(Created claim: summary (P836): The operation consists of the installation of the Energy Storage System, having chosen the location next to the substation of Caldeirão, where EDA has its own land, on the other hand, it is the best location considering its proximity to the main consumption centers.On the other hand, there is the advantage of reducing losses, with the possibility of injection/consumption of reactive power, made available by the System of Storage, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The operation consists of the installation of the Energy Storage System, having chosen the location next to the substation of Caldeirão, where EDA has its own land, on the other hand, it is the best location considering its proximity to the main consumption centers.On the other hand, there is the advantage of reducing losses, with the possibility of injection/consumption of reactive power, made available by the System of Storage (English) | |||||||||||||||
Property / summary: The operation consists of the installation of the Energy Storage System, having chosen the location next to the substation of Caldeirão, where EDA has its own land, on the other hand, it is the best location considering its proximity to the main consumption centers.On the other hand, there is the advantage of reducing losses, with the possibility of injection/consumption of reactive power, made available by the System of Storage (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation consists of the installation of the Energy Storage System, having chosen the location next to the substation of Caldeirão, where EDA has its own land, on the other hand, it is the best location considering its proximity to the main consumption centers.On the other hand, there is the advantage of reducing losses, with the possibility of injection/consumption of reactive power, made available by the System of Storage (English) / qualifier | |||||||||||||||
point in time: 6 July 2021
|
Revision as of 12:37, 6 July 2021
Project Q2853703 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2853703 in Portugal |
Statements
20,000,000.0 Euro
0 references
79.0 percent
0 references
16 July 2018
0 references
30 September 2022
0 references
EDA - ELECTRICIDADE DOS AÇORES, S.A.
0 references
A operação consiste na instalação de Sistema de Armazenamento de Energia, tendo-se escolhido a localização junto à subestação do Caldeirão, onde a EDA possui terreno próprio, por outro lado, trata-se da melhor localização tendo em conta a sua proximidade aos principais centros de consumo.Por outro lado, existe a vantagem de redução de perdas, com a possibilidade de injeção/consumo de potência reativa, disponibilizada pelo Sistema de Armazenamen (Portuguese)
0 references
The operation consists of the installation of the Energy Storage System, having chosen the location next to the substation of Caldeirão, where EDA has its own land, on the other hand, it is the best location considering its proximity to the main consumption centers.On the other hand, there is the advantage of reducing losses, with the possibility of injection/consumption of reactive power, made available by the System of Storage (English)
6 July 2021
0 references
Ribeira Grande
0 references
Identifiers
ACORES-04-1001-FEDER-000002
0 references