Q2878337 (Q2878337): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply, translated_summary)
Property / summary
 
The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply (English)
Property / summary: The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply (English) / rank
 
Normal rank
Property / summary: The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:07, 7 July 2021

Project Q2878337 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2878337 in Portugal

    Statements

    0 references
    342,150.77 Euro
    0 references
    85.0 percent
    0 references
    20 September 2016
    0 references
    31 August 2021
    0 references
    MUNICIPIO DA GUARDA
    0 references

    40°32'16.22"N, 7°15'58.68"W
    0 references
    A intervenção terá em conta o Reperfilamento de todos os espaços intervencionados A remodelação integral dos pavimentos a implantação de mobiliário urbano (papeleiras e dissuasores de trânsito) a implantação de sinalética de tráfego a remodelação da iluminação pública, com tipologia adaptada ao uso, perfil e utilização do espaço e a remodelação integral das redes de drenagem de águas pluviais, residuais e de abastecimento de água (Portuguese)
    0 references
    The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply (English)
    7 July 2021
    0 references
    Guarda, Guarda
    0 references

    Identifiers

    CENTRO-09-2316-FEDER-000184
    0 references