(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH (Q2065880): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(12 intermediate revisions by 2 users not shown) | |||||||||||||||
label / fr | label / fr | ||||||||||||||
(A19_075_2015_0750008_1010) CREMALOMBARDI 100 KWH | |||||||||||||||
label / nl | label / nl | ||||||||||||||
(A19_075_2015_0750008_1010) CREMALOMBARDI 100 KWH | |||||||||||||||
label / de | label / de | ||||||||||||||
(A19_075_2015_0750008_1010) CREMALOMBARDI 100 KWH | |||||||||||||||
label / es | label / es | ||||||||||||||
(A19_075_2015_0750008_1010) CREMALOMBARDI 100 KWH | |||||||||||||||
label / da | label / da | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / el | label / el | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / hr | label / hr | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / ro | label / ro | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / sk | label / sk | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / mt | label / mt | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / pt | label / pt | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMBARDI 100 KWH | |||||||||||||||
label / fi | label / fi | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / pl | label / pl | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / sl | label / sl | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / cs | label / cs | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / lt | label / lt | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / lv | label / lv | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / bg | label / bg | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / hu | label / hu | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / ga | label / ga | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
label / sv | label / sv | ||||||||||||||
(A19_075_2015_0750008_1010) KREOMALOMBARDI 100 KWH | |||||||||||||||
label / et | label / et | ||||||||||||||
(A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH | |||||||||||||||
description / bg | description / bg | ||||||||||||||
Проект Q2065880 в Италия | |||||||||||||||
description / hr | description / hr | ||||||||||||||
Projekt Q2065880 u Italiji | |||||||||||||||
description / hu | description / hu | ||||||||||||||
Projekt Q2065880 Olaszországban | |||||||||||||||
description / cs | description / cs | ||||||||||||||
Projekt Q2065880 v Itálii | |||||||||||||||
description / da | description / da | ||||||||||||||
Projekt Q2065880 i Italien | |||||||||||||||
description / nl | description / nl | ||||||||||||||
Project Q2065880 in Italië | |||||||||||||||
description / et | description / et | ||||||||||||||
Projekt Q2065880 Itaalias | |||||||||||||||
description / fi | description / fi | ||||||||||||||
Projekti Q2065880 Italiassa | |||||||||||||||
description / fr | description / fr | ||||||||||||||
Projet Q2065880 en Italie | |||||||||||||||
description / de | description / de | ||||||||||||||
Projekt Q2065880 in Italien | |||||||||||||||
description / el | description / el | ||||||||||||||
Έργο Q2065880 στην Ιταλία | |||||||||||||||
description / ga | description / ga | ||||||||||||||
