Requalification of the School Park – 3rd Phase (Q2881925): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 50.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
50.0 percent
Amount50.0 percent
Unitpercent
 
Property / co-financing rate: 50.0 percent / rank
Normal rank
 

Revision as of 11:59, 13 September 2021

Project Q2881925 in Portugal
Language Label Description Also known as
English
Requalification of the School Park – 3rd Phase
Project Q2881925 in Portugal

    Statements

    0 references
    449,084.85 Euro
    0 references
    1 March 2018
    0 references
    30 January 2020
    0 references
    MUNICIPIO DE SETUBAL
    0 references
    0 references

    38°31'41.99"N, 8°51'56.99"W
    0 references
    Considerando a realidade do Parque Escolar concelhio torna-se imprescindível a realização de intervenções a nível de reabilitação das infraestruturas, a reparação de infiltrações, fissuras, pinturas de tetos e paredes, a remodelação de cozinhas e refeitórios assim como de instalações sanitárias, espaços exteriores e remoção de fibrocimento. (Portuguese)
    0 references
    Considering the reality of the Municipal School Park, it is essential to carry out interventions in the level of infrastructure rehabilitation, the repair of infiltrations, cracks, ceiling and wall paintings, the remodeling of kitchens and cafeterias as well as sanitary facilities, outdoor spaces and removal of fibrocement. (English)
    7 July 2021
    0 references
    Setúbal, Setúbal (São Sebastião)
    0 references

    Identifiers

    LISBOA-07-5673-FEDER-000053
    0 references