Q2854004 (Q2854004): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The operation consists of an intervention on the coastline, extending through the creation of a short but fundamental section of the Atlantic Walk. It is planned to build a new bridge, with a total length of 64 meters and develops between the mouth of the river and the street of Feira/Travessa da Praia.The project is planned in Pirus da Ribeira Grande, through the action 1.20.The projects and supervision associated with this project are included...)
Property / summary
 
The operation consists of an intervention on the coastline, extending through the creation of a short but fundamental section of the Atlantic Walk. It is planned to build a new bridge, with a total length of 64 meters and develops between the mouth of the river and the street of Feira/Travessa da Praia.The project is planned in Pirus da Ribeira Grande, through the action 1.20.The projects and supervision associated with this project are included. (English)
Property / summary: The operation consists of an intervention on the coastline, extending through the creation of a short but fundamental section of the Atlantic Walk. It is planned to build a new bridge, with a total length of 64 meters and develops between the mouth of the river and the street of Feira/Travessa da Praia.The project is planned in Pirus da Ribeira Grande, through the action 1.20.The projects and supervision associated with this project are included. (English) / rank
 
Normal rank
Property / summary: The operation consists of an intervention on the coastline, extending through the creation of a short but fundamental section of the Atlantic Walk. It is planned to build a new bridge, with a total length of 64 meters and develops between the mouth of the river and the street of Feira/Travessa da Praia.The project is planned in Pirus da Ribeira Grande, through the action 1.20.The projects and supervision associated with this project are included. (English) / qualifier
 
point in time: 6 July 2021
Timestamp+2021-07-06T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:43, 6 July 2021

Project Q2854004 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2854004 in Portugal

    Statements

    0 references
    954,680.2 Euro
    0 references
    85.0 percent
    0 references
    31 December 2015
    0 references
    30 August 2019
    0 references
    MUNICIPIO DA RIBEIRA GRANDE
    0 references
    A operação consiste numa intervenção na orla costeira, estendendo-se, através da criação de um curto, mas fundamental troço do Passeio Atlântico. Está prevista a construção de uma nova ponte, com extensão total de 64 metros e desenvolve-se entre a foz da ribeira e a rua da Feira/Travessa da Praia.O projeto encontra-se previsto no PIRUS da Ribeira Grande, através da ação 1.20.Estão incluídos os projetos e a fiscalização associados a esta inter (Portuguese)
    0 references
    The operation consists of an intervention on the coastline, extending through the creation of a short but fundamental section of the Atlantic Walk. It is planned to build a new bridge, with a total length of 64 meters and develops between the mouth of the river and the street of Feira/Travessa da Praia.The project is planned in Pirus da Ribeira Grande, through the action 1.20.The projects and supervision associated with this project are included. (English)
    6 July 2021
    0 references
    Ribeira Grande
    0 references

    Identifiers

    ACORES-06-2316-FEDER-000025
    0 references