Expansion of the zone of economic activity in Andrychów by arming new investment areas and expansion and reconstruction of road infrastructure in the zone (Q111686): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in pt)
 
(36 intermediate revisions by 2 users not shown)
label / enlabel / en
Expansion of the economic activity zone in Andrapidly through the setting up of new investment sites and the extension and upgrading of road infrastructure in the area
Expansion of the zone of economic activity in Andrychów by arming new investment areas and expansion and reconstruction of road infrastructure in the zone
label / frlabel / fr
 
Extension de la zone d’activité économique à Andrychów par l’armement de nouvelles zones d’investissement et l’expansion et le réaménagement des infrastructures routières dans la zone
label / delabel / de
 
Erweiterung der Wirtschaftszone in Andrychów durch Bewaffnung neuer Investitionsgebiete und Ausbau und Sanierung der Straßeninfrastruktur in der Zone
label / nllabel / nl
 
Uitbreiding van de economische activiteitszone in Andrychów door de bewapening van nieuwe investeringsgebieden en uitbreiding en herontwikkeling van wegeninfrastructuur in de zone
label / itlabel / it
 
Ampliamento della zona di attività economica di Andrychów armando nuove aree di investimento e ampliando e riqualificando le infrastrutture stradali nella zona
label / eslabel / es
 
Ampliación de la zona de actividad económica de Andrychów armando nuevas áreas de inversión y ampliando y reurbanizando la infraestructura vial en la zona
label / dalabel / da
 
Udvidelse af den økonomiske aktivitetszone i Andrychów ved at bevæbne nye investeringsområder og udvide og omlægge vejinfrastrukturen i zonen
label / ellabel / el
 
Επέκταση της ζώνης οικονομικής δραστηριότητας στο Andrychów με τον εξοπλισμό νέων επενδυτικών περιοχών και την επέκταση και ανάπλαση των οδικών υποδομών στη ζώνη
label / hrlabel / hr
 
Proširenje zone gospodarske djelatnosti u Andrychówu naoružavanjem novih područja ulaganja te širenjem i prenamjenom cestovne infrastrukture u zoni
label / rolabel / ro
 
Extinderea zonei de activitate economică din Andrychów prin înarmarea de noi zone de investiții și extinderea și reamenajarea infrastructurii rutiere în zonă
label / sklabel / sk
 
Rozšírenie zóny hospodárskej činnosti v Andrychówe vyzbrojením nových investičných oblastí a rozšírením a prestavbou cestnej infraštruktúry v zóne
label / mtlabel / mt
 
L-espansjoni taż-żona ta’ attività ekonomika f’Andrychów permezz tal-armar ta’ żoni ġodda ta’ investiment u l-espansjoni u l-iżvilupp mill-ġdid tal-infrastruttura tat-toroq fiż-żona
label / ptlabel / pt
 
Expansão da zona de atividade económica em Andrychów através do armamento de novas áreas de investimento e da expansão e reconstrução das infraestruturas rodoviárias na zona
label / filabel / fi
 
Andrychówin taloudellisen toiminnan vyöhykkeen laajentaminen aseistamalla uusia investointialueita ja laajentamalla ja kehittämällä alueen tieinfrastruktuuria
label / sllabel / sl
 
Razširitev območja gospodarske dejavnosti v Andrychówu z oborožitvijo novih naložbenih območij ter razširitvijo in prenovo cestne infrastrukture v coni
label / cslabel / cs
 
Rozšíření zóny ekonomické aktivity v Andrychóvu vyzbrojováním nových investičních oblastí a rozšířením a rekonstrukcí silniční infrastruktury v zóně
label / ltlabel / lt
 
Ekonominės veiklos zonos plėtra Andrychów apginkluojant naujas investicijų zonas ir plečiant bei pertvarkant kelių infrastruktūrą zonoje
label / lvlabel / lv
 
Ekonomiskās darbības zonas paplašināšana Andrišovā, ierīkojot jaunas investīciju zonas un paplašinot un atjaunojot ceļu infrastruktūru zonā
label / bglabel / bg
 
Разширяване на зоната на икономическа дейност в Andrychów чрез въоръжаване на нови инвестиционни зони и разширяване и реконструкция на пътната инфраструктура в зоната
label / hulabel / hu
 
Andrychów gazdasági tevékenységi övezetének bővítése új beruházási területek felfegyverzésével, valamint az útinfrastruktúra bővítésével és felújításával az övezetben
label / galabel / ga
 
Leathnú an chreasa gníomhaíochta eacnamaíche in Andrychów trí limistéir infheistíochta nua a ainmniú agus trí bhonneagar bóithre sa chrios a leathnú agus a athfhorbairt
label / svlabel / sv
 
Utvidgning av den ekonomiska verksamhetszonen i Andrychów genom beväpning av nya investeringsområden och utbyggnad och ombyggnad av väginfrastrukturen i området
label / etlabel / et
 
Andrychówi majandustegevuse tsooni laiendamine uute investeerimispiirkondade varustamise ning maanteede infrastruktuuri laiendamise ja ümberehitamisega piirkonnas
description / endescription / en
Project in Poland financed by DG Regio
Project Q111686 in Poland
description / pldescription / pl
Projekt w Polsce finansowany przez DG Regio
Projekt Q111686 w Polsce
description / bgdescription / bg
 
Проект Q111686 в Полша
description / hrdescription / hr
 
Projekt Q111686 u Poljskoj
description / hudescription / hu
 
Projekt Q111686 Lengyelországban
description / csdescription / cs
 
Projekt Q111686 v Polsku
description / dadescription / da
 
Projekt Q111686 i Polen
description / nldescription / nl
 
Project Q111686 in Polen
description / etdescription / et
 
Projekt Q111686 Poolas
description / fidescription / fi
 
Projekti Q111686 Puolassa
description / frdescription / fr
 
Projet Q111686 en Pologne
description / dedescription / de
 
Projekt Q111686 in Polen
description / eldescription / el
 
Έργο Q111686 στην Πολωνία
description / gadescription / ga
 
Tionscadal Q111686 sa Pholainn
description / itdescription / it
 
Progetto Q111686 in Polonia
description / lvdescription / lv
 
Projekts Q111686 Polijā
description / ltdescription / lt
 
Projektas Q111686 Lenkijoje
description / mtdescription / mt
 
Proġett Q111686 fil-Polonja
description / ptdescription / pt
 
Projeto Q111686 na Polônia
description / rodescription / ro
 
Proiectul Q111686 în Polonia
description / skdescription / sk
 
Projekt Q111686 v Poľsku
description / sldescription / sl
 
Projekt Q111686 na Poljskem
description / esdescription / es
 
Proyecto Q111686 en Polonia
description / svdescription / sv
 
Projekt Q111686 i Polen
Property / EU contribution
11,049,673.96 zloty
Amount11,049,673.96 zloty
Unitzloty
 
Property / EU contribution: 11,049,673.96 zloty / rank
Normal rank
 
Property / EU contribution
2,651,921.7504000003 Euro
Amount2,651,921.7504000003 Euro
UnitEuro
 
Property / EU contribution: 2,651,921.7504000003 Euro / rank
Preferred rank
 
Property / EU contribution: 2,651,921.7504000003 Euro / qualifier
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
 
Property / EU contribution: 2,651,921.7504000003 Euro / qualifier
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
18,088,841.53 zloty
Amount18,088,841.53 zloty
Unitzloty
 
