PAICD 03 – Parish Santos Nicolau – Urban Regeneration (Q2882304): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 50.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 50.0 percent / rank | |||||||
Revision as of 12:20, 13 September 2021
Project Q2882304 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | PAICD 03 – Parish Santos Nicolau – Urban Regeneration |
Project Q2882304 in Portugal |
Statements
186,842.57 Euro
0 references
1 December 2016
0 references
28 February 2019
0 references
MUNICIPIO DE SETUBAL
0 references
Regeneração urbana do bairro incluindo a melhoria dos espaços urbanos, demolições e limpeza. A Intervenção na Rua I tem um carácter de nível infraestrutural dotando esta Rua das condições básicas existentes na cidade. Na Av. Belo Horizonte e envolventes, a intervenção vai dotar aqueles espaços, agora baldios, em zonas verdes e zonas de estar para usufruto da população. (Portuguese)
0 references
Urban regeneration of the parish including the improvement of urban spaces, demolitions and cleaning. The Intervention on I Street has an infrastructural level character endowing this Street with the basic conditions existing in the city. On the Av. Belo Horizonte and surroundings, the intervention will equip those spaces, now vacant, in green areas and living areas for the enjoyment of the population. (English)
7 July 2021
0 references
Setúbal, Setúbal (São Sebastião)
0 references
Identifiers
LISBOA-08-4943-FEDER-000004
0 references