Reconstruction of SCZT vapour x HV- recovery of the primary collector Tkalcov section TG7 — TG3 (Q19086): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project focuses on the rebuilding of a plot to heat a primary collector of Tkalcov, a primary collector, at the Talkalc section of T7-G3, which leads (as an indication) the right side of the river. The present project will contribute to an overall acceleration of the process of rebuilding the network from steam to hot water. The aim of the project is the replacement of an outdated steam pipe, which gives rise to significant heat losses. The...) |
(Removed claim: co-financing rate (P837): 39.9999999934289 percent) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 39.9999999934289 percent / rank | |||||||
Revision as of 15:10, 19 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of SCZT vapour x HV- recovery of the primary collector Tkalcov section TG7 — TG3 |
Project in Czech Republic financed by DG Regio |
Statements
24,349,053.62 Czech koruna
0 references
60,872,634.06 Czech koruna
0 references
31 January 2020
0 references
Teplárny Brno, a.s.
0 references
63800
0 references
Projekt se zaměřuje na přestavbu parního SZTE na horkovodní vystrojením primárního kolektoru Tkalcovská v úseku TG7-TG3, který vede (orientačně) pod ulicí Tkalcovská po pravém břehu řeky. Předkládaný projekt přispěje k celkovému urychlení procesu přestavby sítě z parovodní na horkovodní. Cílem projektu je výměna zastaralého parovodního potrubí, na kterém dochází ke značným tepelným ztrátám. Výstupem bude snížení ztrát ve vedení, zvýšení efektivity provozu a snížení spotřeby primárního paliva. a. (Czech)
0 references
The project focuses on the rebuilding of a plot to heat a primary collector of Tkalcov, a primary collector, at the Talkalc section of T7-G3, which leads (as an indication) the right side of the river. The present project will contribute to an overall acceleration of the process of rebuilding the network from steam to hot water. The aim of the project is the replacement of an outdated steam pipe, which gives rise to significant heat losses. The output will be to reduce management losses, increase the efficiency of traffic and reduce the consumption of primary paliaa. a. (English)
0 references
Identifiers
CZ.01.3.15/0.0/0.0/17_095/0014436
0 references