Energy savings Prefa Brno a.s., Hodonín site (Q15458): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The project will lead to the implementation of thermal technological measures and thus a significant reduction in the energy intensity of the company’s administrative object. In particular, the insulation of the building envelope, the reconstruction of the wiring, the installation of the photovoltaics (PV) and the lighting system, all in line with energy output will be achieved., Adding English summary)
(‎Removed claim: co-financing rate (P837): 29.9999999657183 percent)
Property / co-financing rate
29.9999999657183 percent
Amount29.9999999657183 percent
Unitpercent
 
Property / co-financing rate: 29.9999999657183 percent / rank
Normal rank
 

Revision as of 14:53, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings Prefa Brno a.s., Hodonín site
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    875,102.54 Czech koruna
    0 references
    35,004.1016 Euro
    10 January 2020
    0 references
    2,917,008.47 Czech koruna
    0 references
    116,680.33880000001 Euro
    10 January 2020
    0 references
    1 December 2015
    0 references
    28 December 2017
    0 references
    31 December 2017
    0 references
    Prefa Brno a.s.
    0 references
    0 references

    49°11'55.75"N, 16°38'29.22"E
    0 references
    61500
    0 references
    V rámci projektu dojde k realizaci tepelně technických opatření a tím k významnému snížení energetické náročnosti administrativního objektu společnosti. Dojde k realizaci zejména zateplení pláště budovy, rekonstrukci rozvodů, instalace fotovoltaiky a osvětlení, vše v souladu s energetickým auditem. a. (Czech)
    0 references
    The project will lead to the implementation of thermal technological measures and thus a significant reduction in the energy intensity of the company’s administrative object. In particular, the insulation of the building envelope, the reconstruction of the wiring, the installation of the photovoltaics (PV) and the lighting system, all in line with energy output will be achieved. (English)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/15_010/0001005
    0 references