes. (Portuguese)
0 references
The project aims to requalify the entire building and simultaneously expand, with the integration and adaptation of the old facilities of the Creche and the CATL, at Level 1, to expand the ERPI and increase the capacity of the SADEste will allow the expansion of capacity to 43 residents (housed in 22 rooms, 4 triple, 13 double and 5 individual), SAD to 80 users, while remaining unchanged the capacity of the Day Center in 20 users. (English)
8 July 2021
0 references
Santa Marta de Penaguião, União das freguesias de Lobrigos (São Miguel e São João Baptista) e Sanhoane
0 references
Identifiers
NORTE-07-4842-FEDER-000338
0 references