Q2863582 (Q2863582): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
(Created claim: summary (P836): This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira. (English) | |||||||||||||||
Property / summary: This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira. (English) / qualifier | |||||||||||||||
point in time: 6 July 2021
|
Revision as of 17:26, 6 July 2021
Project Q2863582 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2863582 in Portugal |
Statements
111,536.56 Euro
0 references
85.0 percent
0 references
1 April 2020
0 references
31 July 2021
0 references
MUNICÍPIO DE ODEMIRA
0 references
Esta operação é realizada no sentido de procurar um ponto de recuperação da paisagem e de ligação entre a fase 1 do projeto, alinhando o bosque com o parque verde da fase 1, numa ampliação da superfície produtiva e transformando um espaço desabitado e quase imperceptível num espaço de lazer da Vila de Odemira. (Portuguese)
0 references
This operation is carried out in order to seek a point of recovery of the landscape and link between phase 1 of the project, aligning the forest with the green park of phase 1, in an expansion of the productive surface and transforming an uninhabited and almost imperceptible space into a leisure space of Vila de Odemira. (English)
6 July 2021
0 references
Odemira, São Salvador e Santa Maria
0 references
Identifiers
ALT20-04-2316-FEDER-000132
0 references