Tionscadal Q2065880 san Iodáil | |||||||||||||||
description / lv | description / lv | ||||||||||||||
Projekts Q2065880 Itālijā | |||||||||||||||
description / lt | description / lt | ||||||||||||||
Projektas Q2065880 Italijoje | |||||||||||||||
description / mt | description / mt | ||||||||||||||
Proġett Q2065880 fl-Italja | |||||||||||||||
description / pl | description / pl | ||||||||||||||
Projekt Q2065880 we Włoszech | |||||||||||||||
description / pt | description / pt | ||||||||||||||
Projeto Q2065880 na Itália | |||||||||||||||
description / ro | description / ro | ||||||||||||||
Proiectul Q2065880 în Italia | |||||||||||||||
description / sk | description / sk | ||||||||||||||
Projekt Q2065880 v Taliansku | |||||||||||||||
description / sl | description / sl | ||||||||||||||
Projekt Q2065880 v Italiji | |||||||||||||||
description / es | description / es | ||||||||||||||
Proyecto Q2065880 en Italia | |||||||||||||||
description / sv | description / sv | ||||||||||||||
Projekt Q2065880 i Italien | |||||||||||||||
Property / start time | |||||||||||||||
| |||||||||||||||
Property / start time: 25 February 2015 / rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI / rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: Q293057 / rank | |||||||||||||||
Property / summary: INSTALLATION OF 100 KWP PHOTOVOLTAIC POWER PLANT ON MIXED-USE BUILDINGS INSTALLED IN VECCIANO VIA COMMON VACCINE 4. (English) / qualifier | |||||||||||||||
readability score: 0.3049543874332875
| |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Firenze / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary | |||||||||||||||
INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 100 KWP SUR LES TOITS DE BÂTIMENTS À USAGE PROMIS, PLACÉS À VECCHIANO VIA DEL PECCACCINO 4. (French) | |||||||||||||||
Property / summary: INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 100 KWP SUR LES TOITS DE BÂTIMENTS À USAGE PROMIS, PLACÉS À VECCHIANO VIA DEL PECCACCINO 4. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 100 KWP SUR LES TOITS DE BÂTIMENTS À USAGE PROMIS, PLACÉS À VECCHIANO VIA DEL PECCACCINO 4. (French) / qualifier | |||||||||||||||
point in time: 16 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALLATIE VAN 100 KWP VERMOGEN FOTOVOLTAÏSCHE SYSTEEM OP DE DAKEN VAN GEBOUWEN VOOR PROMISCUUS GEBRUIK GEPLAATST IN VECCHIANO VIA DEL PECCACCINO 4. (Dutch) | |||||||||||||||
Property / summary: INSTALLATIE VAN 100 KWP VERMOGEN FOTOVOLTAÏSCHE SYSTEEM OP DE DAKEN VAN GEBOUWEN VOOR PROMISCUUS GEBRUIK GEPLAATST IN VECCHIANO VIA DEL PECCACCINO 4. (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALLATIE VAN 100 KWP VERMOGEN FOTOVOLTAÏSCHE SYSTEEM OP DE DAKEN VAN GEBOUWEN VOOR PROMISCUUS GEBRUIK GEPLAATST IN VECCHIANO VIA DEL PECCACCINO 4. (Dutch) / qualifier | |||||||||||||||
point in time: 23 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALLATION VON 100 KWP PHOTOVOLTAIKANLAGE AUF DEN DÄCHERN VON GEBÄUDEN FÜR DEN PROMISCUOUS EINSATZ IN VECCHIANO VIA DEL PECCACCINO 4. (German) | |||||||||||||||
