Q2863582 (Q2863582): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
(‎Created claim: summary (P836): This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira., translated_summary)
Property / summary
 
This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira. (English)
Property / summary: This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira. (English) / rank
 
Normal rank
Property / summary: This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira. (English) / qualifier
 
point in time: 6 July 2021
Timestamp+2021-07-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:26, 6 July 2021

Project Q2863582 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2863582 in Portugal

    Statements

    0 references
    111,536.56 Euro
    0 references
    85.0 percent
    0 references
    1 April 2020
    0 references
    31 July 2021
    0 references
    MUNICÍPIO DE ODEMIRA
    0 references

    37°36'16.63"N, 8°39'53.71"W
    0 references
    Esta operação é realizada no sentido de procurar um ponto de recuperação da paisagem e de ligação entre a fase 1 do projeto, alinhando o bosque com o parque verde da fase 1, numa ampliação da superfície produtiva e transformando um espaço desabitado e quase imperceptível num espaço de lazer da Vila de Odemira. (Portuguese)
    0 references
    This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira. (English)
    6 July 2021
    0 references
    Odemira, São Salvador e Santa Maria
    0 references

    Identifiers

    ALT20-04-2316-FEDER-000132
    0 references