Installation of PV installations with a capacity of 30 kW and 40 kW (Q131770): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project consists of the execution of two photovoltaic installations (with a power of 40 kW and 30 kW) for wastewater treatment plants and water treatment plants in Orneo. The project will provide the following elements for the proper functioning of the photovoltaic power plant: solar modules (panels), inverters, construction, DC protection, AC guards, lightning protection, installation materials, mounting, monitoring (IT system) and wiring a...)
Property / summary
 
The project consists of the execution of two photovoltaic installations (with a power of 40 kW and 30 kW) for wastewater treatment plants and water treatment plants in Orneo. The project will provide the following elements for the proper functioning of the photovoltaic power plant: solar modules (panels), inverters, construction, DC protection, AC guards, lightning protection, installation materials, mounting, monitoring (IT system) and wiring and cables. The project will contribute to increasing the share of renewable energy sources in the overall energy balance of the region by building infrastructure for the generation and distribution of energy from renewable sources. The project will also help to address the energy problems of the company. The project contributes to meeting all identified concerns of all identified stakeholders. The applicant is prepared to start the investment. Has the technical documentation, the building permit or the construction declaration is not required. It also has a legal relationship governed by the law applicable to immovable property that is built on and which has not been built on, on which the project will be carried out. The project will be carried out on the parcels: 21/2 and 20/10, in the Bogatyńskie unit (District of Water, ul. Morąska) and 379 and 382/1 in the cadastral unit 5 of the Orneta unit. (English)
Property / summary: The project consists of the execution of two photovoltaic installations (with a power of 40 kW and 30 kW) for wastewater treatment plants and water treatment plants in Orneo. The project will provide the following elements for the proper functioning of the photovoltaic power plant: solar modules (panels), inverters, construction, DC protection, AC guards, lightning protection, installation materials, mounting, monitoring (IT system) and wiring and cables. The project will contribute to increasing the share of renewable energy sources in the overall energy balance of the region by building infrastructure for the generation and distribution of energy from renewable sources. The project will also help to address the energy problems of the company. The project contributes to meeting all identified concerns of all identified stakeholders. The applicant is prepared to start the investment. Has the technical documentation, the building permit or the construction declaration is not required. It also has a legal relationship governed by the law applicable to immovable property that is built on and which has not been built on, on which the project will be carried out. The project will be carried out on the parcels: 21/2 and 20/10, in the Bogatyńskie unit (District of Water, ul. Morąska) and 379 and 382/1 in the cadastral unit 5 of the Orneta unit. (English) / rank
 
Normal rank

Revision as of 20:34, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of PV installations with a capacity of 30 kW and 40 kW
Project in Poland financed by DG Regio

    Statements

    0 references
    290,332.36 zloty
    0 references
    69,679.7664 Euro
    13 January 2020
    0 references
    420,128.0 zloty
    0 references
    100,830.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 March 2016
    0 references
    30 November 2017
    0 references
    PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI "PWIK" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references

    54°6'56.2"N, 20°7'49.1"E
    0 references
    Projekt polega na wykonaniu dwóch instalacji fotowoltaicznych (o mocach 40 kW i 30kW) na potrzeby oczyszczalni ścieków i stacji uzdatniania wody w Ornecie. W ramach projektu wykonane zostaną następujące elementy niezbędnej do prawidłowego funkcjonowania elektrowni fotowoltaicznej: moduły fotowoltaiczne (panele), Falowniki, konstrukcja, zabezpieczenia DC, zabezpieczenia AC, instalacja odgromowa, materiały montażowe, montaż, monitoring (system IT) oraz przewody stało i zmiennoprądowe. Projekt przyczyni się do zwiększenia udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu poprzez budowę infrastruktury do wytwarzania i dystrybucji energii pochodzącej ze źródeł odnawialnych. Projekt przyczyni się również do rozwiązania problemów przedsiębiorstwa w zakresie energii. Projekt przyczynia się do zaspokojenia wszystkich zdiagnozowanych problemów wszystkich wskazanych interesariuszy. Wnioskodawca jest przygotowany do rozpoczęcia inwestycji. Posiada dokumentację techniczną, pozwolenie na budowę ani zgłoszenie budowy nie jest wymagane. Posiada również uregulowany stosunek prawny do nieruchomości zabudowanych i niezabudowanych, na których realizowany będzie projekt. Projekt realizowany będzie na działkach: 21/2 i 20/10 w jednostce ewidencyjnej Bogatyńskie (Stacja Uzdatniania Wody, ul Morąska) i 379 i 382/1 w obrębie ewidencyjnym 5 w jednostce ewidencyjnej Orneta. (Polish)
    0 references
    The project consists of the execution of two photovoltaic installations (with a power of 40 kW and 30 kW) for wastewater treatment plants and water treatment plants in Orneo. The project will provide the following elements for the proper functioning of the photovoltaic power plant: solar modules (panels), inverters, construction, DC protection, AC guards, lightning protection, installation materials, mounting, monitoring (IT system) and wiring and cables. The project will contribute to increasing the share of renewable energy sources in the overall energy balance of the region by building infrastructure for the generation and distribution of energy from renewable sources. The project will also help to address the energy problems of the company. The project contributes to meeting all identified concerns of all identified stakeholders. The applicant is prepared to start the investment. Has the technical documentation, the building permit or the construction declaration is not required. It also has a legal relationship governed by the law applicable to immovable property that is built on and which has not been built on, on which the project will be carried out. The project will be carried out on the parcels: 21/2 and 20/10, in the Bogatyńskie unit (District of Water, ul. Morąska) and 379 and 382/1 in the cadastral unit 5 of the Orneta unit. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0110/16