Property / summary: INSTALLATION VON 100 KWP PHOTOVOLTAIKANLAGE AUF DEN DÄCHERN VON GEBÄUDEN FÜR DEN PROMISCUOUS EINSATZ IN VECCHIANO VIA DEL PECCACCINO 4. (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALLATION VON 100 KWP PHOTOVOLTAIKANLAGE AUF DEN DÄCHERN VON GEBÄUDEN FÜR DEN PROMISCUOUS EINSATZ IN VECCHIANO VIA DEL PECCACCINO 4. (German) / qualifier | |||||||||||||||
point in time: 24 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALACIÓN DE UN SISTEMA FOTOVOLTAICO DE POTENCIA DE 100 KWP EN LOS TECHOS DE EDIFICIOS PARA USO PROMISCUO COLOCADOS EN VECCHIANO VÍA DEL PECCACCINO 4. (Spanish) | |||||||||||||||
Property / summary: INSTALACIÓN DE UN SISTEMA FOTOVOLTAICO DE POTENCIA DE 100 KWP EN LOS TECHOS DE EDIFICIOS PARA USO PROMISCUO COLOCADOS EN VECCHIANO VÍA DEL PECCACCINO 4. (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALACIÓN DE UN SISTEMA FOTOVOLTAICO DE POTENCIA DE 100 KWP EN LOS TECHOS DE EDIFICIOS PARA USO PROMISCUO COLOCADOS EN VECCHIANO VÍA DEL PECCACCINO 4. (Spanish) / qualifier | |||||||||||||||
point in time: 25 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALLATION AF 100 KWP FOTOVOLTAISK KRAFTVÆRK PÅ BYGNINGER MED BLANDET ANVENDELSE INSTALLERET I VECCIANO VIA FÆLLES VACCINE 4. (Danish) | |||||||||||||||
Property / summary: INSTALLATION AF 100 KWP FOTOVOLTAISK KRAFTVÆRK PÅ BYGNINGER MED BLANDET ANVENDELSE INSTALLERET I VECCIANO VIA FÆLLES VACCINE 4. (Danish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALLATION AF 100 KWP FOTOVOLTAISK KRAFTVÆRK PÅ BYGNINGER MED BLANDET ANVENDELSE INSTALLERET I VECCIANO VIA FÆLLES VACCINE 4. (Danish) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
ΕΓΚΑΤΆΣΤΑΣΗ ΦΩΤΟΒΟΛΤΑΪΚΟΎ ΣΤΑΘΜΟΎ ΙΣΧΎΟΣ 100 KWP ΣΕ ΚΤΊΡΙΑ ΜΙΚΤΉΣ ΧΡΉΣΗΣ ΠΟΥ ΕΓΚΑΘΊΣΤΑΝΤΑΙ ΣΤΟ VECCIANO ΜΈΣΩ ΚΟΙΝΟΎ ΕΜΒΟΛΊΟΥ 4. (Greek) | |||||||||||||||
Property / summary: ΕΓΚΑΤΆΣΤΑΣΗ ΦΩΤΟΒΟΛΤΑΪΚΟΎ ΣΤΑΘΜΟΎ ΙΣΧΎΟΣ 100 KWP ΣΕ ΚΤΊΡΙΑ ΜΙΚΤΉΣ ΧΡΉΣΗΣ ΠΟΥ ΕΓΚΑΘΊΣΤΑΝΤΑΙ ΣΤΟ VECCIANO ΜΈΣΩ ΚΟΙΝΟΎ ΕΜΒΟΛΊΟΥ 4. (Greek) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: ΕΓΚΑΤΆΣΤΑΣΗ ΦΩΤΟΒΟΛΤΑΪΚΟΎ ΣΤΑΘΜΟΎ ΙΣΧΎΟΣ 100 KWP ΣΕ ΚΤΊΡΙΑ ΜΙΚΤΉΣ ΧΡΉΣΗΣ ΠΟΥ ΕΓΚΑΘΊΣΤΑΝΤΑΙ ΣΤΟ VECCIANO ΜΈΣΩ ΚΟΙΝΟΎ ΕΜΒΟΛΊΟΥ 4. (Greek) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
UGRADNJA FOTONAPONSKE ELEKTRANE 100 KWP NA ZGRADE MJEŠOVITE NAMJENE INSTALIRANE U VECCIANU PUTEM ZAJEDNIČKOG CJEPIVA 4. (Croatian) | |||||||||||||||
Property / summary: UGRADNJA FOTONAPONSKE ELEKTRANE 100 KWP NA ZGRADE MJEŠOVITE NAMJENE INSTALIRANE U VECCIANU PUTEM ZAJEDNIČKOG CJEPIVA 4. (Croatian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: UGRADNJA FOTONAPONSKE ELEKTRANE 100 KWP NA ZGRADE MJEŠOVITE NAMJENE INSTALIRANE U VECCIANU PUTEM ZAJEDNIČKOG CJEPIVA 4. (Croatian) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALAREA UNEI CENTRALE FOTOVOLTAICE DE 100 KWP PE CLĂDIRI CU UTILIZARE MIXTĂ INSTALATE ÎN VECCIANO PRIN INTERMEDIUL VACCINULUI COMUN 4. (Romanian) | |||||||||||||||
Property / summary: INSTALAREA UNEI CENTRALE FOTOVOLTAICE DE 100 KWP PE CLĂDIRI CU UTILIZARE MIXTĂ INSTALATE ÎN VECCIANO PRIN INTERMEDIUL VACCINULUI COMUN 4. (Romanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALAREA UNEI CENTRALE FOTOVOLTAICE DE 100 KWP PE CLĂDIRI CU UTILIZARE MIXTĂ INSTALATE ÎN VECCIANO PRIN INTERMEDIUL VACCINULUI COMUN 4. (Romanian) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
