Q2877520 (Q2877520): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): With the interventions in the Tower and Fountain threatened it is intended to value the two national monuments and logic the urban design of Largo dos Monuments, These valuations will be realised by the rehabilitation of the uses and functions of the two monuments and the structuring of the urban space will be carried out by the adoption of platforms adjacent to the monuments that will articulate to confer logic and design to the vast Largo., tr...) |
||||||||||||||
Property / summary | |||||||||||||||
With the interventions in the Tower and Fountain threatened it is intended to value the two national monuments and logic the urban design of Largo dos Monuments, These valuations will be realised by the rehabilitation of the uses and functions of the two monuments and the structuring of the urban space will be carried out by the adoption of platforms adjacent to the monuments that will articulate to confer logic and design to the vast Largo. (English) | |||||||||||||||
Property / summary: With the interventions in the Tower and Fountain threatened it is intended to value the two national monuments and logic the urban design of Largo dos Monuments, These valuations will be realised by the rehabilitation of the uses and functions of the two monuments and the structuring of the urban space will be carried out by the adoption of platforms adjacent to the monuments that will articulate to confer logic and design to the vast Largo. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: With the interventions in the Tower and Fountain threatened it is intended to value the two national monuments and logic the urban design of Largo dos Monuments, These valuations will be realised by the rehabilitation of the uses and functions of the two monuments and the structuring of the urban space will be carried out by the adoption of platforms adjacent to the monuments that will articulate to confer logic and design to the vast Largo. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 09:42, 7 July 2021
Project Q2877520 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2877520 in Portugal |
Statements
92,499.84 Euro
0 references
85.0 percent
0 references
23 October 2016
0 references
31 December 2018
0 references
MUNICÍPIO DE AGUIAR DA BEIRA
0 references
Com as intervenções na Torre e Fonte Ameada pretende-se a valorização dos dois monumentos nacionais e da lógica a desenho urbano do Largo dos Monumentos, Estas valorizações serão concretizadas pela reabilitação das utilizações e funções dos dois monumentos e a estruturação do espaço urbano será efetuado pela adoção de plataformas adjacentes aos monumentos que se articularão para conferir lógica e desenho ao vasto Largo. (Portuguese)
0 references
With the interventions in the Tower and Fountain threatened it is intended to value the two national monuments and logic the urban design of Largo dos Monuments, These valuations will be realised by the rehabilitation of the uses and functions of the two monuments and the structuring of the urban space will be carried out by the adoption of platforms adjacent to the monuments that will articulate to confer logic and design to the vast Largo. (English)
7 July 2021
0 references
Aguiar da Beira, União das freguesias de Aguiar da Beira e Coruche
0 references
Identifiers
CENTRO-07-2114-FEDER-000028
0 references