Old Slayer Building – Phase 2 (Q2863527): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Moura / rank
 
Normal rank

Revision as of 18:44, 7 July 2021

Project Q2863527 in Portugal
Language Label Description Also known as
English
Old Slayer Building – Phase 2
Project Q2863527 in Portugal

    Statements

    0 references
    559,093.03 Euro
    0 references
    85.0 percent
    0 references
    17 December 2018
    0 references
    31 December 2021
    0 references
    MUNICIPIO DE MOURA
    0 references
    0 references

    38°9'32.11"N, 7°26'44.95"W
    0 references
    A intervenção proposta refere-se à 2ª fase de reabilitação do edifício do antigo Matadouro para criação de um centro cultural que incorpore o Museu Municipal. Trata-se de uma intervenção que visa contribuir para a salvaguarda da imagem urbana, a reabilitação e revitalização do tecido urbano, das infraestruturas e do acesso a serviços e equipamentos, que genericamente terão tradução em termos da qualidade de vida da população. (Portuguese)
    0 references
    The proposed intervention refers to the 2nd phase of rehabilitation of the old Matadouro building to create a cultural center that incorporates the Municipal Museum. This is an intervention aimed at helping to safeguard the urban image, the rehabilitation and revitalisation of the urban fabric, infrastructure and access to services and equipment, which will generally translate in terms of the quality of life of the population. (English)
    6 July 2021
    0 references
    Moura, União das freguesias de Moura (Santo Agostinho e São João Baptista) e Santo Amador
    0 references

    Identifiers

    ALT20-04-2316-FEDER-000102
    0 references