The Energy Saving Measure in Polar Transport Vaclav Vlasák (Q15847): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project will implement measures to reduce the energy performance of the applicant’s buildings. In particular, the measures are the insulation of the perimeter masonry and the insulation of the roof of the administrative building, the installation of LED lighting, the treatment of cooling and the installation of a small PV power plant on the wall of the hall. The measures are in line with the terms of the Programme., Adding English summary)
(‎Removed claim: co-financing rate (P837): 39.9999998152477 percent)
Property / co-financing rate
39.9999998152477 percent
Amount39.9999998152477 percent
Unitpercent
 
Property / co-financing rate: 39.9999998152477 percent / rank
Normal rank
 

Revision as of 14:53, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
The Energy Saving Measure in Polar Transport Vaclav Vlasák
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,732,048.76 Czech koruna
    0 references
    69,281.9504 Euro
    10 January 2020
    0 references
    4,330,121.92 Czech koruna
    0 references
    173,204.8768 Euro
    10 January 2020
    0 references
    22 May 2017
    0 references
    31 March 2020
    0 references
    POLAR Transport Václav Vlasák
    0 references
    0 references

    49°58'1.06"N, 14°52'2.06"E
    0 references
    28163
    0 references
    Díky projektu budou realizovány opatření na snížení energetické náročnosti budov žadatele. Konkrétně se jedná o opatření zateplení obvodového zdiva a zateplení střechy administrativní budovy, instalaci LED osvětlení, úpravy chlazení a instalaci malé fotovoltaické elektrárny na zdi haly. Opatření jsou v souladu s podmínkami programu. a. (Czech)
    0 references
    The project will implement measures to reduce the energy performance of the applicant’s buildings. In particular, the measures are the insulation of the perimeter masonry and the insulation of the roof of the administrative building, the installation of LED lighting, the treatment of cooling and the installation of a small PV power plant on the wall of the hall. The measures are in line with the terms of the Programme. (English)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/16_061/0010529
    0 references