Property / budget: 18,088,841.53 zloty / rank
Normal rank
 
Property / budget
4,341,321.9672 Euro
Amount4,341,321.9672 Euro
UnitEuro
 
Property / budget: 4,341,321.9672 Euro / rank
Preferred rank
 
Property / budget: 4,341,321.9672 Euro / qualifier
exchange rate to Euro: 0.24 Euro
Amount0.24 Euro
UnitEuro
 
Property / budget: 4,341,321.9672 Euro / qualifier
point in time: 13 January 2020
Timestamp+2020-01-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / co-financing rate
74.34 percent
Amount74.34 percent
Unitpercent
 
Property / co-financing rate: 74.34 percent / rank
Normal rank
 
Property / end time
31 December 2020
Timestamp+2020-12-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 31 December 2020 / rank
Normal rank
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Wadowice / rank
 
Normal rank
Property / contained in Local Administrative Unit: Wadowice / qualifier
 
Property / summary
 
The project envisages the expansion of the existing Economic Activity Zone in Andrychów. The project includes areas separated for the expansion of the Economic Activity Zone in Andrychów, covering the area located between the streets: Złoowa, Biała Droga, Przemysłowa and a drainage ditch between ul. The object of the design is the preparation of the investment area enabling the implementation of industrial and service facilities together with access to the network of technical and communication infrastructure of the city, including: macro-nilisation of the area in order to obtain declines enabling the construction of large-surface hallways to rebuild part of the existing service route of the area of maintenance of the area of the zone with the adaptation of the parameters to the needs of transporting the internal access road enabling access to separate investment plots to the development of the infrastructure of the infrastructure of the land. Area of prepared investment areas: 11.633 ha (English)
Property / summary: The project envisages the expansion of the existing Economic Activity Zone in Andrychów. The project includes areas separated for the expansion of the Economic Activity Zone in Andrychów, covering the area located between the streets: Złoowa, Biała Droga, Przemysłowa and a drainage ditch between ul. The object of the design is the preparation of the investment area enabling the implementation of industrial and service facilities together with access to the network of technical and communication infrastructure of the city, including: macro-nilisation of the area in order to obtain declines enabling the construction of large-surface hallways to rebuild part of the existing service route of the area of maintenance of the area of the zone with the adaptation of the parameters to the needs of transporting the internal access road enabling access to separate investment plots to the development of the infrastructure of the infrastructure of the land. Area of prepared investment areas: 11.633 ha (English) / rank
 
Normal rank
Property / summary: The project envisages the expansion of the existing Economic Activity Zone in Andrychów. The project includes areas separated for the expansion of the Economic Activity Zone in Andrychów, covering the area located between the streets: Złoowa, Biała Droga, Przemysłowa and a drainage ditch between ul. The object of the design is the preparation of the investment area enabling the implementation of industrial and service facilities together with access to the network of technical and communication infrastructure of the city, including: macro-nilisation of the area in order to obtain declines enabling the construction of large-surface hallways to rebuild part of the existing service route of the area of maintenance of the area of the zone with the adaptation of the parameters to the needs of transporting the internal access road enabling access to separate investment plots to the development of the infrastructure of the infrastructure of the land. Area of prepared investment areas: 11.633 ha (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary: The project envisages the expansion of the existing Economic Activity Zone in Andrychów. The project includes areas separated for the expansion of the Economic Activity Zone in Andrychów, covering the area located between the streets: Złoowa, Biała Droga, Przemysłowa and a drainage ditch between ul. The object of the design is the preparation of the investment area enabling the implementation of industrial and service facilities together with access to the network of technical and communication infrastructure of the city, including: macro-nilisation of the area in order to obtain declines enabling the construction of large-surface hallways to rebuild part of the existing service route of the area of maintenance of the area of the zone with the adaptation of the parameters to the needs of transporting the internal access road enabling access to separate investment plots to the development of the infrastructure of the infrastructure of the land. Area of prepared investment areas: 11.633 ha (English) / qualifier
 
readability score: 0.682651565977266
Amount0.682651565977266
Unit1
Property / summary
 
Le projet comprend l’expansion de la zone d’activité économique existante à Andrychów. Le projet couvre les zones réservées à l’extension de la zone d’activité économique à Andrychów, couvrant la zone située entre les rues: Zonal, White Road, fossé industriel et de drainage entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domaine des domaines d’investissement préparés: 11 633 ha (French)
Property / summary: Le projet comprend l’expansion de la zone d’activité économique existante à Andrychów. Le projet couvre les zones réservées à l’extension de la zone d’activité économique à Andrychów, couvrant la zone située entre les rues: Zonal, White Road, fossé industriel et de drainage entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domaine des domaines d’investissement préparés: 11 633 ha (French) / rank
 
Normal rank
Property / summary: Le projet comprend l’expansion de la zone d’activité économique existante à Andrychów. Le projet couvre les zones réservées à l’extension de la zone d’activité économique à Andrychów, couvrant la zone située entre les rues: Zonal, White Road, fossé industriel et de drainage entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domaine des domaines d’investissement préparés: 11 633 ha (French) / qualifier
 
point in time: 1 December 2021
Timestamp+2021-12-01T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Das Projekt beinhaltet die Erweiterung der bestehenden Wirtschaftszone in Andrychów. Das Projekt deckt die Bereiche ab, die für die Erweiterung der Wirtschaftszone in Andrychów vorgesehen sind und sich auf das zwischen den Straßen gelegene Gebiet erstrecken: Zoneal, White Road, Industrial und Drainage Graben zwischen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Bereich der vorbereiteten Investitionsbereiche: 11,633 ha (German)
Property / summary: Das Projekt beinhaltet die Erweiterung der bestehenden Wirtschaftszone in Andrychów. Das Projekt deckt die Bereiche ab, die für die Erweiterung der Wirtschaftszone in Andrychów vorgesehen sind und sich auf das zwischen den Straßen gelegene Gebiet erstrecken: Zoneal, White Road, Industrial und Drainage Graben zwischen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Bereich der vorbereiteten Investitionsbereiche: 11,633 ha (German) / rank
 
Normal rank
Property / summary: Das Projekt beinhaltet die Erweiterung der bestehenden Wirtschaftszone in Andrychów. Das Projekt deckt die Bereiche ab, die für die Erweiterung der Wirtschaftszone in Andrychów vorgesehen sind und sich auf das zwischen den Straßen gelegene Gebiet erstrecken: Zoneal, White Road, Industrial und Drainage Graben zwischen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Bereich der vorbereiteten Investitionsbereiche: 11,633 ha (German) / qualifier
 
point in time: 7 December 2021
Timestamp+2021-12-07T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Het project omvat de uitbreiding van de bestaande economische activiteitenzone in Andrychów. Het project heeft betrekking op de gebieden die zijn gereserveerd voor de uitbreiding van de economische activiteitszone in Andrychów, die het gebied tussen de straten bestrijken: Zonal, White Road, Industrial en drainage sloot tussen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Gebied van voorbereide investeringsgebieden: 11,633 ha (Dutch)
Property / summary: Het project omvat de uitbreiding van de bestaande economische activiteitenzone in Andrychów. Het project heeft betrekking op de gebieden die zijn gereserveerd voor de uitbreiding van de economische activiteitszone in Andrychów, die het gebied tussen de straten bestrijken: Zonal, White Road, Industrial en drainage sloot tussen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Gebied van voorbereide investeringsgebieden: 11,633 ha (Dutch) / rank
 
