Tower and Threatened Fountain (Q2877520): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 11:50, 13 September 2021

Project Q2877520 in Portugal
Language Label Description Also known as
English
Tower and Threatened Fountain
Project Q2877520 in Portugal

    Statements

    0 references
    92,499.84 Euro
    0 references
    23 October 2016
    0 references
    31 December 2018
    0 references
    MUNICÍPIO DE AGUIAR DA BEIRA
    0 references

    40°49'4.37"N, 7°33'15.41"W
    0 references
    Com as intervenções na Torre e Fonte Ameada pretende-se a valorização dos dois monumentos nacionais e da lógica a desenho urbano do Largo dos Monumentos, Estas valorizações serão concretizadas pela reabilitação das utilizações e funções dos dois monumentos e a estruturação do espaço urbano será efetuado pela adoção de plataformas adjacentes aos monumentos que se articularão para conferir lógica e desenho ao vasto Largo. (Portuguese)
    0 references
    With the interventions in the Tower and Fountain threatened it is intended to value the two national monuments and logic the urban design of Largo dos Monuments, These valuations will be realised by the rehabilitation of the uses and functions of the two monuments and the structuring of the urban space will be carried out by the adoption of platforms adjacent to the monuments that will articulate to confer logic and design to the vast Largo. (English)
    7 July 2021
    0 references
    Aguiar da Beira, União das freguesias de Aguiar da Beira e Coruche
    0 references

    Identifiers

    CENTRO-07-2114-FEDER-000028
    0 references