DAREX MANUFACTURER OF SHIRTS: IMPROVING THE ENERGY EFFICIENCY OF THE COMPANY (Q2706087): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item)
Property / programme
 
Property / programme: Lubelskie Voivodeship - ERDF/ESF / rank
 
Normal rank

Revision as of 02:19, 26 July 2021

Project Q2706087 in Poland
Language Label Description Also known as
English
DAREX MANUFACTURER OF SHIRTS: IMPROVING THE ENERGY EFFICIENCY OF THE COMPANY
Project Q2706087 in Poland

    Statements

    0 references
    378,715.51 zloty
    0 references
    84,188.46 Euro
    0.2223 Euro
    0 references
    688,573.75 zloty
    0 references
    153,069.94 Euro
    0.2223 Euro
    0 references
    55.0 percent
    0 references
    1 June 2020
    0 references
    31 May 2022
    0 references
    DAREX PRODUCENT KOSZUL SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ SPÓŁKA KOMANDYTOWA
    0 references
    0 references

    50°56'36.6"N, 22°12'30.2"E
    0 references
    Celem projektu jest zwiększenie efektywności energetycznej budynku produkcyjnego przedsiębiorstwa DAREX poprzez przeprowadzenie jego głębokiej termomodernizacji. Celem głównym projektu na poziomie oddziaływania jest ochrona jak również poprawa jakości środowiska. W wyniku realizacji projektu zmniejszy się energochłonność obiektu oraz związane z tym zapotrzebowanie na energię. Zaplanowano następujące prace: - Wymiana oświetlenia na LED. - Montaż instalacji fotowoltaicznej o mocy 30,08 kW. - Wymiana witryny na aluminiową o współczynniku przenikania U - 1,30 W/m2*K. - Ocieplenie ścian zew. warstwą 15 cm styropianu o lambdzie 0,033 W/(m*K) wraz ze ścianami fundamentowymi. - Ocieplenie stropów nadwieszonych - należy ocieplić stropy warstwą 20 cm styropianu o lambdzie 0,032 W/(m*K). - Ocieplenie stropodachu - należy ułożyć w miejsce istniejącego poszycia płyty warstwowe z rdzeniem poliuretanowym, pokryte blachą, o grubości 15 cm i lambdzie 0,023 W/(m*K). - Montaż systemu zarządzania energią WSKAŹNIKI W PROJEKCIE W. Produktu -L. przedsiębiorstw otrzymujących wsparcie (CI1) - 1 szt. -L. przedsiębiorstw, które w wyniku wsparcia poprawiły efekt. energetyczną - 1 szt. -L. zmodernizowanych energetycznie budynków - 1 szt. -Pow. użytk. budynków poddanych termomod. - 783,42 m2 -L. wybudowanych jednostek wytw. EE z OZE - 1 szt. W. Rezultatu -Il. zaoszczędz. EC- 289,17 GJ/rok -Il. zaoszczędz. EE- 63,96 MWh/rok -Zmniejszenie zużycia en. końc.w wyniku realizacji projektu- 519,40 .GJ/rok -Szac. roczny spadek emisji gazów ciepl. (CI34)- 68,00 ton równ.CO2/rok -Dodatk.zdolnośc wytwarz. EE ze źródeł odnawialnych- 0,03008 MWe/rok -Dodatk.zdolnośc wytwarz. EE ze źródeł odnawialnych- 30,08 kWe/rok -Prod.. EE z nowo wybud. instalacji wykorzyst. OZE- 28,8768 MWe/rok Identyfikacja zestawu działań zwiększających efektywność energetyczną została wykonana na podstawie audytu energetycznego. (Polish)
    0 references
    The aim of the project is to increase the energy efficiency of the DAREX production building by carrying out its deep thermomodernisation. The main objective of the project at the impact level is to protect and improve the quality of the environment. As a result of the project, the energy intensity of the facility and the associated energy demand will decrease. The following works are planned: — Replacement of lighting with LED. — Installation of a photovoltaic installation with a power of 30.08 kW. — Replacement of the site with an aluminium penetration factor U – 1.30 W/m²*K. – Warming of walls with a layer of 15 cm of styrofoam with lambda 0.033 W/(m*K) together with foundation walls. — Warming of suspended ceilings – should be warmed up with a layer of 20 cm polystyrene with lambda 0.032 W/(m*K). — Warming of the tuft – replace the existing layer plate with polyurethane core, coated with sheet metal, 15 cm thick and lambda 0.023 W/(m*K). — Installation of the energy management system IN THE PROJECT W. Product -L. enterprises receiving support (CI1) – 1 pcs. —L. companies that have improved the energy effect as a result of the support – 1 piece —L. energy-modified buildings – 1 pcs. —Am. use of buildings subjected to thermomodes. — 783.42 m² -L. units built. EE with RES – 1 pcs. W. Result -Il. will save. EC-289.17 GJ/year -Il. will save. EE- 63.96 MWh/year – Reduction of final consumption as a result of the implementation of the project- 519,40.GJ/rok -Estimation of the annual decrease in heat gas emissions. (CI34)- 68,00 tonnes of equal CO2/year -Additional manufacturing capability. EE from renewable sources – 0.03008 MWe/year – Additive Capacity. EE from renewable sources – 30.08 kWe/year -Prod.. EE from the newly built installation used. RES- 28,8768 MWe/year Identification of a set of measures to increase energy efficiency was carried out on the basis of an energy audit. (English)
    7 July 2021
    0 references

    Identifiers

    RPLU.05.01.00-06-0039/19
    0 references