Renewable energy sources to improve the environment — photovoltaics (Q131967): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The object of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplnej w Orzyz Sp. z o.o. (parcel No 90/4). An installation with a total capacity of 39,68 kWp on the roof of the building will be built. The installation will consist of 155 solar modules. The single module will achieve its rated power in the order of 250W. 5 inverters will cooperate with the modules. The generated network vo...)
Property / summary
 
The object of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplnej w Orzyz Sp. z o.o. (parcel No 90/4). An installation with a total capacity of 39,68 kWp on the roof of the building will be built. The installation will consist of 155 solar modules. The single module will achieve its rated power in the order of 250W. 5 inverters will cooperate with the modules. The generated network voltage shall be 230V AC. The planned investment will be based on the roof of the building. PV generators will be located on a surface of 202.2 m². installations will be connected to the grid, the type of installation on the grid on the grid. the project is connected to the mains and the electrical connection conditions of the grid are connected to the grid with a power greater than the planned capacity of the installation. The investment will be implemented in the various stages: preparation of a feasibility study and assessment of the potential of the investment, preparation of the application for funding, selection of contractors under public procurement law, conclusion of contract with the contractor, technical preparation for installation and installation in accordance with the planned timetable, testing and checking phase of the installation, finalisation of the project and signature of the final protocol, final statement of project, operational phase. The project is directly in line with the assumptions set out in the SZOOP ROP WM 2014-2020, i.e. “The majority share of RES in the overall energy balance of the region”. The project’s work is part of the project types to be carried out under measure 4.1. The project will be implemented directly in the SZOOP ROP WM 2014-2020indicators. The deployment of PV will reduce the consumption of conventional energy, reduce CO2 and other greenhouse gas emissions. Thus, the project will have a positive impact on the environment while promoting economic growth and sustainable development. (English)
Property / summary: The object of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplnej w Orzyz Sp. z o.o. (parcel No 90/4). An installation with a total capacity of 39,68 kWp on the roof of the building will be built. The installation will consist of 155 solar modules. The single module will achieve its rated power in the order of 250W. 5 inverters will cooperate with the modules. The generated network voltage shall be 230V AC. The planned investment will be based on the roof of the building. PV generators will be located on a surface of 202.2 m². installations will be connected to the grid, the type of installation on the grid on the grid. the project is connected to the mains and the electrical connection conditions of the grid are connected to the grid with a power greater than the planned capacity of the installation. The investment will be implemented in the various stages: preparation of a feasibility study and assessment of the potential of the investment, preparation of the application for funding, selection of contractors under public procurement law, conclusion of contract with the contractor, technical preparation for installation and installation in accordance with the planned timetable, testing and checking phase of the installation, finalisation of the project and signature of the final protocol, final statement of project, operational phase. The project is directly in line with the assumptions set out in the SZOOP ROP WM 2014-2020, i.e. “The majority share of RES in the overall energy balance of the region”. The project’s work is part of the project types to be carried out under measure 4.1. The project will be implemented directly in the SZOOP ROP WM 2014-2020indicators. The deployment of PV will reduce the consumption of conventional energy, reduce CO2 and other greenhouse gas emissions. Thus, the project will have a positive impact on the environment while promoting economic growth and sustainable development. (English) / rank
 
Normal rank

Revision as of 20:49, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renewable energy sources to improve the environment — photovoltaics
Project in Poland financed by DG Regio

    Statements

    0 references
    191,906.2 zloty
    0 references
    46,057.488 Euro
    13 January 2020
    0 references
    277,699.56 zloty
    0 references
    66,647.89439999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    7 October 2016
    0 references
    31 December 2019
    0 references
    ZAKŁAD ENERGETYKI CIEPLNEJ W ORZYSZU SP. Z O.O.
    0 references

    53°48'35.3"N, 21°56'50.6"E
    0 references
    Przedmiotem projektu, będzie montaż instalacji fotowoltaicznej na budynku Zakładu Energetyki Cieplnej w Orzyszu Sp. z o.o. (nr działki 90/4). Zostanie wybudowana instalacja o łącznej mocy 39,68 kWp na dachach budynku. W skład instalacji będzie wchodziło 155 modułów fotowoltaicznych. Pojedynczy moduł będzie osiągał moc znamionową rzędu 250W. Elementami współpracującymi z modułami będzie 5 falowników. Uzyskiwane napięcie sieciowe wyniesie 230V prądu przemiennego. Planowana inwestycja będzie ulokowana na dachu budynku. Generatory fotowoltaiczne zajmą powierzchnię 202,2m2.Instalacje zostaną podłączone do sieci - typ instalacji on grid.Budynek objęty projektem posiada przyłącze do sieci elektrycznej oraz elektryczne warunki przyłączenia do sieci o mocy większej niż moc planowanych instalacji. Inwestycja zostanie wdrożona w poszczególnych etapach: przygotowanie studium wykonalności i ocenienie potencjału inwestycji, przygotowanie formalne, złożenie wniosku o dofinansowanie, wybór wykonawców zgodnie z prawem zamówień publicznych, zawarcie umowy z wykonawcą, przygotowanie techniczne do montażu instalacji oraz montaż zgodnie z założonym harmonogramem, etap testowania i sprawdzanie instalacji, zakończenie projektu i podpisanie protokołu końcowego, końcowe rozliczenie projektu, etap eksploatacji. Projekt wpisuje się bezpośrednio w założenia określone w SZOOP RPO WiM 2014-2020 tj. „Zwiększony udział OZE w ogólnym bilansie energetycznym regionu”. Prace przewidziane w ramach projektu wpisują się w typy projektów przewidzianych do realizacji w ramach działania 4.1. Projekt bezpośrednio realizować będzie założone w SZOOP RPO WiM 2014-2020wskaźniki. Wdrożenie instalacji fotowoltaicznej przyczyni się do zmniejszenia zużycia energii pochodzącej ze źródeł konwencjonalnych, do obniżenia emisji CO2 i innych gazów cieplarnianych. Tym samym realizacja projektu będzie miała pozytywny wpływ na środowisko, jednocześnie wspierając wzrost gospodarczy i zrównoważony rozwój. (Polish)
    0 references
    The object of the project will be the installation of a photovoltaic installation on the building of Zakład Energetyki Cieplnej w Orzyz Sp. z o.o. (parcel No 90/4). An installation with a total capacity of 39,68 kWp on the roof of the building will be built. The installation will consist of 155 solar modules. The single module will achieve its rated power in the order of 250W. 5 inverters will cooperate with the modules. The generated network voltage shall be 230V AC. The planned investment will be based on the roof of the building. PV generators will be located on a surface of 202.2 m². installations will be connected to the grid, the type of installation on the grid on the grid. the project is connected to the mains and the electrical connection conditions of the grid are connected to the grid with a power greater than the planned capacity of the installation. The investment will be implemented in the various stages: preparation of a feasibility study and assessment of the potential of the investment, preparation of the application for funding, selection of contractors under public procurement law, conclusion of contract with the contractor, technical preparation for installation and installation in accordance with the planned timetable, testing and checking phase of the installation, finalisation of the project and signature of the final protocol, final statement of project, operational phase. The project is directly in line with the assumptions set out in the SZOOP ROP WM 2014-2020, i.e. “The majority share of RES in the overall energy balance of the region”. The project’s work is part of the project types to be carried out under measure 4.1. The project will be implemented directly in the SZOOP ROP WM 2014-2020indicators. The deployment of PV will reduce the consumption of conventional energy, reduce CO2 and other greenhouse gas emissions. Thus, the project will have a positive impact on the environment while promoting economic growth and sustainable development. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0364/16
    0 references