Arrival and Confluence Stops (Q2878141): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Torres Vedras / rank | |||
Normal rank |
Revision as of 21:04, 7 July 2021
Project Q2878141 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Arrival and Confluence Stops |
Project Q2878141 in Portugal |
Statements
305,609.83 Euro
0 references
85.0 percent
0 references
25 May 2017
0 references
8 November 2019
0 references
MUNICIPIO DE TORRES VEDRAS
0 references
A operação visa a construção de 12 Paragens de Chegada e Confluência em locais estratégicos da cidade de Torres Vedras. Estas interfaces desempenham um papel determinante no funcionamento de um sistema de transportes intermodal e alinham com as estratégias nacionais e europeias de redução dos GEE através da aposta na mobilidade urbana sustentável. (Portuguese)
0 references
The operation aims at the construction of 12 Arrival and Confluence stops at strategic locations in the city of Torres Vedras. These interfaces play a key role in the operation of an intermodal transport system and align with national and European GHG reduction strategies through the focus on sustainable urban mobility. (English)
7 July 2021
0 references
Torres Vedras, União das freguesias de Torres Vedras (São Pedro, Santiago, Santa Maria do Castelo e São Miguel) e Matacães
0 references
Identifiers
CENTRO-09-1406-FEDER-000013
0 references