Intervention in the Land Logistic Circuits of S. Miguel? Requalification of sections of ER 1-1ª between Pilar, João Bom and Monasteries and the ER 7-2ª in Pico do Lume (Q2854030): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The intervention to be carried out is located on two distinct sections, one in E.R. No. 1-1ª between the Pillar of Brittany and the Ramal for the Monasteries, with 8.2 km of extension and the other in E.R. No. 7-2ª between the Botelho area and the branch of connection to the Lagoa/Ribeira Grande highway in Pico do Lume, with 2.5 km of extension, both in the Municipality of Ponta Delgada and a semi-fregues between the Pilgrim and the roads., tran...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Intervention in the Land Logistic Circuits of S. Miguel? Requalification of sections of ER 1-1ª between Pilar, João Bom and Monasteries and the ER 7-2ª in Pico do Lume

Revision as of 17:49, 6 July 2021

Project Q2854030 in Portugal
Language Label Description Also known as
English
Intervention in the Land Logistic Circuits of S. Miguel? Requalification of sections of ER 1-1ª between Pilar, João Bom and Monasteries and the ER 7-2ª in Pico do Lume
Project Q2854030 in Portugal

    Statements

    0 references
    0 references
    961,288.17 Euro
    0 references
    85.0 percent
    0 references
    4 April 2016
    0 references
    30 June 2017
    0 references
    SECRETARIA REGIONAL DAS OBRAS PÚBLICAS E COMUNICAÇÕES
    0 references

    37°44'21.95"N, 25°40'6.10"W
    0 references
    A intervenção a efetuar situa-se em dois troços distintos, um na E.R. nº 1-1ª entre o Pilar da Bretanha e o Ramal para os Mosteiros, com 8,2 km de extensão e o outro na E.R. nº 7-2ª entre a zona do Botelho e o ramo de ligação à via rápida Lagoa/Ribeira Grande no Pico do Fogo, com 2.5 km de extensão, ambos no Concelho de Ponta Delgada.O troço de estrada regional entre as freguesias do Pilar e Mosteiros apresenta um pavimento em semi-penetração b (Portuguese)
    0 references
    The intervention to be carried out is located on two distinct sections, one in E.R. No. 1-1ª between the Pillar of Brittany and the Ramal for the Monasteries, with 8.2 km of extension and the other in E.R. No. 7-2ª between the Botelho area and the branch of connection to the Lagoa/Ribeira Grande highway in Pico do Lume, with 2.5 km of extension, both in the Municipality of Ponta Delgada and a semi-fregues between the Pilgrim and the roads. (English)
    6 July 2021
    0 references
    Ponta Delgada
    0 references

    Identifiers

    ACORES-07-2756-FEDER-000011
    0 references