Normal rank
Property / summary: Het project omvat de uitbreiding van de bestaande economische activiteitenzone in Andrychów. Het project heeft betrekking op de gebieden die zijn gereserveerd voor de uitbreiding van de economische activiteitszone in Andrychów, die het gebied tussen de straten bestrijken: Zonal, White Road, Industrial en drainage sloot tussen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Gebied van voorbereide investeringsgebieden: 11,633 ha (Dutch) / qualifier
 
point in time: 17 December 2021
Timestamp+2021-12-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Il progetto prevede l'ampliamento della zona di attività economica esistente ad Andrychów. Il progetto copre le aree destinate all'ampliamento della zona di attività economica di Andrychów, coprendo l'area situata tra le strade: Zonale, strada bianca, industriale e fossato di drenaggio tra ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Area dei settori di investimento preparati: 11,633 ha (Italian)
Property / summary: Il progetto prevede l'ampliamento della zona di attività economica esistente ad Andrychów. Il progetto copre le aree destinate all'ampliamento della zona di attività economica di Andrychów, coprendo l'area situata tra le strade: Zonale, strada bianca, industriale e fossato di drenaggio tra ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Area dei settori di investimento preparati: 11,633 ha (Italian) / rank
 
Normal rank
Property / summary: Il progetto prevede l'ampliamento della zona di attività economica esistente ad Andrychów. Il progetto copre le aree destinate all'ampliamento della zona di attività economica di Andrychów, coprendo l'area situata tra le strade: Zonale, strada bianca, industriale e fossato di drenaggio tra ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Area dei settori di investimento preparati: 11,633 ha (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
El proyecto implica la ampliación de la Zona de Actividad Económica existente en Andrychów. El proyecto abarca las áreas reservadas para la ampliación de la Zona de Actividad Económica en Andrychów, cubriendo la zona situada entre las calles: Zonal, White Road, Industrial y zanja de drenaje entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Área de áreas de inversión preparadas: 11,633 ha (Spanish)
Property / summary: El proyecto implica la ampliación de la Zona de Actividad Económica existente en Andrychów. El proyecto abarca las áreas reservadas para la ampliación de la Zona de Actividad Económica en Andrychów, cubriendo la zona situada entre las calles: Zonal, White Road, Industrial y zanja de drenaje entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Área de áreas de inversión preparadas: 11,633 ha (Spanish) / rank
 
Normal rank
Property / summary: El proyecto implica la ampliación de la Zona de Actividad Económica existente en Andrychów. El proyecto abarca las áreas reservadas para la ampliación de la Zona de Actividad Económica en Andrychów, cubriendo la zona situada entre las calles: Zonal, White Road, Industrial y zanja de drenaje entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Área de áreas de inversión preparadas: 11,633 ha (Spanish) / qualifier
 
point in time: 18 January 2022
Timestamp+2022-01-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projektet indebærer udvidelse af den eksisterende økonomiske aktivitetszone i Andrychów. Projektet dækker de områder, der er afsat til udvidelse af den økonomiske aktivitetszone i Andrychów, der dækker området mellem gaderne: Zoneal, White Road, Industrial og dræning grøft mellem ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område med forberedte investeringsområder: 11,633 ha (Danish)
Property / summary: Projektet indebærer udvidelse af den eksisterende økonomiske aktivitetszone i Andrychów. Projektet dækker de områder, der er afsat til udvidelse af den økonomiske aktivitetszone i Andrychów, der dækker området mellem gaderne: Zoneal, White Road, Industrial og dræning grøft mellem ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område med forberedte investeringsområder: 11,633 ha (Danish) / rank
 
Normal rank
Property / summary: Projektet indebærer udvidelse af den eksisterende økonomiske aktivitetszone i Andrychów. Projektet dækker de områder, der er afsat til udvidelse af den økonomiske aktivitetszone i Andrychów, der dækker området mellem gaderne: Zoneal, White Road, Industrial og dræning grøft mellem ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område med forberedte investeringsområder: 11,633 ha (Danish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Το έργο περιλαμβάνει την επέκταση της υφιστάμενης Ζώνης Οικονομικής Δραστηριότητας στο Andrychów. Το έργο καλύπτει τις περιοχές που προορίζονται για την επέκταση της ζώνης οικονομικής δραστηριότητας στο Andrychów, καλύπτοντας την περιοχή που βρίσκεται μεταξύ των οδών: Ζώνη, Λευκός Δρόμος, Βιομηχανική και αποστράγγιση τάφρος μεταξύ ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Τομέας των καταρτισμένων επενδυτικών τομέων: 11.633 εκτάρια (Greek)
Property / summary: Το έργο περιλαμβάνει την επέκταση της υφιστάμενης Ζώνης Οικονομικής Δραστηριότητας στο Andrychów. Το έργο καλύπτει τις περιοχές που προορίζονται για την επέκταση της ζώνης οικονομικής δραστηριότητας στο Andrychów, καλύπτοντας την περιοχή που βρίσκεται μεταξύ των οδών: Ζώνη, Λευκός Δρόμος, Βιομηχανική και αποστράγγιση τάφρος μεταξύ ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Τομέας των καταρτισμένων επενδυτικών τομέων: 11.633 εκτάρια (Greek) / rank
 
Normal rank
Property / summary: Το έργο περιλαμβάνει την επέκταση της υφιστάμενης Ζώνης Οικονομικής Δραστηριότητας στο Andrychów. Το έργο καλύπτει τις περιοχές που προορίζονται για την επέκταση της ζώνης οικονομικής δραστηριότητας στο Andrychów, καλύπτοντας την περιοχή που βρίσκεται μεταξύ των οδών: Ζώνη, Λευκός Δρόμος, Βιομηχανική και αποστράγγιση τάφρος μεταξύ ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Τομέας των καταρτισμένων επενδυτικών τομέων: 11.633 εκτάρια (Greek) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt uključuje proširenje postojeće zone gospodarske aktivnosti u Andrychówu. Projektom su obuhvaćena područja predviđena za proširenje zone gospodarske aktivnosti u Andrychówu, koja obuhvaća područje između ulica: Zonal, Bijela cesta, Industrijski i drenažni jarak između ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Područje pripremljenih područja ulaganja: 11,633 ha (Croatian)
Property / summary: Projekt uključuje proširenje postojeće zone gospodarske aktivnosti u Andrychówu. Projektom su obuhvaćena područja predviđena za proširenje zone gospodarske aktivnosti u Andrychówu, koja obuhvaća područje između ulica: Zonal, Bijela cesta, Industrijski i drenažni jarak između ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Područje pripremljenih područja ulaganja: 11,633 ha (Croatian) / rank
 
Normal rank
Property / summary: Projekt uključuje proširenje postojeće zone gospodarske aktivnosti u Andrychówu. Projektom su obuhvaćena područja predviđena za proširenje zone gospodarske aktivnosti u Andrychówu, koja obuhvaća područje između ulica: Zonal, Bijela cesta, Industrijski i drenažni jarak između ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Područje pripremljenih područja ulaganja: 11,633 ha (Croatian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Proiectul implică extinderea zonei de activitate economică existentă în Andrychów. Proiectul acoperă zonele rezervate extinderii zonei de activitate economică din Andrychów, acoperind zona situată între străzi: Zonal, Drumul Alb, Șanț industrial și drenaj între ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domeniul domeniilor de investiții pregătite: 11,633 ha (Romanian)
Property / summary: Proiectul implică extinderea zonei de activitate economică existentă în Andrychów. Proiectul acoperă zonele rezervate extinderii zonei de activitate economică din Andrychów, acoperind zona situată între străzi: Zonal, Drumul Alb, Șanț industrial și drenaj între ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domeniul domeniilor de investiții pregătite: 11,633 ha (Romanian) / rank
 
