Q2862892 (Q2862892): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The operation includes works at the José Gomes Ferreira School in Ferreira do Alentejo and aims to create better security conditions for teachers, students and assistants. The intervention consists of the removal of asbestos present in the cover plates and its replacement by coverings without inclusion of this material, in accordance with the current legislation., translated_summary)
Property / summary
 
The operation includes works at the José Gomes Ferreira School in Ferreira do Alentejo and aims to create better security conditions for teachers, students and assistants. The intervention consists of the removal of asbestos present in the cover plates and its replacement by coverings without inclusion of this material, in accordance with the current legislation. (English)
Property / summary: The operation includes works at the José Gomes Ferreira School in Ferreira do Alentejo and aims to create better security conditions for teachers, students and assistants. The intervention consists of the removal of asbestos present in the cover plates and its replacement by coverings without inclusion of this material, in accordance with the current legislation. (English) / rank
 
Normal rank
Property / summary: The operation includes works at the José Gomes Ferreira School in Ferreira do Alentejo and aims to create better security conditions for teachers, students and assistants. The intervention consists of the removal of asbestos present in the cover plates and its replacement by coverings without inclusion of this material, in accordance with the current legislation. (English) / qualifier
 
point in time: 6 July 2021
Timestamp+2021-07-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:41, 6 July 2021

Project Q2862892 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2862892 in Portugal

    Statements

    0 references
    231,523.86 Euro
    0 references
    85.0 percent
    0 references
    2 December 2020
    0 references
    31 August 2021
    0 references
    MUNICIPIO DE FERREIRA DO ALENTEJO
    0 references
    A operação contempla obras na Escola José Gomes Ferreira em Ferreira do Alentejo e visa criar melhores condições de segurança para os docentes, alunos e auxiliares. A intervenção consiste na remoção do amianto presente nas placas da cobertura e sua substituição por coberturas sem inclusão desse material, de acordo com a legislação vigente. (Portuguese)
    0 references
    The operation includes works at the José Gomes Ferreira School in Ferreira do Alentejo and aims to create better security conditions for teachers, students and assistants. The intervention consists of the removal of asbestos present in the cover plates and its replacement by coverings without inclusion of this material, in accordance with the current legislation. (English)
    6 July 2021
    0 references
    Ferreira do Alentejo
    0 references

    Identifiers

    ALT20-02-5673-FEDER-000155
    0 references