(Created claim: summary (P836): The applicant plans to carry out an investment consisting of installing solar panels on the existing infrastructure of the Applicant in the location of Goutkowo 79A 11-041 Olsztyn, dz. No 31/10, 31/16. The project is designed to construct a photovoltaic installation with the total installed capacity of 25,2 kWp. the installation will be placed on the roof of the building. The proposed installation consists of 90 units of 280W photovoltaic module...) |
||
Property / summary | |||
The applicant plans to carry out an investment consisting of installing solar panels on the existing infrastructure of the Applicant in the location of Goutkowo 79A 11-041 Olsztyn, dz. No 31/10, 31/16. The project is designed to construct a photovoltaic installation with the total installed capacity of 25,2 kWp. the installation will be placed on the roof of the building. The proposed installation consists of 90 units of 280W photovoltaic modules equipped with power optimality and 2 inverters. The phases of the implementation of the project: — submission of an application to do so — signing of the contract for the award of the contract — selecting the contractor in accordance with the principle of competitiveness — conclusion of the contract with the contractor and start of works — implementation of works in accordance with the planned timetable — Completion of the project and signature of the final protocol — Final bill of bill for implementation of the project; Signature — implementation of the contract — delivery of works — final acceptance and signature of the final protocol Increased RES share in the region’s overall energy balance. The implementation of the Sub-Action will increase the share of renewable energy in the energy balance of the company, which will increase the share of renewable energy in the energy mix. The region. This will reduce the emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of local renewable energy sources? The costs associated with energy consumption will be reduced as a result of the investment. (English) | |||
Property / summary: The applicant plans to carry out an investment consisting of installing solar panels on the existing infrastructure of the Applicant in the location of Goutkowo 79A 11-041 Olsztyn, dz. No 31/10, 31/16. The project is designed to construct a photovoltaic installation with the total installed capacity of 25,2 kWp. the installation will be placed on the roof of the building. The proposed installation consists of 90 units of 280W photovoltaic modules equipped with power optimality and 2 inverters. The phases of the implementation of the project: — submission of an application to do so — signing of the contract for the award of the contract — selecting the contractor in accordance with the principle of competitiveness — conclusion of the contract with the contractor and start of works — implementation of works in accordance with the planned timetable — Completion of the project and signature of the final protocol — Final bill of bill for implementation of the project; Signature — implementation of the contract — delivery of works — final acceptance and signature of the final protocol Increased RES share in the region’s overall energy balance. The implementation of the Sub-Action will increase the share of renewable energy in the energy balance of the company, which will increase the share of renewable energy in the energy mix. The region. This will reduce the emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of local renewable energy sources? The costs associated with energy consumption will be reduced as a result of the investment. (English) / rank | |||
Normal rank |
Revision as of 20:45, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Investments in RES in the enterprise HANDLOFERA.PL |
Project in Poland financed by DG Regio |
Statements
107,100.0 zloty
0 references
154,980.0 zloty
0 references
85.0 percent
0 references
16 March 2020
0 references
31 August 2020
0 references
HANDLOSFERA.PL SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w istniejącej infrastrukturze Wnioskodawcy w lokalizacji Gutkowo 79A 11-041 Olsztyn, dz. Nr 31/10, 31/16. W ramach projektu zaplanowano budowę instalacji fotowoltaicznej o łącznej mocy zainstalowanych paneli 25,2 kWp Instalacja będzie posadowiona na dachu budynku. Projektowana instalacja składa się z 90 szt. modułów fotowoltaicznych o mocy 280W, wyposażonych w optymalizatory mocy oraz 2 inwertery. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: - podpisanie umowy - realizacja prac - odbiór końcowy i podpisanie protokołu końcowego Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
0 references
The applicant plans to carry out an investment consisting of installing solar panels on the existing infrastructure of the Applicant in the location of Goutkowo 79A 11-041 Olsztyn, dz. No 31/10, 31/16. The project is designed to construct a photovoltaic installation with the total installed capacity of 25,2 kWp. the installation will be placed on the roof of the building. The proposed installation consists of 90 units of 280W photovoltaic modules equipped with power optimality and 2 inverters. The phases of the implementation of the project: — submission of an application to do so — signing of the contract for the award of the contract — selecting the contractor in accordance with the principle of competitiveness — conclusion of the contract with the contractor and start of works — implementation of works in accordance with the planned timetable — Completion of the project and signature of the final protocol — Final bill of bill for implementation of the project; Signature — implementation of the contract — delivery of works — final acceptance and signature of the final protocol Increased RES share in the region’s overall energy balance. The implementation of the Sub-Action will increase the share of renewable energy in the energy balance of the company, which will increase the share of renewable energy in the energy mix. The region. This will reduce the emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of local renewable energy sources? The costs associated with energy consumption will be reduced as a result of the investment. (English)
0 references
Identifiers
RPWM.04.01.00-28-0185/17
0 references