Normal rank
Property / summary: Proiectul implică extinderea zonei de activitate economică existentă în Andrychów. Proiectul acoperă zonele rezervate extinderii zonei de activitate economică din Andrychów, acoperind zona situată între străzi: Zonal, Drumul Alb, Șanț industrial și drenaj între ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domeniul domeniilor de investiții pregătite: 11,633 ha (Romanian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt zahŕňa rozšírenie existujúcej zóny ekonomickej aktivity v Andrychówe. Projekt pokrýva oblasti vyčlenené na rozšírenie zóny hospodárskej činnosti v Andrychówe, ktoré pokrývajú oblasť nachádzajúcu sa medzi ulicami: Zóna, Biela cesta, Priemyselné a drenážne priekopy medzi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblasť pripravených investičných oblastí: 11,633 ha (Slovak)
Property / summary: Projekt zahŕňa rozšírenie existujúcej zóny ekonomickej aktivity v Andrychówe. Projekt pokrýva oblasti vyčlenené na rozšírenie zóny hospodárskej činnosti v Andrychówe, ktoré pokrývajú oblasť nachádzajúcu sa medzi ulicami: Zóna, Biela cesta, Priemyselné a drenážne priekopy medzi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblasť pripravených investičných oblastí: 11,633 ha (Slovak) / rank
 
Normal rank
Property / summary: Projekt zahŕňa rozšírenie existujúcej zóny ekonomickej aktivity v Andrychówe. Projekt pokrýva oblasti vyčlenené na rozšírenie zóny hospodárskej činnosti v Andrychówe, ktoré pokrývajú oblasť nachádzajúcu sa medzi ulicami: Zóna, Biela cesta, Priemyselné a drenážne priekopy medzi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblasť pripravených investičných oblastí: 11,633 ha (Slovak) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Il-proġett jinvolvi l-espansjoni taż-Żona ta’ Attività Ekonomika eżistenti f’Andrychów. Il-proġett ikopri ż-żoni mwarrba għall-estensjoni taż-Żona ta’ Attività Ekonomika f’Andrychów, li tkopri ż-żona li tinsab bejn it-toroq: Foss żonali, White Road, Industrijali u tad-drenaġġ bejn ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Qasam ta’ oqsma ta’ investiment ippreparati: 11.633 ettaru (Maltese)
Property / summary: Il-proġett jinvolvi l-espansjoni taż-Żona ta’ Attività Ekonomika eżistenti f’Andrychów. Il-proġett ikopri ż-żoni mwarrba għall-estensjoni taż-Żona ta’ Attività Ekonomika f’Andrychów, li tkopri ż-żona li tinsab bejn it-toroq: Foss żonali, White Road, Industrijali u tad-drenaġġ bejn ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Qasam ta’ oqsma ta’ investiment ippreparati: 11.633 ettaru (Maltese) / rank
 
Normal rank
Property / summary: Il-proġett jinvolvi l-espansjoni taż-Żona ta’ Attività Ekonomika eżistenti f’Andrychów. Il-proġett ikopri ż-żoni mwarrba għall-estensjoni taż-Żona ta’ Attività Ekonomika f’Andrychów, li tkopri ż-żona li tinsab bejn it-toroq: Foss żonali, White Road, Industrijali u tad-drenaġġ bejn ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Qasam ta’ oqsma ta’ investiment ippreparati: 11.633 ettaru (Maltese) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
O projeto prevê a expansão da zona de atividade económica existente em Andrychów. O projeto inclui áreas separadas para a expansão da Zona de Atividade Económica em Andrychów, abrangendo a área localizada entre as ruas: Złoowa, Biała Droga, Przemysłowa e uma vala de drenagem entre ul. O objetivo do projeto é a preparação da área de investimento que permite a implementação de instalações industriais e de serviços, juntamente com o acesso à rede de infraestruturas técnicas e de comunicação da cidade, incluindo: macronilização da área a fim de obter declínios que permitam a construção de corredores de grande superfície para reconstruir parte da rota de serviço existente da área de manutenção da área da zona com a adaptação dos parâmetros às necessidades de transporte da estrada de acesso interno que permite o acesso a parcelas de investimento separadas para o desenvolvimento da infraestrutura da infraestrutura do terreno. Área de áreas de investimento preparadas: 11 633 ha (Portuguese)
Property / summary: O projeto prevê a expansão da zona de atividade económica existente em Andrychów. O projeto inclui áreas separadas para a expansão da Zona de Atividade Económica em Andrychów, abrangendo a área localizada entre as ruas: Złoowa, Biała Droga, Przemysłowa e uma vala de drenagem entre ul. O objetivo do projeto é a preparação da área de investimento que permite a implementação de instalações industriais e de serviços, juntamente com o acesso à rede de infraestruturas técnicas e de comunicação da cidade, incluindo: macronilização da área a fim de obter declínios que permitam a construção de corredores de grande superfície para reconstruir parte da rota de serviço existente da área de manutenção da área da zona com a adaptação dos parâmetros às necessidades de transporte da estrada de acesso interno que permite o acesso a parcelas de investimento separadas para o desenvolvimento da infraestrutura da infraestrutura do terreno. Área de áreas de investimento preparadas: 11 633 ha (Portuguese) / rank
 
Normal rank
Property / summary: O projeto prevê a expansão da zona de atividade económica existente em Andrychów. O projeto inclui áreas separadas para a expansão da Zona de Atividade Económica em Andrychów, abrangendo a área localizada entre as ruas: Złoowa, Biała Droga, Przemysłowa e uma vala de drenagem entre ul. O objetivo do projeto é a preparação da área de investimento que permite a implementação de instalações industriais e de serviços, juntamente com o acesso à rede de infraestruturas técnicas e de comunicação da cidade, incluindo: macronilização da área a fim de obter declínios que permitam a construção de corredores de grande superfície para reconstruir parte da rota de serviço existente da área de manutenção da área da zona com a adaptação dos parâmetros às necessidades de transporte da estrada de acesso interno que permite o acesso a parcelas de investimento separadas para o desenvolvimento da infraestrutura da infraestrutura do terreno. Área de áreas de investimento preparadas: 11 633 ha (Portuguese) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Hankkeeseen sisältyy Andrychówin nykyisen taloudellisen toiminnan vyöhykkeen laajentaminen. Hanke kattaa Andrychówin taloudellisen toiminnan vyöhykkeen laajentamiseen varatut alueet, jotka kattavat kadun välissä olevan alueen: Alue, valkoinen tie, teollinen ja viemäröinti ojan välillä ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Valmisteltujen investointialueiden ala: 11,633 ha (Finnish)
Property / summary: Hankkeeseen sisältyy Andrychówin nykyisen taloudellisen toiminnan vyöhykkeen laajentaminen. Hanke kattaa Andrychówin taloudellisen toiminnan vyöhykkeen laajentamiseen varatut alueet, jotka kattavat kadun välissä olevan alueen: Alue, valkoinen tie, teollinen ja viemäröinti ojan välillä ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Valmisteltujen investointialueiden ala: 11,633 ha (Finnish) / rank
 
