Q2878337 (Q2878337): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply (English) | |||||||||||||||
Property / summary: The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 10:07, 7 July 2021
Project Q2878337 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2878337 in Portugal |
Statements
342,150.77 Euro
0 references
85.0 percent
0 references
20 September 2016
0 references
31 August 2021
0 references
MUNICIPIO DA GUARDA
0 references
A intervenção terá em conta o Reperfilamento de todos os espaços intervencionados A remodelação integral dos pavimentos a implantação de mobiliário urbano (papeleiras e dissuasores de trânsito) a implantação de sinalética de tráfego a remodelação da iluminação pública, com tipologia adaptada ao uso, perfil e utilização do espaço e a remodelação integral das redes de drenagem de águas pluviais, residuais e de abastecimento de água (Portuguese)
0 references
The intervention will take into account the re-profiling of all intervened spaces The integral refurbishment of the floors the implementation of urban furniture (papers and traffic deterrs) the implementation of traffic signals and the remodeling of public lighting, with typology adapted to the use, profile and use of space and the integral remodeling of the drainage networks of rainwater, waste water and water supply (English)
7 July 2021
0 references
Guarda, Guarda
0 references
Identifiers
CENTRO-09-2316-FEDER-000184
0 references