Low-energy public buildings — Thermomodernisation of the Town Hall Building in Chechnya, (Q123822): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project is located in the Czech Republic and includes the deep renovation of the Town Hall building at ul. The th anniversary of the PRL 6. — the thermal modernisation of all the building envelope, including the reconstruction of the terrace with warming (as a thermal bridge), the replacement of window and door frames, conductor frames and accompanying works, — replacement of the secondary installations, — replacement of the lighting fitting...) |
||
Property / summary | |||
The project is located in the Czech Republic and includes the deep renovation of the Town Hall building at ul. The th anniversary of the PRL 6. — the thermal modernisation of all the building envelope, including the reconstruction of the terrace with warming (as a thermal bridge), the replacement of window and door frames, conductor frames and accompanying works, — replacement of the secondary installations, — replacement of the lighting fittings of the light fittings. In addition, the adaptation work at the facility (non-eligible costs) is: Modification of the object’s functional layout and modification of the use of the premises by the MOPS to the new children’s department, including alterations to the internal installation of sanitary and electrical facilities in the premises, the renovation of the atrium and the fitting-out of the site. The project will allow a reduction of the energy balance of the site (described in the final energy savings ratio) by 64.1 %, as well as a reduction of its environmental pressure (secondary emission reduction). (English) | |||
Property / summary: The project is located in the Czech Republic and includes the deep renovation of the Town Hall building at ul. The th anniversary of the PRL 6. — the thermal modernisation of all the building envelope, including the reconstruction of the terrace with warming (as a thermal bridge), the replacement of window and door frames, conductor frames and accompanying works, — replacement of the secondary installations, — replacement of the lighting fittings of the light fittings. In addition, the adaptation work at the facility (non-eligible costs) is: Modification of the object’s functional layout and modification of the use of the premises by the MOPS to the new children’s department, including alterations to the internal installation of sanitary and electrical facilities in the premises, the renovation of the atrium and the fitting-out of the site. The project will allow a reduction of the energy balance of the site (described in the final energy savings ratio) by 64.1 %, as well as a reduction of its environmental pressure (secondary emission reduction). (English) / rank | |||
Normal rank |
Revision as of 10:00, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Low-energy public buildings — Thermomodernisation of the Town Hall Building in Chechnya, |
Project in Poland financed by DG Regio |
Statements
1,151,118.36 zloty
0 references
2,168,736.36 zloty
0 references
85.0 percent
0 references
21 December 2015
0 references
31 October 2016
0 references
MIASTO CZELADŹ
0 references
Przedsięwzięcie zlokalizowane jest w Czeladzi i obejmuje głęboką termomodernizację budynku Żłobka Miejskiego przy ul. XXXV-lecia PRL 6. - termomodernizację wszystkich przegród zewnętrznych obiektu, w tym przebudowę tarasu z ociepleniem (jako mostkiem cieplnym), - wymianę stolarki okiennej i drzwiowej, montażem nawiewników wraz z robotami towarzyszącymi, - wymianę instalacji c.o., - wymianę instalacji opraw świetlnych na energooszczędne. Ponadto, pracami adaptacyjnymi w obiekcie (koszty niekwalifikowane) są: - przebudowa układu funkcjonalnego obiektu i zmiana sposobu użytkowania pomieszczeń po MOPS na nowy oddział dziecięcy, - przebudowa instalacji wewnętrznych sanitarnych i elektrycznych w pomieszczeniach, - przebudowa atrium oraz zagospodarowania terenu. Dzięki omawianemu przedsięwzięciu możliwe będzie zmniejszenie bilansu energetycznego obiektu (opisanego wskaźnikiem oszczędności energii końcowej) o 64,1%, a także zmniejszeniem jego presji na środowisko (redukcją emisji wtórnej). (Polish)
0 references
The project is located in the Czech Republic and includes the deep renovation of the Town Hall building at ul. The th anniversary of the PRL 6. — the thermal modernisation of all the building envelope, including the reconstruction of the terrace with warming (as a thermal bridge), the replacement of window and door frames, conductor frames and accompanying works, — replacement of the secondary installations, — replacement of the lighting fittings of the light fittings. In addition, the adaptation work at the facility (non-eligible costs) is: Modification of the object’s functional layout and modification of the use of the premises by the MOPS to the new children’s department, including alterations to the internal installation of sanitary and electrical facilities in the premises, the renovation of the atrium and the fitting-out of the site. The project will allow a reduction of the energy balance of the site (described in the final energy savings ratio) by 64.1 %, as well as a reduction of its environmental pressure (secondary emission reduction). (English)
0 references
Identifiers
RPSL.04.03.01-24-03H1/16
0 references