Installation of signalling system and ETCS Level 1 at the single railway line Thessaloniki Idomeni (through the new variant at Polykastro Idomeni section) and replace 37 switches for signalling needs. (Q2778302): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in greece) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 11:06, 27 September 2021
Project Q2778302 in Greece
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of signalling system and ETCS Level 1 at the single railway line Thessaloniki Idomeni (through the new variant at Polykastro Idomeni section) and replace 37 switches for signalling needs. |
Project Q2778302 in Greece |
Statements
46,488,000.0 Euro
0 references
29 May 2020
0 references
31 December 2023
0 references
ΕΡΓΟΣΕ ΑΕ
0 references
Στο πλαίσιο του έργου θα υλοποιηθεί η εγκατάσταση συστήματος Σηματοδότησης - Τηλεδιοίκησης ETCS (European Train Control System) Level 1, της μονής σιδηροδρομικής γραμμής Θεσσαλονίκη - Ειδομένη, με σκοπό τη μεγιστοποίηση της ασφάλειας των επιβατικών και εμπορευματικών σιδηροδρομικών μεταφορών και τη συμμόρφωση με τις αρχές της Διαλειτουργικότητας. (Greek)
0 references
In the framework of the project, the installation of the ETCS (European Train Control System) Level 1, the single railway line Thessaloniki – Idomeni, will be implemented in order to maximise the safety of passenger and freight rail transport and to comply with the principles of Interoperability. (English)
2 July 2021
0 references
Identifiers
5.041.829
0 references