Lot 1_Basic School 2.3 Campelos – Replacement of Coverages in Asianto (Q2871104): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 11:06, 13 September 2021

Project Q2871104 in Portugal
Language Label Description Also known as
English
Lot 1_Basic School 2.3 Campelos – Replacement of Coverages in Asianto
Project Q2871104 in Portugal

    Statements

    0 references
    11,680.62 Euro
    0 references
    25 January 2021
    0 references
    30 November 2021
    0 references
    MUNICIPIO DE TORRES VEDRAS
    0 references
    0 references

    39°11'23.75"N, 9°14'12.12"W
    0 references
    A candidatura tem como objetivo a realização de todos os trabalhos necessários para a substituição dos materiais de revestimento em fibrocimento com amianto das coberturas do equipamento escolar, por painéis “sandwich” (Portuguese)
    0 references
    The purpose of the application is to carry out all the work necessary to replace asbestos-based asbestos coating materials by sandwich panels. (English)
    7 July 2021
    0 references
    Torres Vedras, União das freguesias de Campelos e Outeiro da Cabeça
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000298
    0 references