Q2878255 (Q2878255): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components., translated_summary)
Property / summary
 
This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English)
Property / summary: This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English) / rank
 
Normal rank
Property / summary: This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English) / qualifier
 
point in time: 7 July 2021
Timestamp+2021-07-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:04, 7 July 2021

Project Q2878255 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2878255 in Portugal

    Statements

    0 references
    112,877.22 Euro
    0 references
    85.0 percent
    0 references
    7 January 2019
    0 references
    28 March 2020
    0 references
    MUNICÍPIO DE ÍLHAVO
    0 references

    40°35'48.01"N, 8°40'54.98"W
    0 references
    A presente operação consiste essencialmente numa redefinição do perfil da via (alinhamentos de vias e bermas / recolha de águas para meias-canas / redução dos ressaltos de piso) e numa uniformização dos materiais de revestimento bem como uma ligeira obra de correção de componentes das redes de águas e saneamento. (Portuguese)
    0 references
    This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English)
    7 July 2021
    0 references
    Ílhavo, Ílhavo (São Salvador)
    0 references

    Identifiers

    CENTRO-09-2316-FEDER-000084
    0 references