Construction of a system for the collection of municipal waste in the municipality of Kartuzy (Q122540): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The main purpose of the project is to increase the efficiency of the urban sprawl regime in the municipality of Kartabuje. the planned project is linked to the development of the infrastructure for the separate collection of municipal waste, and the construction of a separate collection point for municipal waste in the Karteusis, which will also be equipped with: — the repair point, the re-use point, the collection point for waste electrical and...)
Property / summary
 
The main purpose of the project is to increase the efficiency of the urban sprawl regime in the municipality of Kartabuje. the planned project is linked to the development of the infrastructure for the separate collection of municipal waste, and the construction of a separate collection point for municipal waste in the Karteusis, which will also be equipped with: — the repair point, the re-use point, the collection point for waste electrical and electronic equipment, the Green Education Centre along with an educational pathway, two points for the collection of problem waste in M. Brodnica Górna and Staniszewo. The project is a project involving private capital, promoting effective technological solutions, limiting the storage of a biodegradable, biodegradable, hospitable environment for a high level of activity for residents, including the development of desirable ecological focus. The implementation of the project results from an investment plan in annex WPO2022. (English)
Property / summary: The main purpose of the project is to increase the efficiency of the urban sprawl regime in the municipality of Kartabuje. the planned project is linked to the development of the infrastructure for the separate collection of municipal waste, and the construction of a separate collection point for municipal waste in the Karteusis, which will also be equipped with: — the repair point, the re-use point, the collection point for waste electrical and electronic equipment, the Green Education Centre along with an educational pathway, two points for the collection of problem waste in M. Brodnica Górna and Staniszewo. The project is a project involving private capital, promoting effective technological solutions, limiting the storage of a biodegradable, biodegradable, hospitable environment for a high level of activity for residents, including the development of desirable ecological focus. The implementation of the project results from an investment plan in annex WPO2022. (English) / rank
 
Normal rank

Revision as of 09:52, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a system for the collection of municipal waste in the municipality of Kartuzy
Project in Poland financed by DG Regio

    Statements

    0 references
    2,454,888.95 zloty
    0 references
    589,173.348 Euro
    13 January 2020
    0 references
    2,888,104.65 zloty
    0 references
    693,145.1159999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 September 2018
    0 references
    31 December 2020
    0 references
    GMINA KARTUZY
    0 references
    Głównym celem realizacji projektu jest zwiększenie efektywności funkcjonującego systemu zagospodarowania odp. komunalnych na terenie Gminy Kartuzy.Planowane przedsięwzięcie związane jest z rozwojem infrastruktury selektywnego zbierania odpadów komunalnych, a dokładnie budowę punktu selektywnego zbierania odpadów komunalnych w m. Kartuzy, który dodatkowo wyposażony zostanie w: - punkt napraw, - punkt ponownego użycia, - punkt zbierania zużytego sprzętu elektrycznego i elektronicznego, - centrum edukacji ekologicznej wraz ze ścieżką edukacyjną, - dwa punkty do zbierania odpadów problemowych w m. Brodnica Górna i Staniszewo. Projekt ten jest projektem angażującym kapitał prywatny, upowszechniający efektywne rozwiązania technologiczne, ograniczający składowanie odp. biodegradowalnych, sprzyjający tworzeniu warunków dla wysokiej aktywności mieszkańców, w tym kształtowaniu pożądanych postaw proekologicznych. Realizacja projektu wynika z planu inwestycyjnego będącego załącznikiem WPGO2022. (Polish)
    0 references
    The main purpose of the project is to increase the efficiency of the urban sprawl regime in the municipality of Kartabuje. the planned project is linked to the development of the infrastructure for the separate collection of municipal waste, and the construction of a separate collection point for municipal waste in the Karteusis, which will also be equipped with: — the repair point, the re-use point, the collection point for waste electrical and electronic equipment, the Green Education Centre along with an educational pathway, two points for the collection of problem waste in M. Brodnica Górna and Staniszewo. The project is a project involving private capital, promoting effective technological solutions, limiting the storage of a biodegradable, biodegradable, hospitable environment for a high level of activity for residents, including the development of desirable ecological focus. The implementation of the project results from an investment plan in annex WPO2022. (English)
    0 references

    Identifiers

    RPPM.11.02.00-22-0009/17
    0 references