Normal rank
Property / summary: Hankkeeseen sisältyy Andrychówin nykyisen taloudellisen toiminnan vyöhykkeen laajentaminen. Hanke kattaa Andrychówin taloudellisen toiminnan vyöhykkeen laajentamiseen varatut alueet, jotka kattavat kadun välissä olevan alueen: Alue, valkoinen tie, teollinen ja viemäröinti ojan välillä ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Valmisteltujen investointialueiden ala: 11,633 ha (Finnish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt vključuje razširitev obstoječega območja gospodarske dejavnosti v Andrychówu. Projekt zajema območja, namenjena razširitvi območja gospodarske dejavnosti v Andrychówu, ki zajema območje med ulicami: Območje, bela cesta, industrijska in drenažna jarek med ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Področje pripravljenih naložbenih področij: 11,633 ha (Slovenian)
Property / summary: Projekt vključuje razširitev obstoječega območja gospodarske dejavnosti v Andrychówu. Projekt zajema območja, namenjena razširitvi območja gospodarske dejavnosti v Andrychówu, ki zajema območje med ulicami: Območje, bela cesta, industrijska in drenažna jarek med ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Področje pripravljenih naložbenih področij: 11,633 ha (Slovenian) / rank
 
Normal rank
Property / summary: Projekt vključuje razširitev obstoječega območja gospodarske dejavnosti v Andrychówu. Projekt zajema območja, namenjena razširitvi območja gospodarske dejavnosti v Andrychówu, ki zajema območje med ulicami: Območje, bela cesta, industrijska in drenažna jarek med ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Področje pripravljenih naložbenih področij: 11,633 ha (Slovenian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt zahrnuje rozšíření stávající zóny ekonomické aktivity v Andrychówě. Projekt se týká oblastí vyhrazených pro rozšíření zóny hospodářské činnosti v Andrychówě, která pokrývá oblast nacházející se mezi ulicemi: Zonal, White Road, Průmyslový a odvodňovací příkop mezi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblast připravených investičních oblastí: 11,633 ha (Czech)
Property / summary: Projekt zahrnuje rozšíření stávající zóny ekonomické aktivity v Andrychówě. Projekt se týká oblastí vyhrazených pro rozšíření zóny hospodářské činnosti v Andrychówě, která pokrývá oblast nacházející se mezi ulicemi: Zonal, White Road, Průmyslový a odvodňovací příkop mezi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblast připravených investičních oblastí: 11,633 ha (Czech) / rank
 
Normal rank
Property / summary: Projekt zahrnuje rozšíření stávající zóny ekonomické aktivity v Andrychówě. Projekt se týká oblastí vyhrazených pro rozšíření zóny hospodářské činnosti v Andrychówě, která pokrývá oblast nacházející se mezi ulicemi: Zonal, White Road, Průmyslový a odvodňovací příkop mezi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblast připravených investičních oblastí: 11,633 ha (Czech) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projektas apima esamos ekonominės veiklos zonos Andrychów plėtrą. Projektas apima teritorijas, skirtas ekonominės veiklos zonai Andrychów išplėsti, apimančias teritoriją, esančią tarp gatvių: Zonal, White Road, Pramonės ir drenažo griovys tarp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Paruoštų investicijų sričių plotas: 11 633 ha (Lithuanian)
Property / summary: Projektas apima esamos ekonominės veiklos zonos Andrychów plėtrą. Projektas apima teritorijas, skirtas ekonominės veiklos zonai Andrychów išplėsti, apimančias teritoriją, esančią tarp gatvių: Zonal, White Road, Pramonės ir drenažo griovys tarp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Paruoštų investicijų sričių plotas: 11 633 ha (Lithuanian) / rank
 
Normal rank
Property / summary: Projektas apima esamos ekonominės veiklos zonos Andrychów plėtrą. Projektas apima teritorijas, skirtas ekonominės veiklos zonai Andrychów išplėsti, apimančias teritoriją, esančią tarp gatvių: Zonal, White Road, Pramonės ir drenažo griovys tarp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Paruoštų investicijų sričių plotas: 11 633 ha (Lithuanian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekts ietver esošās ekonomiskās darbības zonas paplašināšanu Andrišovā. Projekts aptver teritorijas, kas paredzētas ekonomiskās darbības zonas paplašināšanai Andrišovā, aptverot teritoriju, kas atrodas starp ielām: Zonal, White Road, Rūpniecības un drenāžas grāvis starp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Sagatavoto investīciju apgabalu platība: 11,633 ha (Latvian)
Property / summary: Projekts ietver esošās ekonomiskās darbības zonas paplašināšanu Andrišovā. Projekts aptver teritorijas, kas paredzētas ekonomiskās darbības zonas paplašināšanai Andrišovā, aptverot teritoriju, kas atrodas starp ielām: Zonal, White Road, Rūpniecības un drenāžas grāvis starp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Sagatavoto investīciju apgabalu platība: 11,633 ha (Latvian) / rank
 
Normal rank
Property / summary: Projekts ietver esošās ekonomiskās darbības zonas paplašināšanu Andrišovā. Projekts aptver teritorijas, kas paredzētas ekonomiskās darbības zonas paplašināšanai Andrišovā, aptverot teritoriju, kas atrodas starp ielām: Zonal, White Road, Rūpniecības un drenāžas grāvis starp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Sagatavoto investīciju apgabalu platība: 11,633 ha (Latvian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Проектът включва разширяване на съществуващата зона за икономическа дейност в Andrychów. Проектът обхваща площите, определени за разширяване на зоната за икономическа дейност в Andrychów, обхващаща площта, разположена между улиците: Зонал, Уайт път, Индустриална и дренажна канавка между ул. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Област на подготвените инвестиционни области: 11.633 ха (Bulgarian)
Property / summary: Проектът включва разширяване на съществуващата зона за икономическа дейност в Andrychów. Проектът обхваща площите, определени за разширяване на зоната за икономическа дейност в Andrychów, обхващаща площта, разположена между улиците: Зонал, Уайт път, Индустриална и дренажна канавка между ул. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Област на подготвените инвестиционни области: 11.633 ха (Bulgarian) / rank
 
Normal rank
Property / summary: Проектът включва разширяване на съществуващата зона за икономическа дейност в Andrychów. Проектът обхваща площите, определени за разширяване на зоната за икономическа дейност в Andrychów, обхващаща площта, разположена между улиците: Зонал, Уайт път, Индустриална и дренажна канавка между ул. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Област на подготвените инвестиционни области: 11.633 ха (Bulgarian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A projekt az andrychówi gazdasági övezet bővítését foglalja magában. A projekt az andrychówi gazdasági tevékenységi övezet bővítésére kijelölt területekre terjed ki, amelyek az utcák közötti területet fedik le: Zonal, fehér út, ipari és vízelvezető árok között ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Az előkészített beruházási területek területe: 11,633 ha (Hungarian)
Property / summary: A projekt az andrychówi gazdasági övezet bővítését foglalja magában. A projekt az andrychówi gazdasági tevékenységi övezet bővítésére kijelölt területekre terjed ki, amelyek az utcák közötti területet fedik le: Zonal, fehér út, ipari és vízelvezető árok között ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Az előkészített beruházási területek területe: 11,633 ha (Hungarian) / rank
 
