Q2822277 (Q2822277): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Created claim: summary (P836): The main object of the project is the main road link, AK Terovo on the Ionian Road (on the 7th Provincial Road of Ioannina – Pigadia) with the 2nd Provincial Road of Ioannina – Plaka Bridge with a total length of 9809.27 m, which is almost universally new design and not improvement of a pre-existing road.The project comprises two level connections and the 7th road connection. Also, the installation of road lighting will be implemented in an appr...) |
||||||||||||||
Property / summary | |||||||||||||||
The main object of the project is the main road link, AK Terovo on the Ionian Road (on the 7th Provincial Road of Ioannina – Pigadia) with the 2nd Provincial Road of Ioannina – Plaka Bridge with a total length of 9809.27 m, which is almost universally new design and not improvement of a pre-existing road.The project comprises two level connections and the 7th road connection. Also, the installation of road lighting will be implemented in an appropriate length and layout at all 5 level knots in order to complete phototechnical control. Bridge will be constructed 134.0 m long from ch.f. 7+ 316.52 to x.h. 7+ 450.50 Main Road. This bridge provides for the installation of road illumination both on the bridge and on either side of the bridge at distances of 50 meters, with distances of 25 meters. (English) | |||||||||||||||
Property / summary: The main object of the project is the main road link, AK Terovo on the Ionian Road (on the 7th Provincial Road of Ioannina – Pigadia) with the 2nd Provincial Road of Ioannina – Plaka Bridge with a total length of 9809.27 m, which is almost universally new design and not improvement of a pre-existing road.The project comprises two level connections and the 7th road connection. Also, the installation of road lighting will be implemented in an appropriate length and layout at all 5 level knots in order to complete phototechnical control. Bridge will be constructed 134.0 m long from ch.f. 7+ 316.52 to x.h. 7+ 450.50 Main Road. This bridge provides for the installation of road illumination both on the bridge and on either side of the bridge at distances of 50 meters, with distances of 25 meters. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The main object of the project is the main road link, AK Terovo on the Ionian Road (on the 7th Provincial Road of Ioannina – Pigadia) with the 2nd Provincial Road of Ioannina – Plaka Bridge with a total length of 9809.27 m, which is almost universally new design and not improvement of a pre-existing road.The project comprises two level connections and the 7th road connection. Also, the installation of road lighting will be implemented in an appropriate length and layout at all 5 level knots in order to complete phototechnical control. Bridge will be constructed 134.0 m long from ch.f. 7+ 316.52 to x.h. 7+ 450.50 Main Road. This bridge provides for the installation of road illumination both on the bridge and on either side of the bridge at distances of 50 meters, with distances of 25 meters. (English) / qualifier | |||||||||||||||
point in time: 5 July 2021
|
Revision as of 18:54, 5 July 2021
Project Q2822277 in Greece
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q2822277 in Greece |
Statements
10,916,832.0 Euro
0 references
80.0 percent
0 references
17 May 2017
0 references
14 January 2022
0 references
ΠΕΡΙΦΕΡΕΙΑ ΗΠΕΙΡΟΥ
0 references
Tο βασικό αντικείμενο του έργου είναι ο κύριος οδικός άξονας σύνδεσης, του ΑΚ Τερόβου της Ιόνιας Οδού (επί της 7ης Επαρχιακής Οδού Ιωαννίνων - Πηγαδιών) με την 2η Επαρχιακή Οδό Ιωαννίνων - Γέφυρα Πλάκας με συνολικό μήκος 9,809.27m, που αποτελεί σχεδόν καθολικά νέα χάραξη και όχι βελτίωση κάποιας προϋφιστάμενης οδού.Το έργο περιλαμβάνει δύο ισόπεδες συνδέσεις αυτού με την 7η και την 2η Επαρχιακή Οδό καθώς και άλλες τρείς που αποκαθιστούν την οδική σύνδεση με το υπάρχον οδικό δίκτυο. Επίσης θα υλοποιηθεί η εγκατάσταση οδοφωτισμών σε κατάλληλο μήκος και διάταξη και στους 5 ισόπεδους κόμβους με σκοπό τον πλήρη φωτοτεχνικό έλεγχό τους. θα κατασκευαστεί Γέφυρα μήκους 134.0m από χ.θ. 7+316.52 έως χ.θ. 7+450.50 της Κύριας Οδού. Για τη συγκεκριμένη γέφυρα προβλέπεται η εγκατάσταση οδοφωτισμού τόσο πάνω στη γέφυρα, όσο εκατέρωθεν αυτής σε αποστάσεις 50 μέτρων, με αποστάσεις ιστών 25 μέτρα. (Greek)
0 references
The main object of the project is the main road link, AK Terovo on the Ionian Road (on the 7th Provincial Road of Ioannina – Pigadia) with the 2nd Provincial Road of Ioannina – Plaka Bridge with a total length of 9809.27 m, which is almost universally new design and not improvement of a pre-existing road.The project comprises two level connections and the 7th road connection. Also, the installation of road lighting will be implemented in an appropriate length and layout at all 5 level knots in order to complete phototechnical control. Bridge will be constructed 134.0 m long from ch.f. 7+ 316.52 to x.h. 7+ 450.50 Main Road. This bridge provides for the installation of road illumination both on the bridge and on either side of the bridge at distances of 50 meters, with distances of 25 meters. (English)
5 July 2021
0 references
Identifiers
5.001.576
0 references