School open to the world (Q130846): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): A project carried out in the area of oil oil by 24 mce of this 21 mce will be carried out in a systematic way for children. The general objective of the project is to increase the key competences of 18 (6K, 12M) of children in the front line. GR is: 16 children in the morning. 4 teachers, 16 parents/op. Legal. The objective will be achieved through the provision of children for the purpose of shaping and developing children who are key to the ed...)
Property / summary
 
A project carried out in the area of oil oil by 24 mce of this 21 mce will be carried out in a systematic way for children. The general objective of the project is to increase the key competences of 18 (6K, 12M) of children in the front line. GR is: 16 children in the morning. 4 teachers, 16 parents/op. Legal. The objective will be achieved through the provision of children for the purpose of shaping and developing children who are key to the education and training of children, in addition to the skills, composition or qualifications of teachers and parents/op. children from the PLO as regards the applicability of methods and forms of org. favouring education and the development of key children. In order to be effective, equipment and materials are required to be retrofitted in equipment and materials. As a result of proj. 18 children will increase the mix of key, 4 teachers, representing 100 % of the teaching staff, the skills, the mix of methods used and the form of orgones that encourage the formation and development of children at the front end of the school. 16 parents/op. cit will be used to support children in shaping key competences. Products; 18 children subject to additional activities, 4 and are objective objective (16). After receiving support, the project will be complementary to 9.1.1 2009-2011. will be addressed through ESF measures in 2007-13/2014-20. In real terms, we will take them with an extract of the tools, methods and forms. in the framework of the PROJ.INNOVATION PROJ.INNOVATION PROHAND-LENDING, in the latach2007-13 POKL: GminaKielce/MijikZesp.Porad.Psychologists — Pedagog.inKielce, ‘Academy of Career Development’ (‘Academy of Career Development’). and e-works/e-resources/e-materials. Creating the ESF in 2007-13 or 2014-20-approved for school use by the MEN (English)
Property / summary: A project carried out in the area of oil oil by 24 mce of this 21 mce will be carried out in a systematic way for children. The general objective of the project is to increase the key competences of 18 (6K, 12M) of children in the front line. GR is: 16 children in the morning. 4 teachers, 16 parents/op. Legal. The objective will be achieved through the provision of children for the purpose of shaping and developing children who are key to the education and training of children, in addition to the skills, composition or qualifications of teachers and parents/op. children from the PLO as regards the applicability of methods and forms of org. favouring education and the development of key children. In order to be effective, equipment and materials are required to be retrofitted in equipment and materials. As a result of proj. 18 children will increase the mix of key, 4 teachers, representing 100 % of the teaching staff, the skills, the mix of methods used and the form of orgones that encourage the formation and development of children at the front end of the school. 16 parents/op. cit will be used to support children in shaping key competences. Products; 18 children subject to additional activities, 4 and are objective objective (16). After receiving support, the project will be complementary to 9.1.1 2009-2011. will be addressed through ESF measures in 2007-13/2014-20. In real terms, we will take them with an extract of the tools, methods and forms. in the framework of the PROJ.INNOVATION PROJ.INNOVATION PROHAND-LENDING, in the latach2007-13 POKL: GminaKielce/MijikZesp.Porad.Psychologists — Pedagog.inKielce, ‘Academy of Career Development’ (‘Academy of Career Development’). and e-works/e-resources/e-materials. Creating the ESF in 2007-13 or 2014-20-approved for school use by the MEN (English) / rank
 
Normal rank

Revision as of 13:09, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
School open to the world
Project in Poland financed by DG Regio