INŠTALÁCIA FOTOVOLTAICKEJ ELEKTRÁRNE S VÝKONOM 100 KWP NA ZMIEŠANÉ BUDOVY INŠTALOVANÉ VO VECCIANE PROSTREDNÍCTVOM SPOLOČNEJ VAKCÍNY 4. (Slovak) | |||||||||||||||
Property / summary: INŠTALÁCIA FOTOVOLTAICKEJ ELEKTRÁRNE S VÝKONOM 100 KWP NA ZMIEŠANÉ BUDOVY INŠTALOVANÉ VO VECCIANE PROSTREDNÍCTVOM SPOLOČNEJ VAKCÍNY 4. (Slovak) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INŠTALÁCIA FOTOVOLTAICKEJ ELEKTRÁRNE S VÝKONOM 100 KWP NA ZMIEŠANÉ BUDOVY INŠTALOVANÉ VO VECCIANE PROSTREDNÍCTVOM SPOLOČNEJ VAKCÍNY 4. (Slovak) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALLAZZJONI TA’ IMPJANT TAL-ENERĠIJA FOTOVOLTAJKA TA’ 100 KWP F’BINI B’UŻU MĦALLAT INSTALLAT F’VECCIANO PERMEZZ TAL-VAĊĊIN KOMUNI 4. (Maltese) | |||||||||||||||
Property / summary: INSTALLAZZJONI TA’ IMPJANT TAL-ENERĠIJA FOTOVOLTAJKA TA’ 100 KWP F’BINI B’UŻU MĦALLAT INSTALLAT F’VECCIANO PERMEZZ TAL-VAĊĊIN KOMUNI 4. (Maltese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALLAZZJONI TA’ IMPJANT TAL-ENERĠIJA FOTOVOLTAJKA TA’ 100 KWP F’BINI B’UŻU MĦALLAT INSTALLAT F’VECCIANO PERMEZZ TAL-VAĊĊIN KOMUNI 4. (Maltese) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALAÇÃO DE UTILIZADORES FOTOVOLTAICOS DE 100 KWP EM EDIFÍCIOS DE USO MISTO INSTALADOS EM VECCIANO ATRAVÉS DA VACINA COMUM 4. (Portuguese) | |||||||||||||||
Property / summary: INSTALAÇÃO DE UTILIZADORES FOTOVOLTAICOS DE 100 KWP EM EDIFÍCIOS DE USO MISTO INSTALADOS EM VECCIANO ATRAVÉS DA VACINA COMUM 4. (Portuguese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALAÇÃO DE UTILIZADORES FOTOVOLTAICOS DE 100 KWP EM EDIFÍCIOS DE USO MISTO INSTALADOS EM VECCIANO ATRAVÉS DA VACINA COMUM 4. (Portuguese) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
100 KWP:N AURINKOSÄHKÖVOIMALAN ASENTAMINEN SEKAKÄYTÖSSÄ OLEVIIN RAKENNUKSIIN, JOTKA ON ASENNETTU VECCIANOON YHTEISEN ROKOTTEEN AVULLA 4. (Finnish) | |||||||||||||||
Property / summary: 100 KWP:N AURINKOSÄHKÖVOIMALAN ASENTAMINEN SEKAKÄYTÖSSÄ OLEVIIN RAKENNUKSIIN, JOTKA ON ASENNETTU VECCIANOON YHTEISEN ROKOTTEEN AVULLA 4. (Finnish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: 100 KWP:N AURINKOSÄHKÖVOIMALAN ASENTAMINEN SEKAKÄYTÖSSÄ OLEVIIN RAKENNUKSIIN, JOTKA ON ASENNETTU VECCIANOON YHTEISEN ROKOTTEEN AVULLA 4. (Finnish) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALACJA ELEKTROWNI FOTOWOLTAICZNEJ O MOCY 100 KWP W BUDYNKACH O MIESZANYM UŻYTKOWANIU ZAINSTALOWANYCH W VECCIANO ZA POMOCĄ WSPÓLNEJ SZCZEPIONKI 4. (Polish) | |||||||||||||||
Property / summary: INSTALACJA ELEKTROWNI FOTOWOLTAICZNEJ O MOCY 100 KWP W BUDYNKACH O MIESZANYM UŻYTKOWANIU ZAINSTALOWANYCH W VECCIANO ZA POMOCĄ WSPÓLNEJ SZCZEPIONKI 4. (Polish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALACJA ELEKTROWNI FOTOWOLTAICZNEJ O MOCY 100 KWP W BUDYNKACH O MIESZANYM UŻYTKOWANIU ZAINSTALOWANYCH W VECCIANO ZA POMOCĄ WSPÓLNEJ SZCZEPIONKI 4. (Polish) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
NAMESTITEV 100 KWP FOTONAPETOSTNE ELEKTRARNE NA STAVBE ZA MEŠANO UPORABO, NAMEŠČENE V VECCIANU S SKUPNIM CEPIVOM 4. (Slovenian) | |||||||||||||||