Normal rank
Property / summary: A projekt az andrychówi gazdasági övezet bővítését foglalja magában. A projekt az andrychówi gazdasági tevékenységi övezet bővítésére kijelölt területekre terjed ki, amelyek az utcák közötti területet fedik le: Zonal, fehér út, ipari és vízelvezető árok között ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Az előkészített beruházási területek területe: 11,633 ha (Hungarian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Is éard atá i gceist leis an tionscadal leathnú a dhéanamh ar an gCrios Gníomhaíochta Eacnamaíochta atá ann cheana in Andrychów. Clúdaíonn an tionscadal na limistéir atá curtha ar leataobh le haghaidh leathnú an Chrios Gníomhaíochta Eacnamaíochta in Andrychów, a chlúdaíonn an limistéar atá suite idir na sráideanna: Crios, Bóthar Bán, Tionscail agus díog draenála idir ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Réimse na limistéar infheistíochta ullmhaithe: 11.633 ha (Irish)
Property / summary: Is éard atá i gceist leis an tionscadal leathnú a dhéanamh ar an gCrios Gníomhaíochta Eacnamaíochta atá ann cheana in Andrychów. Clúdaíonn an tionscadal na limistéir atá curtha ar leataobh le haghaidh leathnú an Chrios Gníomhaíochta Eacnamaíochta in Andrychów, a chlúdaíonn an limistéar atá suite idir na sráideanna: Crios, Bóthar Bán, Tionscail agus díog draenála idir ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Réimse na limistéar infheistíochta ullmhaithe: 11.633 ha (Irish) / rank
 
Normal rank
Property / summary: Is éard atá i gceist leis an tionscadal leathnú a dhéanamh ar an gCrios Gníomhaíochta Eacnamaíochta atá ann cheana in Andrychów. Clúdaíonn an tionscadal na limistéir atá curtha ar leataobh le haghaidh leathnú an Chrios Gníomhaíochta Eacnamaíochta in Andrychów, a chlúdaíonn an limistéar atá suite idir na sráideanna: Crios, Bóthar Bán, Tionscail agus díog draenála idir ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Réimse na limistéar infheistíochta ullmhaithe: 11.633 ha (Irish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projektet omfattar utbyggnad av den befintliga ekonomiska aktivitetszonen i Andrychów. Projektet omfattar de områden som avsatts för utvidgning av den ekonomiska aktivitetszonen i Andrychów, som omfattar det område som ligger mellan gatorna: Zonal, vit väg, industri och dränering dike mellan ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område för beredda investeringsområden: 11 633 ha (Swedish)
Property / summary: Projektet omfattar utbyggnad av den befintliga ekonomiska aktivitetszonen i Andrychów. Projektet omfattar de områden som avsatts för utvidgning av den ekonomiska aktivitetszonen i Andrychów, som omfattar det område som ligger mellan gatorna: Zonal, vit väg, industri och dränering dike mellan ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område för beredda investeringsområden: 11 633 ha (Swedish) / rank
 
Normal rank
Property / summary: Projektet omfattar utbyggnad av den befintliga ekonomiska aktivitetszonen i Andrychów. Projektet omfattar de områden som avsatts för utvidgning av den ekonomiska aktivitetszonen i Andrychów, som omfattar det område som ligger mellan gatorna: Zonal, vit väg, industri och dränering dike mellan ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område för beredda investeringsområden: 11 633 ha (Swedish) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt hõlmab Andrychówi olemasoleva majandustegevuse tsooni laiendamist. Projekt hõlmab Andrychówi majandustegevuse laiendamiseks ette nähtud alasid, mis hõlmavad tänavate vahel asuvat ala: Tsoon, valge tee, tööstus- ja kuivenduskraav ul’i vahel. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Ettevalmistatud investeerimisvaldkondade valdkond: 11,633 ha (Estonian)
Property / summary: Projekt hõlmab Andrychówi olemasoleva majandustegevuse tsooni laiendamist. Projekt hõlmab Andrychówi majandustegevuse laiendamiseks ette nähtud alasid, mis hõlmavad tänavate vahel asuvat ala: Tsoon, valge tee, tööstus- ja kuivenduskraav ul’i vahel. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Ettevalmistatud investeerimisvaldkondade valdkond: 11,633 ha (Estonian) / rank
 
Normal rank
Property / summary: Projekt hõlmab Andrychówi olemasoleva majandustegevuse tsooni laiendamist. Projekt hõlmab Andrychówi majandustegevuse laiendamiseks ette nähtud alasid, mis hõlmavad tänavate vahel asuvat ala: Tsoon, valge tee, tööstus- ja kuivenduskraav ul’i vahel. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Ettevalmistatud investeerimisvaldkondade valdkond: 11,633 ha (Estonian) / qualifier
 
point in time: 2 July 2022
Timestamp+2022-07-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / financed by
 
Property / financed by: European Union / rank
 
Normal rank
Property / programme
 
Property / programme: Ma?opolskie Voivodeship - ERDF/ESF / rank
 
Normal rank
Property / fund
 
Property / fund: European Regional Development Fund / rank
 
Normal rank
Property / beneficiary
 
Property / beneficiary: Gmina Andrychów / rank
 
Normal rank
Property / location (string)
 
WOJ.: MAŁOPOLSKIE, POW.: wadowicki
Property / location (string): WOJ.: MAŁOPOLSKIE, POW.: wadowicki / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: Enterprising Malopolska / rank
 
Normal rank
Property / coordinate location
 
49°53'29.72"N, 19°29'44.99"E
Latitude49.8915948
Longitude19.495825239948
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 49°53'29.72"N, 19°29'44.99"E / rank
 
Normal rank
Property / coordinate location: 49°53'29.72"N, 19°29'44.99"E / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Oświęcimski / rank
 
Normal rank
Property / contained in NUTS: Oświęcimski / qualifier
 
Property / thematic objective
 
Property / thematic objective: Competitiveness of SMEs / rank
 
Normal rank
Property / end time
 
31 December 2022
Timestamp+2022-12-31T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / end time: 31 December 2022 / rank
 
Normal rank
Property / budget
 
12,650,096.0 zloty
Amount12,650,096.0 zloty
Unitzloty
Property / budget: 12,650,096.0 zloty / rank
 
Normal rank
Property / budget
 
3,036,023.0 Euro
Amount3,036,023.0 Euro
UnitEuro
Property / budget: 3,036,023.0 Euro / rank
 
Preferred rank
Property / EU contribution
 
9,404,082.0 zloty
Amount9,404,082.0 zloty
Unitzloty
Property / EU contribution: 9,404,082.0 zloty / rank
 
Normal rank
Property / EU contribution
 
2,256,979.8 Euro
Amount2,256,979.8 Euro
UnitEuro
Property / EU contribution: 2,256,979.8 Euro / rank
 
Preferred rank
Property / co-financing rate
 
74.34 percent
Amount74.34 percent
Unitpercent
Property / co-financing rate: 74.34 percent / rank
 
Normal rank
Property / date of last update
 
13 December 2023
Timestamp+2023-12-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 13 December 2023 / rank
 
Normal rank

Latest revision as of 18:14, 8 October 2024

Project Q111686 in Poland
Language Label Description Also known as
English
Expansion of the zone of economic activity in Andrychów by arming new investment areas and expansion and reconstruction of road infrastructure in the zone
Project Q111686 in Poland

    Statements

    0 references
    9,404,082.0 zloty
    0 references
    2,256,979.8 Euro
    0 references
    12,650,096.0 zloty
    0 references
    3,036,023.0 Euro
    0 references
    74.34 percent
    0 references
    1 March 2017
    0 references
    31 December 2022
    0 references
    GMINA ANDRYCHÓW
    0 references

