Q2878255 (Q2878255): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English) | |||||||||||||||
Property / summary: This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 10:04, 7 July 2021
Project Q2878255 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2878255 in Portugal |
Statements
112,877.22 Euro
0 references
85.0 percent
0 references
7 January 2019
0 references
28 March 2020
0 references
MUNICÍPIO DE ÍLHAVO
0 references
A presente operação consiste essencialmente numa redefinição do perfil da via (alinhamentos de vias e bermas / recolha de águas para meias-canas / redução dos ressaltos de piso) e numa uniformização dos materiais de revestimento bem como uma ligeira obra de correção de componentes das redes de águas e saneamento. (Portuguese)
0 references
This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English)
7 July 2021
0 references
Ílhavo, Ílhavo (São Salvador)
0 references
Identifiers
CENTRO-09-2316-FEDER-000084
0 references