Q2866477 (Q2866477): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Created claim: summary (P836): Traditional crossing with some confluence of traffic by a roundabout that is characterised by two circular platforms that converge with each other. This intervention is structuring at the level of urban space, as has already been said, could allow for a number of future interventions, which will only be possible with the proposed intervention., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Traditional crossing with some confluence of traffic by a roundabout that is characterised by two circular platforms that converge with each other. This intervention is structuring at the level of urban space, as has already been said, could allow for a number of future interventions, which will only be possible with the proposed intervention. (English) | |||||||||||||||
Property / summary: Traditional crossing with some confluence of traffic by a roundabout that is characterised by two circular platforms that converge with each other. This intervention is structuring at the level of urban space, as has already been said, could allow for a number of future interventions, which will only be possible with the proposed intervention. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Traditional crossing with some confluence of traffic by a roundabout that is characterised by two circular platforms that converge with each other. This intervention is structuring at the level of urban space, as has already been said, could allow for a number of future interventions, which will only be possible with the proposed intervention. (English) / qualifier | |||||||||||||||
point in time: 6 July 2021
|
Revision as of 17:55, 6 July 2021
Project Q2866477 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2866477 in Portugal |
Statements
269,455.71 Euro
0 references
85.0 percent
0 references
1 July 2020
0 references
31 December 2021
0 references
MUNICÍPIO DO CRATO
0 references
Cruzamento tradicional com alguma confluência de tráfego por uma rotunda que se caracteriza por duas plataformas circulares que confluem entre si. Esta intervenção é estruturante ao nível do espaço urbano, como já foi dito, poderá permitir um conjunto de intervenções futuras, que só serão possíveis viabilizar com a intervenção proposta. (Portuguese)
0 references
Traditional crossing with some confluence of traffic by a roundabout that is characterised by two circular platforms that converge with each other. This intervention is structuring at the level of urban space, as has already been said, could allow for a number of future interventions, which will only be possible with the proposed intervention. (English)
6 July 2021
0 references
Crato, União das freguesias de Crato e Mártires, Flor da Rosa e Vale do Peso
0 references
Identifiers
ALT20-08-2316-FEDER-000108
0 references