Urban requalification of the Central section of Avenida da Liberdade – Phase I (Q2863363): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 09:30, 13 September 2021
Project Q2863363 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Urban requalification of the Central section of Avenida da Liberdade – Phase I |
Project Q2863363 in Portugal |
Statements
434,044.09 Euro
0 references
14 September 2016
0 references
31 July 2020
0 references
MUNICIPIO DE ALJUSTREL
0 references
Este projeto corresponde à primeira fase de requalificação Urbana do Troço Central da Avenida da Liberdade e consistirá exclusivamente na edificação de um Parque de Estacionamento de dois pisos, com um total de 56 lugares de aparcamento, sendo dois lugares destinados a viaturas de pessoas de mobilidade condicionada e dois lugares específicos para viaturas hibridas. (Portuguese)
0 references
This project corresponds to the first phase of urban requalification of the Central Section of Avenida da Liberdade and will consist exclusively of the building of a two-storey Park, with a total of 56 parking spaces, being two places for vehicles of conditioned mobility and two specific places for hybrid cars. (English)
6 July 2021
0 references
Aljustrel, União das freguesias de Aljustrel e Rio de Moinhos
0 references
Identifiers
ALT20-04-2316-FEDER-000005
0 references