Rehabilitation of the Square of Bulls – Site (Q2878221): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 11:37, 13 September 2021
Project Q2878221 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Rehabilitation of the Square of Bulls – Site |
Project Q2878221 in Portugal |
Statements
157,209.58 Euro
0 references
28 April 2017
0 references
31 May 2018
0 references
MUNICÍPIO DA NAZARÉ
0 references
Esta operação visa a reabilitação do Largo da Praça de Touros, no Sítio da Nazaré, contribuindo para a sua qualificação e modernização, através da intervenção em infraestruturas, dotando o espaço de equipamentos e espaços verdes.A operação tem enquadramento nas tipologias de investimento previstos no Aviso Centro-16-2016-02 e contribui para o alcance dos indicadores de realização e resultado do POR Centro e PEDU da Nazaré. (Portuguese)
0 references
This operation aims at the rehabilitation of the Largo da Praça de Touros, in the Sítio da Nazaré, contributing to its qualification and modernisation, through the intervention in infrastructures, providing the space with equipment and green spaces.The operation has a framework in the investment typologies provided in the Notice Center-16-2016-02 and contributes to the achievement of the indicators of achievement and result of the POR Centro e pedu da Nazaré. (English)
7 July 2021
0 references
Nazaré, Nazaré
0 references
Identifiers
CENTRO-09-2316-FEDER-000046
0 references