(‎Created claim: summary (P836): The operation is the construction of a pedestrian bridge (definitively, approximately 145 meters) over the Mondego River that allows the use of the Mondego Trail throughout the year and not only, as happened before, during the period in which the pedestrian bridge – precarious and temporary – could withstand the fury of the river current in the most flowing months. The construction of this bridge is part of the intention of valuing the Mondego T...)
Property / summary
 
The operation is the construction of a pedestrian bridge (definitively, approximately 145 meters) over the Mondego River that allows the use of the Mondego Trail throughout the year and not only, as happened before, during the period in which the pedestrian bridge – precarious and temporary – could withstand the fury of the river current in the most flowing months. The construction of this bridge is part of the intention of valuing the Mondego Trail. (English)
Property / summary: The operation is the construction of a pedestrian bridge (definitively, approximately 145 meters) over the Mondego River that allows the use of the Mondego Trail throughout the year and not only, as happened before, during the period in which the pedestrian bridge – precarious and temporary – could withstand the fury of the river current in the most flowing months. The construction of this bridge is part of the intention of valuing the Mondego Trail. (English) / rank
 
Normal rank
Property / summary: The operation is the construction of a pedestrian bridge (definitively, approximately 145 meters) over the Mondego River that allows the use of the Mondego Trail throughout the year and not only, as happened before, during the period in which the pedestrian bridge – precarious and temporary – could withstand the fury of the river current in the most flowing months. The construction of this bridge is part of the intention of valuing the Mondego Trail. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:40, 7 July 2021

Project Q2877589 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2877589 in Portugal

    Statements

    0 references
    537,893.74 Euro
    0 references
    85.0 percent
    0 references
    12 December 2016
    0 references
    30 September 2019
    0 references
    MUNICÍPIO DE COIMBRA
    0 references

    40°12'39.60"N, 8°21'6.80"W
    0 references
    A operação é a construção de uma ponte pedonal (de forma definitiva, de aproximadamente,145 metros) sobre o rio Mondego que permita a utilização do Trilho do Mondego durante todo o ano e não apenas, conforme acontecia antes, durante o período em que a ponte pedonal - precária e provisória - conseguia resistir à fúria da corrente do rio nos meses mais caudalosos. A construção desta ponte insere-se na intenção de valorizar o Trilho do Mondego. (Portuguese)
    0 references
    The operation is the construction of a pedestrian bridge (definitively, approximately 145 meters) over the Mondego River that allows the use of the Mondego Trail throughout the year and not only, as happened before, during the period in which the pedestrian bridge – precarious and temporary – could withstand the fury of the river current in the most flowing months. The construction of this bridge is part of the intention of valuing the Mondego Trail. (English)
    7 July 2021
    0 references
    Coimbra, Torres do Mondego
    0 references

    Identifiers

    CENTRO-07-2114-FEDER-000131