    49°53'29.72"N, 19°29'44.99"E
    0 references
    Projekt zakłada rozbudowę istniejącej Strefy Aktywności Gospodarczej w Andrychowie. Projektem objęte są tereny wydzielone pod rozbudowę Strefy Aktywności Gospodarczej w Andrychowie, obejmujące obszar położony pomiędzy ulicami: Strefową, Biała Droga, Przemysłową oraz rowem odwadniającym pomiędzy ul. Przemysłową i Strefową.Przedmiotem zamierzenia jest przygotowanie terenu inwestycyjnego umożliwiających realizację obiektów przemysłowych i usługowych wraz z dostępem do sieci infrastruktury technicznej i komunikacyjnej miasta, obejmujące:makroniwelację terenu w celu uzyskania spadków umożliwiających budowę wielkopowierzchniowych obiektów halowychprzebudowę części istniejącej drogi obsługowej ulica Strefowa z dostosowaniem parametrów do potrzeb transportu ciężkiego budowę wewnętrznej drogi dojazdowej umożliwiającej dojazd do wydzielonych działek inwestycyjnychrozbudowę sieci uzbrojenia terenu w sposób zapewniający dostęp do infrastruktury technicznej miasta:sieci wodociągowej kanalizacji sanitarnej i deszczowejsieci gazu ziemnegosieci elektroenergetycznej SN i NNbudowę podstacji transformatorowejsieci kanalizacji teleinformatycznejsieci oświetlenia zewnętrznegozabezpieczenie lub przebudowę odcinków sieci istniejących, kolidujących z planowanym zagospodarowaniem i uzbrojeniem terenu, w szczególności przebudowę ze zmianą trasy istniejącej, napowietrznej przesyłowej linii elektroenergetycznej WNuporządkowanie terenu po robotach budowlanych rekultywacja terenu po robotach ziemnych z przywróceniem warstwy humusuzagospodarowanie terenów przewidzianych na cele zieleni izolacyjnej. Powierzchnia przygotowanych terenów inwestycyjnych: 11,633 ha (Polish)
    0 references
    The project envisages the expansion of the existing Economic Activity Zone in Andrychów. The project includes areas separated for the expansion of the Economic Activity Zone in Andrychów, covering the area located between the streets: Złoowa, Biała Droga, Przemysłowa and a drainage ditch between ul. The object of the design is the preparation of the investment area enabling the implementation of industrial and service facilities together with access to the network of technical and communication infrastructure of the city, including: macro-nilisation of the area in order to obtain declines enabling the construction of large-surface hallways to rebuild part of the existing service route of the area of maintenance of the area of the zone with the adaptation of the parameters to the needs of transporting the internal access road enabling access to separate investment plots to the development of the infrastructure of the infrastructure of the land. Area of prepared investment areas: 11.633 ha (English)
    20 October 2020
    0.682651565977266
    0 references
    Le projet comprend l’expansion de la zone d’activité économique existante à Andrychów. Le projet couvre les zones réservées à l’extension de la zone d’activité économique à Andrychów, couvrant la zone située entre les rues: Zonal, White Road, fossé industriel et de drainage entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domaine des domaines d’investissement préparés: 11 633 ha (French)
    1 December 2021
    0 references
    Das Projekt beinhaltet die Erweiterung der bestehenden Wirtschaftszone in Andrychów. Das Projekt deckt die Bereiche ab, die für die Erweiterung der Wirtschaftszone in Andrychów vorgesehen sind und sich auf das zwischen den Straßen gelegene Gebiet erstrecken: Zoneal, White Road, Industrial und Drainage Graben zwischen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Bereich der vorbereiteten Investitionsbereiche: 11,633 ha (German)
    7 December 2021
    0 references
    Het project omvat de uitbreiding van de bestaande economische activiteitenzone in Andrychów. Het project heeft betrekking op de gebieden die zijn gereserveerd voor de uitbreiding van de economische activiteitszone in Andrychów, die het gebied tussen de straten bestrijken: Zonal, White Road, Industrial en drainage sloot tussen ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Gebied van voorbereide investeringsgebieden: 11,633 ha (Dutch)
    17 December 2021
    0 references
    Il progetto prevede l'ampliamento della zona di attività economica esistente ad Andrychów. Il progetto copre le aree destinate all'ampliamento della zona di attività economica di Andrychów, coprendo l'area situata tra le strade: Zonale, strada bianca, industriale e fossato di drenaggio tra ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Area dei settori di investimento preparati: 11,633 ha (Italian)
    15 January 2022
    0 references
    El proyecto implica la ampliación de la Zona de Actividad Económica existente en Andrychów. El proyecto abarca las áreas reservadas para la ampliación de la Zona de Actividad Económica en Andrychów, cubriendo la zona situada entre las calles: Zonal, White Road, Industrial y zanja de drenaje entre ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Área de áreas de inversión preparadas: 11,633 ha (Spanish)
    18 January 2022
    0 references
    Projektet indebærer udvidelse af den eksisterende økonomiske aktivitetszone i Andrychów. Projektet dækker de områder, der er afsat til udvidelse af den økonomiske aktivitetszone i Andrychów, der dækker området mellem gaderne: Zoneal, White Road, Industrial og dræning grøft mellem ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område med forberedte investeringsområder: 11,633 ha (Danish)
    2 July 2022
    0 references
    Το έργο περιλαμβάνει την επέκταση της υφιστάμενης Ζώνης Οικονομικής Δραστηριότητας στο Andrychów. Το έργο καλύπτει τις περιοχές που προορίζονται για την επέκταση της ζώνης οικονομικής δραστηριότητας στο Andrychów, καλύπτοντας την περιοχή που βρίσκεται μεταξύ των οδών: Ζώνη, Λευκός Δρόμος, Βιομηχανική και αποστράγγιση τάφρος μεταξύ ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Τομέας των καταρτισμένων επενδυτικών τομέων: 11.633 εκτάρια (Greek)
    2 July 2022
    0 references
    Projekt uključuje proširenje postojeće zone gospodarske aktivnosti u Andrychówu. Projektom su obuhvaćena područja predviđena za proširenje zone gospodarske aktivnosti u Andrychówu, koja obuhvaća područje između ulica: Zonal, Bijela cesta, Industrijski i drenažni jarak između ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Područje pripremljenih područja ulaganja: 11,633 ha (Croatian)
    2 July 2022
    0 references
    Proiectul implică extinderea zonei de activitate economică existentă în Andrychów. Proiectul acoperă zonele rezervate extinderii zonei de activitate economică din Andrychów, acoperind zona situată între străzi: Zonal, Drumul Alb, Șanț industrial și drenaj între ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Domeniul domeniilor de investiții pregătite: 11,633 ha (Romanian)
    2 July 2022
    0 references
    Projekt zahŕňa rozšírenie existujúcej zóny ekonomickej aktivity v Andrychówe. Projekt pokrýva oblasti vyčlenené na rozšírenie zóny hospodárskej činnosti v Andrychówe, ktoré pokrývajú oblasť nachádzajúcu sa medzi ulicami: Zóna, Biela cesta, Priemyselné a drenážne priekopy medzi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblasť pripravených investičných oblastí: 11,633 ha (Slovak)
    2 July 2022
    0 references
    Il-proġett jinvolvi l-espansjoni taż-Żona ta’ Attività Ekonomika eżistenti f’Andrychów. Il-proġett ikopri ż-żoni mwarrba għall-estensjoni taż-Żona ta’ Attività Ekonomika f’Andrychów, li tkopri ż-żona li tinsab bejn it-toroq: Foss żonali, White Road, Industrijali u tad-drenaġġ bejn ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Qasam ta’ oqsma ta’ investiment ippreparati: 11.633 ettaru (Maltese)
    2 July 2022
    0 references