Property / summary: NAMESTITEV 100 KWP FOTONAPETOSTNE ELEKTRARNE NA STAVBE ZA MEŠANO UPORABO, NAMEŠČENE V VECCIANU S SKUPNIM CEPIVOM 4. (Slovenian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: NAMESTITEV 100 KWP FOTONAPETOSTNE ELEKTRARNE NA STAVBE ZA MEŠANO UPORABO, NAMEŠČENE V VECCIANU S SKUPNIM CEPIVOM 4. (Slovenian) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALACE FOTOVOLTAICKÉ ELEKTRÁRNY O VÝKONU 100 KWP VE SMÍŠENÝCH BUDOVÁCH INSTALOVANÝCH VE VECCIANO PROSTŘEDNICTVÍM BĚŽNÉ VAKCÍNY 4. (Czech) | |||||||||||||||
Property / summary: INSTALACE FOTOVOLTAICKÉ ELEKTRÁRNY O VÝKONU 100 KWP VE SMÍŠENÝCH BUDOVÁCH INSTALOVANÝCH VE VECCIANO PROSTŘEDNICTVÍM BĚŽNÉ VAKCÍNY 4. (Czech) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALACE FOTOVOLTAICKÉ ELEKTRÁRNY O VÝKONU 100 KWP VE SMÍŠENÝCH BUDOVÁCH INSTALOVANÝCH VE VECCIANO PROSTŘEDNICTVÍM BĚŽNÉ VAKCÍNY 4. (Czech) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
100 KWP FOTOVOLTINĖS ELEKTRINĖS ĮRENGIMAS MIŠRIOS PASKIRTIES PASTATUOSE, ĮRENGTUOSE VECCIANO NAUDOJANT BENDRĄ VAKCINĄ 4. (Lithuanian) | |||||||||||||||
Property / summary: 100 KWP FOTOVOLTINĖS ELEKTRINĖS ĮRENGIMAS MIŠRIOS PASKIRTIES PASTATUOSE, ĮRENGTUOSE VECCIANO NAUDOJANT BENDRĄ VAKCINĄ 4. (Lithuanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: 100 KWP FOTOVOLTINĖS ELEKTRINĖS ĮRENGIMAS MIŠRIOS PASKIRTIES PASTATUOSE, ĮRENGTUOSE VECCIANO NAUDOJANT BENDRĄ VAKCINĄ 4. (Lithuanian) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
100 KWP FOTOELEMENTU SPĒKSTACIJAS UZSTĀDĪŠANA JAUKTA TIPA ĒKĀS, KAS UZSTĀDĪTAS VECCIANO, IZMANTOJOT PARASTO VAKCĪNU 4. (Latvian) | |||||||||||||||
Property / summary: 100 KWP FOTOELEMENTU SPĒKSTACIJAS UZSTĀDĪŠANA JAUKTA TIPA ĒKĀS, KAS UZSTĀDĪTAS VECCIANO, IZMANTOJOT PARASTO VAKCĪNU 4. (Latvian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: 100 KWP FOTOELEMENTU SPĒKSTACIJAS UZSTĀDĪŠANA JAUKTA TIPA ĒKĀS, KAS UZSTĀDĪTAS VECCIANO, IZMANTOJOT PARASTO VAKCĪNU 4. (Latvian) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
ИНСТАЛИРАНЕ НА ФОТОВОЛТАИЧНА ЦЕНТРАЛА 100 KWP ВЪРХУ СГРАДИ СЪС СМЕСЕНО ПРЕДНАЗНАЧЕНИЕ, ИНСТАЛИРАНИ ВЪВ VECCIANO ЧРЕЗ ОБЩА ВАКСИНА 4. (Bulgarian) | |||||||||||||||
Property / summary: ИНСТАЛИРАНЕ НА ФОТОВОЛТАИЧНА ЦЕНТРАЛА 100 KWP ВЪРХУ СГРАДИ СЪС СМЕСЕНО ПРЕДНАЗНАЧЕНИЕ, ИНСТАЛИРАНИ ВЪВ VECCIANO ЧРЕЗ ОБЩА ВАКСИНА 4. (Bulgarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: ИНСТАЛИРАНЕ НА ФОТОВОЛТАИЧНА ЦЕНТРАЛА 100 KWP ВЪРХУ СГРАДИ СЪС СМЕСЕНО ПРЕДНАЗНАЧЕНИЕ, ИНСТАЛИРАНИ ВЪВ VECCIANO ЧРЕЗ ОБЩА ВАКСИНА 4. (Bulgarian) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
100 KWP FOTOVOLTAIKUS ERŐMŰ TELEPÍTÉSE VEGYES HASZNÁLATÚ ÉPÜLETEKBE VECCIANO TERÜLETÉN, KÖZÖS 4. OLTÓANYAGON KERESZTÜL. (Hungarian) | |||||||||||||||
Property / summary: 100 KWP FOTOVOLTAIKUS ERŐMŰ TELEPÍTÉSE VEGYES HASZNÁLATÚ ÉPÜLETEKBE VECCIANO TERÜLETÉN, KÖZÖS 4. OLTÓANYAGON KERESZTÜL. (Hungarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: 100 KWP FOTOVOLTAIKUS ERŐMŰ TELEPÍTÉSE VEGYES HASZNÁLATÚ ÉPÜLETEKBE VECCIANO TERÜLETÉN, KÖZÖS 4. OLTÓANYAGON KERESZTÜL. (Hungarian) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
GLÉASRA CUMHACHTA FÓTAVOLTACH 100 KWP A SHUITEÁIL AR FHOIRGNIMH INA BHFUIL ÚSÁID MHEASCTHA SUITEÁILTE I VECCIANO TRÍ VACSAÍN CHOITEANN 4. (Irish) | |||||||||||||||