    Statements

    0 references
    207,357.01 zloty
    0 references
    49,765.6824 Euro
    13 January 2020
    0 references
    244,931.35 zloty
    0 references
    58,783.524 Euro
    13 January 2020
    0 references
    84.66 percent
    0 references
    1 August 2018
    0 references
    31 July 2020
    0 references
    GMINA OLECKO
    0 references
    Projekt realizowany na terenie gm. Olecko przez 24 msce w tym 21 mscy będą prowadzone systematycznie zajęcia dodatkowe dla dzieci. Celem ogólnym projektu jest zwiększenie kompetencji kluczowych 18(6K, 12M) dzieci w wieku przedszk. Gr. doc. stanowią: 16 dzieci przedszk. 4 nauczycielki, 16 rodziców/op. Prawnych. Cel zostanie osiągnięty poprzez realiz. zajęć dla dzieci mających na celu kształtow. i rozwijanie u dzieci komp. kluczowych, ponadto doskonal. umiejętności, komp. lub kwalifikacji nauczycielek oraz rodzic./op. prawnych dzieci z OWP w zakresie stosow. metod i form org. sprzyjających kształt. i rozwijaniu u dzieci komp. kluczowych. Aby zajęcia były efektywne niezbędne jest doposażenie placówki w sprzęt i materiały. W wyniku realizacji proj. 18 dzieci podniesie komp. kluczowe, 4 nauczycielki, co stanowi 100% zatrudnionej kadry nauczycielskiej, nabędzie umiejętności, podniesie komp. w zakresie stosowania metod oraz form org. sprzyjających kształtowaniu i rozwijaniu u dzieci w wieku przedszk. 16 rodziców/op. prawnych zdobędzie komp. do wspierania dzieci w zakresie kształtowania kluczowych kompetencji. Produkty;18 dzieci objetych dodatkowymi zajęciami, 4 na-li objetych doskonal., 16 rodzic/op.pr. , którzy otrzym wsparcie Projekt jest komplementarny z 9.1.1 2009-2011 W proj. zastosow. zostaną rozwiąz. wypracow. dzięki środkom EFS w latach 2007-13lub 2014-20. Real. zaj. odbędzie się z wykorz. narzę, metod, form wypracow. w ramach PROJ.INNOWACYJEGO POZYTYWNIE ZWALIDOW w latach2007-13 POKL: GminaKielce/MiejskiZesp.Porad.Psycholog-Pedagog.wKielcach„Akademia Kariery”, podcz. zaj. wykorzyst. zastanie opracow. model pracy z 3-5latkiem, zest. scenariuszy praktycz. z załącz. audiowizualnymi, publikacja zawieraj. mater. metodycz. z komentarz. naukowymi; i e-podręcz. bądź e-zasobów/e-materiałów dydakt. Stworz. dzięki EFS w latach 2007-13 lub 2014-20-dopuszczone do użytku szkoln. przez MEN (Polish)
    0 references
    A project carried out in the area of oil oil by 24 mce of this 21 mce will be carried out in a systematic way for children. The general objective of the project is to increase the key competences of 18 (6K, 12M) of children in the front line. GR is: 16 children in the morning. 4 teachers, 16 parents/op. Legal. The objective will be achieved through the provision of children for the purpose of shaping and developing children who are key to the education and training of children, in addition to the skills, composition or qualifications of teachers and parents/op. children from the PLO as regards the applicability of methods and forms of org. favouring education and the development of key children. In order to be effective, equipment and materials are required to be retrofitted in equipment and materials. As a result of proj. 18 children will increase the mix of key, 4 teachers, representing 100 % of the teaching staff, the skills, the mix of methods used and the form of orgones that encourage the formation and development of children at the front end of the school. 16 parents/op. cit will be used to support children in shaping key competences. Products; 18 children subject to additional activities, 4 and are objective objective (16). After receiving support, the project will be complementary to 9.1.1 2009-2011. will be addressed through ESF measures in 2007-13/2014-20. In real terms, we will take them with an extract of the tools, methods and forms. in the framework of the PROJ.INNOVATION PROJ.INNOVATION PROHAND-LENDING, in the latach2007-13 POKL: GminaKielce/MijikZesp.Porad.Psychologists — Pedagog.inKielce, ‘Academy of Career Development’ (‘Academy of Career Development’). and e-works/e-resources/e-materials. Creating the ESF in 2007-13 or 2014-20-approved for school use by the MEN (English)
    0 references

    Identifiers

    RPWM.02.01.00-28-0102/17
    0 references