Q2870996 (Q2870996): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Created claim: summary (P836): The intervention includes the requalification and expansion of the school of the 1st cycle of Basic Education (former primary school) of Vila Maior, creating spaces for library, multipurpose space and refectory, teacher room and attendance. Equipping with school furniture, didactic and computer equipment. There will also be an intervention in the outside arrangements of the school., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The intervention includes the requalification and expansion of the school of the 1st cycle of Basic Education (former primary school) of Vila Maior, creating spaces for library, multipurpose space and refectory, teacher room and attendance. Equipping with school furniture, didactic and computer equipment. There will also be an intervention in the outside arrangements of the school. (English) | |||||||||||||||
Property / summary: The intervention includes the requalification and expansion of the school of the 1st cycle of Basic Education (former primary school) of Vila Maior, creating spaces for library, multipurpose space and refectory, teacher room and attendance. Equipping with school furniture, didactic and computer equipment. There will also be an intervention in the outside arrangements of the school. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The intervention includes the requalification and expansion of the school of the 1st cycle of Basic Education (former primary school) of Vila Maior, creating spaces for library, multipurpose space and refectory, teacher room and attendance. Equipping with school furniture, didactic and computer equipment. There will also be an intervention in the outside arrangements of the school. (English) / qualifier | |||||||||||||||
point in time: 7 July 2021
|
Revision as of 02:15, 7 July 2021
Project Q2870996 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2870996 in Portugal |
Statements
297,049.72 Euro
0 references
85.0 percent
0 references
27 October 2016
0 references
18 August 2020
0 references
MUNICÍPIO DE SÃO PEDRO DO SUL
0 references
A intervenção contempla a Requalificação e Ampliação da escola do 1.º ciclo do Ensino Básico (antiga escola primária) de Vila Maior, criando espaços para biblioteca, espaço polivalente e refeitório, sala de professores e atendimento. Apetrechamento com mobiliário escolar, material didático e informático. haverá ainda uma intervenção nos arranjos exteriores da escola. (Portuguese)
0 references
The intervention includes the requalification and expansion of the school of the 1st cycle of Basic Education (former primary school) of Vila Maior, creating spaces for library, multipurpose space and refectory, teacher room and attendance. Equipping with school furniture, didactic and computer equipment. There will also be an intervention in the outside arrangements of the school. (English)
7 July 2021
0 references
São Pedro do Sul, Vila Maior
0 references
Identifiers
CENTRO-03-5673-FEDER-000080
0 references