Requalification of the Alamo Garden – Alter do Chão (Q2866418): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Alter do Chão / rank
 
Normal rank

Revision as of 19:32, 7 July 2021

Project Q2866418 in Portugal
Language Label Description Also known as
English
Requalification of the Alamo Garden – Alter do Chão
Project Q2866418 in Portugal

    Statements

    0 references
    267,969.08 Euro
    0 references
    85.0 percent
    0 references
    1 March 2018
    0 references
    31 December 2019
    0 references
    MUNICÍPIO DE ALTER DO CHÃO
    0 references

    39°12'0.43"N, 7°39'32.54"W
    0 references
    Este projeto visa uma intervenção ao nível do sistema de aproveitamento das águas pluviais existentes de forma a permitir que a água dê vida à parte do antigo e emblemático sistema de rega do Jardim do Álamo, enquanto elemento de valorização desta quinta histórica. Pretende ainda melhorar as condições de fruição do espaço, com parque infantil, zonas de sombra e estadia, e reforço de mobiliário urbano. (Portuguese)
    0 references
    This project aims to intervene at the level of the system for the use of existing rainwater in order to allow the water to give life to the part of the old and emblematic irrigation system of the Jardim do Álamo, as an element of appreciation of this historic farm. It also intends to improve the conditions of enjoyment of the space, with children’s playgrounds, shade and stay areas, and strengthening urban furniture. (English)
    6 July 2021
    0 references
    Alter do Chão, Alter do Chão
    0 references

    Identifiers

    ALT20-08-2316-FEDER-000044
    0 references