Q2853931 (Q2853931): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Created claim: summary (P836): The project of Consul Dabney’s Involvement includes the implementation of the basic sanitation of this road and its surroundings, notably through the construction of approximately 1500 ml of water distribution network, 1400 ml of domestic wastewater collectors and 1800 ml of rainwater collectors. Linked to these networks are all the necessary infrastructures for their proper functioning, such as: Control system, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project of Consul Dabney’s Involvement includes the implementation of the basic sanitation of this road and its surroundings, notably through the construction of approximately 1500 ml of water distribution network, 1400 ml of domestic wastewater collectors and 1800 ml of rainwater collectors. Linked to these networks are all the necessary infrastructures for their proper functioning, such as: Control system (English) | |||||||||||||||
Property / summary: The project of Consul Dabney’s Involvement includes the implementation of the basic sanitation of this road and its surroundings, notably through the construction of approximately 1500 ml of water distribution network, 1400 ml of domestic wastewater collectors and 1800 ml of rainwater collectors. Linked to these networks are all the necessary infrastructures for their proper functioning, such as: Control system (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project of Consul Dabney’s Involvement includes the implementation of the basic sanitation of this road and its surroundings, notably through the construction of approximately 1500 ml of water distribution network, 1400 ml of domestic wastewater collectors and 1800 ml of rainwater collectors. Linked to these networks are all the necessary infrastructures for their proper functioning, such as: Control system (English) / qualifier | |||||||||||||||
point in time: 6 July 2021
|
Revision as of 12:42, 6 July 2021
Project Q2853931 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2853931 in Portugal |
Statements
803,687.61 Euro
0 references
85.0 percent
0 references
1 August 2016
0 references
30 November 2017
0 references
MUNICÍPIO DA HORTA
0 references
O projecto da Envolvente da Cônsul Dabney inclui a execução do saneamento básico deste arruamento e da sua envolvente, nomeadamente através da construção de, aproximadamente, 1500 ml de rede de distribuição de água, 1400 ml de coletores de águas residuais domésticas e 1800 ml de coletores de águas residuais pluviais. Associado a estas redes estão todas as infra-estruturas necessárias ao seu correcto funcionamento, como sejam: sistema de controlo (Portuguese)
0 references
The project of Consul Dabney’s Involvement includes the implementation of the basic sanitation of this road and its surroundings, notably through the construction of approximately 1500 ml of water distribution network, 1400 ml of domestic wastewater collectors and 1800 ml of rainwater collectors. Linked to these networks are all the necessary infrastructures for their proper functioning, such as: Control system (English)
6 July 2021
0 references
Horta
0 references
Identifiers
ACORES-06-2012-FEDER-000011
0 references