UPGRADING OF THE CORTICES SCHOOL (Q2862776): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 09:23, 13 September 2021

Project Q2862776 in Portugal
Language Label Description Also known as
English
UPGRADING OF THE CORTICES SCHOOL
Project Q2862776 in Portugal

    Statements

    0 references
    194,859.8 Euro
    0 references
    1 August 2019
    0 references
    31 December 2020
    0 references
    MUNICIPIO DE ALMEIRIM
    0 references
    0 references

    39°8'38.36"N, 8°41'9.02"W
    0 references
    Com a presente intervenção pretende-se preservar ao máximo as características dos edifícios existentes, ao mesmo tempo modernizar o espaço escolar e torná-lo mais eficiente e funcional, adaptado a utentes com mobilidade condicionada bem como a crianças com necessidades educativas especiais Será encerrada e integrada na presente, a Escola Básica de Foros de Benfica (Portuguese)
    0 references
    With this intervention we intend to preserve the characteristics of existing buildings to the maximum, while modernising the school space and making it more efficient and functional, adapted to users with conditioned mobility as well as to children with special educational needs It will be closed and integrated into the present, the Basic School of Foros de Benfica (English)
    6 July 2021
    0 references
    Almeirim, Benfica do Ribatejo
    0 references

    Identifiers

    ALT20-02-5673-FEDER-000077
    0 references