Q2863418 (Q2863418): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The pedestrian access to the Gate of Traction is integrated into the Requalification and Rehabilitation Project of the Public Space of the Évora Acropolis, which is articulated with the intervention in the Patio and Hermitage of S. Miguel, promoting pedestrian access. The intervention consists of the construction of a side walk and staircase along the S. Miguel Ramp and a clay path from the Gate of the Treason and on the rocky outcrop and repavi...)
Property / summary
 
The pedestrian access to the Gate of Traction is integrated into the Requalification and Rehabilitation Project of the Public Space of the Évora Acropolis, which is articulated with the intervention in the Patio and Hermitage of S. Miguel, promoting pedestrian access. The intervention consists of the construction of a side walk and staircase along the S. Miguel Ramp and a clay path from the Gate of the Treason and on the rocky outcrop and repaviation of the Ramp. (English)
Property / summary: The pedestrian access to the Gate of Traction is integrated into the Requalification and Rehabilitation Project of the Public Space of the Évora Acropolis, which is articulated with the intervention in the Patio and Hermitage of S. Miguel, promoting pedestrian access. The intervention consists of the construction of a side walk and staircase along the S. Miguel Ramp and a clay path from the Gate of the Treason and on the rocky outcrop and repaviation of the Ramp. (English) / rank
 
Normal rank
Property / summary: The pedestrian access to the Gate of Traction is integrated into the Requalification and Rehabilitation Project of the Public Space of the Évora Acropolis, which is articulated with the intervention in the Patio and Hermitage of S. Miguel, promoting pedestrian access. The intervention consists of the construction of a side walk and staircase along the S. Miguel Ramp and a clay path from the Gate of the Treason and on the rocky outcrop and repaviation of the Ramp. (English) / qualifier
 
point in time: 6 July 2021
Timestamp+2021-07-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:46, 6 July 2021

Project Q2863418 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2863418 in Portugal

    Statements

    0 references
    47,903.83 Euro
    0 references
    85.0 percent
    0 references
    1 June 2017
    0 references
    30 December 2019
    0 references
    MUNICÍPIO DE ÉVORA
    0 references
    O Acesso pedonal à Porta da Traição está integrado no Projeto de Requalificação e Reabilitação do Espaço Público da Acrópole de Évora, que se articula com a intervenção no Pátio e Ermida de S. Miguel, promovendo o acesso pedonal. A intervenção consiste na construção de passeio lateral e escadaria ao longo da Rampa de S. Miguel e de um caminho em saibro a partir da Porta da Traição e sobre o afloramento rochoso e repavimentação da Rampa. (Portuguese)
    0 references
    The pedestrian access to the Gate of Traction is integrated into the Requalification and Rehabilitation Project of the Public Space of the Évora Acropolis, which is articulated with the intervention in the Patio and Hermitage of S. Miguel, promoting pedestrian access. The intervention consists of the construction of a side walk and staircase along the S. Miguel Ramp and a clay path from the Gate of the Treason and on the rocky outcrop and repaviation of the Ramp. (English)
    6 July 2021
    0 references
    Évora, União das freguesias de Évora (São Mamede, Sé, São Pedro e Santo Antão)
    0 references

    Identifiers

    ALT20-04-2316-FEDER-000038
    0 references