Q2895359 (Q2895359): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Created claim: summary (P836): The planned intervention will allow Rua José Régio to act as a complement to the urban road network in order to allow significant improvements to the circulation scheme near the school area, the Truck Center, peripheral parks and main road access to the city, with the introduction of solutions to ensure the flow of traffic and the circulation of alternative and smooth modes of transport., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The planned intervention will allow Rua José Régio to act as a complement to the urban road network in order to allow significant improvements to the circulation scheme near the school area, the Truck Center, peripheral parks and main road access to the city, with the introduction of solutions to ensure the flow of traffic and the circulation of alternative and smooth modes of transport. (English) | |||||||||||||||
Property / summary: The planned intervention will allow Rua José Régio to act as a complement to the urban road network in order to allow significant improvements to the circulation scheme near the school area, the Truck Center, peripheral parks and main road access to the city, with the introduction of solutions to ensure the flow of traffic and the circulation of alternative and smooth modes of transport. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The planned intervention will allow Rua José Régio to act as a complement to the urban road network in order to allow significant improvements to the circulation scheme near the school area, the Truck Center, peripheral parks and main road access to the city, with the introduction of solutions to ensure the flow of traffic and the circulation of alternative and smooth modes of transport. (English) / qualifier | |||||||||||||||
point in time: 8 July 2021
|
Revision as of 07:02, 8 July 2021
Project Q2895359 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2895359 in Portugal |
Statements
121,534.5 Euro
0 references
85.0 percent
0 references
1 February 2017
0 references
28 February 2018
0 references
MUNICÍPIO DA PÓVOA DE VARZIM
0 references
A intervenção prevista permitirá que a Rua José Régio funcione como complemento da malha viária urbana de modo a permitir melhorias significativas ao esquema de circulação próximo da zona de escolas, da Central de Camionagem, parques de estacionamento periféricos e principal acesso rodoviários à cidade, com a introdução de soluções que garantam a fluidez do tráfego e a circulação de modos alternativos e suaves de transporte. (Portuguese)
0 references
The planned intervention will allow Rua José Régio to act as a complement to the urban road network in order to allow significant improvements to the circulation scheme near the school area, the Truck Center, peripheral parks and main road access to the city, with the introduction of solutions to ensure the flow of traffic and the circulation of alternative and smooth modes of transport. (English)
8 July 2021
0 references
Póvoa de Varzim, União das freguesias da Póvoa de Varzim, Beiriz e Argivai
0 references
Identifiers
NORTE-05-1406-FEDER-000030
0 references