    O projeto prevê a expansão da zona de atividade económica existente em Andrychów. O projeto inclui áreas separadas para a expansão da Zona de Atividade Económica em Andrychów, abrangendo a área localizada entre as ruas: Złoowa, Biała Droga, Przemysłowa e uma vala de drenagem entre ul. O objetivo do projeto é a preparação da área de investimento que permite a implementação de instalações industriais e de serviços, juntamente com o acesso à rede de infraestruturas técnicas e de comunicação da cidade, incluindo: macronilização da área a fim de obter declínios que permitam a construção de corredores de grande superfície para reconstruir parte da rota de serviço existente da área de manutenção da área da zona com a adaptação dos parâmetros às necessidades de transporte da estrada de acesso interno que permite o acesso a parcelas de investimento separadas para o desenvolvimento da infraestrutura da infraestrutura do terreno. Área de áreas de investimento preparadas: 11 633 ha (Portuguese)
    2 July 2022
    0 references
    Hankkeeseen sisältyy Andrychówin nykyisen taloudellisen toiminnan vyöhykkeen laajentaminen. Hanke kattaa Andrychówin taloudellisen toiminnan vyöhykkeen laajentamiseen varatut alueet, jotka kattavat kadun välissä olevan alueen: Alue, valkoinen tie, teollinen ja viemäröinti ojan välillä ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Valmisteltujen investointialueiden ala: 11,633 ha (Finnish)
    2 July 2022
    0 references
    Projekt vključuje razširitev obstoječega območja gospodarske dejavnosti v Andrychówu. Projekt zajema območja, namenjena razširitvi območja gospodarske dejavnosti v Andrychówu, ki zajema območje med ulicami: Območje, bela cesta, industrijska in drenažna jarek med ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Področje pripravljenih naložbenih področij: 11,633 ha (Slovenian)
    2 July 2022
    0 references
    Projekt zahrnuje rozšíření stávající zóny ekonomické aktivity v Andrychówě. Projekt se týká oblastí vyhrazených pro rozšíření zóny hospodářské činnosti v Andrychówě, která pokrývá oblast nacházející se mezi ulicemi: Zonal, White Road, Průmyslový a odvodňovací příkop mezi ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Oblast připravených investičních oblastí: 11,633 ha (Czech)
    2 July 2022
    0 references
    Projektas apima esamos ekonominės veiklos zonos Andrychów plėtrą. Projektas apima teritorijas, skirtas ekonominės veiklos zonai Andrychów išplėsti, apimančias teritoriją, esančią tarp gatvių: Zonal, White Road, Pramonės ir drenažo griovys tarp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Paruoštų investicijų sričių plotas: 11 633 ha (Lithuanian)
    2 July 2022
    0 references
    Projekts ietver esošās ekonomiskās darbības zonas paplašināšanu Andrišovā. Projekts aptver teritorijas, kas paredzētas ekonomiskās darbības zonas paplašināšanai Andrišovā, aptverot teritoriju, kas atrodas starp ielām: Zonal, White Road, Rūpniecības un drenāžas grāvis starp ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Sagatavoto investīciju apgabalu platība: 11,633 ha (Latvian)
    2 July 2022
    0 references
    Проектът включва разширяване на съществуващата зона за икономическа дейност в Andrychów. Проектът обхваща площите, определени за разширяване на зоната за икономическа дейност в Andrychów, обхващаща площта, разположена между улиците: Зонал, Уайт път, Индустриална и дренажна канавка между ул. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Област на подготвените инвестиционни области: 11.633 ха (Bulgarian)
    2 July 2022
    0 references
    A projekt az andrychówi gazdasági övezet bővítését foglalja magában. A projekt az andrychówi gazdasági tevékenységi övezet bővítésére kijelölt területekre terjed ki, amelyek az utcák közötti területet fedik le: Zonal, fehér út, ipari és vízelvezető árok között ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Az előkészített beruházási területek területe: 11,633 ha (Hungarian)
    2 July 2022
    0 references
    Is éard atá i gceist leis an tionscadal leathnú a dhéanamh ar an gCrios Gníomhaíochta Eacnamaíochta atá ann cheana in Andrychów. Clúdaíonn an tionscadal na limistéir atá curtha ar leataobh le haghaidh leathnú an Chrios Gníomhaíochta Eacnamaíochta in Andrychów, a chlúdaíonn an limistéar atá suite idir na sráideanna: Crios, Bóthar Bán, Tionscail agus díog draenála idir ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Réimse na limistéar infheistíochta ullmhaithe: 11.633 ha (Irish)
    2 July 2022
    0 references
    Projektet omfattar utbyggnad av den befintliga ekonomiska aktivitetszonen i Andrychów. Projektet omfattar de områden som avsatts för utvidgning av den ekonomiska aktivitetszonen i Andrychów, som omfattar det område som ligger mellan gatorna: Zonal, vit väg, industri och dränering dike mellan ul. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Område för beredda investeringsområden: 11 633 ha (Swedish)
    2 July 2022
    0 references
    Projekt hõlmab Andrychówi olemasoleva majandustegevuse tsooni laiendamist. Projekt hõlmab Andrychówi majandustegevuse laiendamiseks ette nähtud alasid, mis hõlmavad tänavate vahel asuvat ala: Tsoon, valge tee, tööstus- ja kuivenduskraav ul’i vahel. The purpose of the project is to prepare an investment area enabling the implementation of industrial and service facilities with access to the network of technical and communication infrastructure of the city, obejmujące:makroniwelację the area in order to obtain drops enabling the construction of large-area hall facilities to reconstruct part of the existing maintenance road Strefowa street with adaptation of parameters to the needs of heavy transport, construction of an internal access road enabling access to the separate investment plots, the extension of the network of the site’s armament in a way that provides access to the technical infrastructure: the water supply infrastructure, in particular the environmental protection of the building site, the restoration of the natural gas network of the natural gas network, and the reconstruction of the area from the outskills of the external illumination network, the protection of the existing infrastructure, in particular the rehabilitation of the construction of the building of the natural gas network, the rehabilitation of the area from the outskills of the area from the outskilling of the network, the protection of the existing infrastructure from the area’s mainland, the rehabilitation of the natural gas network, the modernisation of the area from the outskids of the area, the rehabilitation of the area from the outskirts of the area, the rehabilitation of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the outskirts of the area, the protection of the area from the rehabilitation of the infrastructure, the protection of the area from the outskirtment of the network, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area from the rehabilitation of the area, the protection of the area’s mainland, the mainland of the area, the protection of the area from the modernisation of the network of the area, the protection of the existing infrastructure from the construction of the mainland, in particular the protection of the area in the area, the restoration of the natural gas network, the modernisation of the network from the external network of the network, the protection of the area from the mainland of the area, the restoration of the mainland of the area, and the rehabilitation of the mainland from the outskills of the mainland of the area, Ettevalmistatud investeerimisvaldkondade valdkond: 11,633 ha (Estonian)
    2 July 2022
    0 references
    WOJ.: MAŁOPOLSKIE, POW.: wadowicki
    0 references
    13 December 2023
    0 references

    Identifiers

    RPMP.03.01.02-12-0582/16