Property / summary: GLÉASRA CUMHACHTA FÓTAVOLTACH 100 KWP A SHUITEÁIL AR FHOIRGNIMH INA BHFUIL ÚSÁID MHEASCTHA SUITEÁILTE I VECCIANO TRÍ VACSAÍN CHOITEANN 4. (Irish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: GLÉASRA CUMHACHTA FÓTAVOLTACH 100 KWP A SHUITEÁIL AR FHOIRGNIMH INA BHFUIL ÚSÁID MHEASCTHA SUITEÁILTE I VECCIANO TRÍ VACSAÍN CHOITEANN 4. (Irish) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
INSTALLATION AV 100 KWP SOLCELLSKRAFTVERK PÅ BYGGNADER FÖR BLANDAD ANVÄNDNING SOM INSTALLERATS I VECCIANO VIA VANLIGT VACCIN 4. (Swedish) | |||||||||||||||
Property / summary: INSTALLATION AV 100 KWP SOLCELLSKRAFTVERK PÅ BYGGNADER FÖR BLANDAD ANVÄNDNING SOM INSTALLERATS I VECCIANO VIA VANLIGT VACCIN 4. (Swedish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: INSTALLATION AV 100 KWP SOLCELLSKRAFTVERK PÅ BYGGNADER FÖR BLANDAD ANVÄNDNING SOM INSTALLERATS I VECCIANO VIA VANLIGT VACCIN 4. (Swedish) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
100 KWP FOTOGALVAANILISE ELEKTRIJAAMA PAIGALDAMINE MITMEOTSTARBELISTELE HOONETELE, MIS ON PAIGALDATUD VECCIANOSSE ÜHISE VAKTSIINIGA 4. (Estonian) | |||||||||||||||
Property / summary: 100 KWP FOTOGALVAANILISE ELEKTRIJAAMA PAIGALDAMINE MITMEOTSTARBELISTELE HOONETELE, MIS ON PAIGALDATUD VECCIANOSSE ÜHISE VAKTSIINIGA 4. (Estonian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: 100 KWP FOTOGALVAANILISE ELEKTRIJAAMA PAIGALDAMINE MITMEOTSTARBELISTELE HOONETELE, MIS ON PAIGALDATUD VECCIANOSSE ÜHISE VAKTSIINIGA 4. (Estonian) / qualifier | |||||||||||||||
point in time: 5 July 2022
| |||||||||||||||
Property / location (string) | |||||||||||||||
VECCHIANO | |||||||||||||||
Property / location (string): VECCHIANO / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary | |||||||||||||||
Property / beneficiary: CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI | |||||||||||||||
Property / beneficiary name (string): CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: SUPPORTING THE TRANSITION TO A LOW-CARBON ECONOMY IN ALL SECTORS / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Low-carbon economy / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / start time | |||||||||||||||
30 June 2015
| |||||||||||||||
Property / start time: 30 June 2015 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
8 April 2023
| |||||||||||||||
Property / date of last update: 8 April 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / Call for proposal | |||||||||||||||
Property / Call for proposal: 075 - Bando Energia 2 / rank | |||||||||||||||
Normal rank |
Latest revision as of 19:08, 9 October 2024
Project Q2065880 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_075_2015_0750008_1010) CREOMALOMBARDI 100 KWH |
Project Q2065880 in Italy |
Statements
29,198.0 Euro
0 references
58,396.0 Euro
0 references
50.0 percent
0 references
30 June 2015
0 references
18 October 2017
0 references
25 February 2017
0 references
CREMA LOMBARDI SNC DI FRANCESCO E LORENZO LOMBARDI
0 references
INSTALLAZIONE IMPIANTO FOTOVOLTAICO DI POTENZA 100 KWP SULLE COPERTURE DI FABBRICATI AD USO PROMISCUO POSTI IN VECCHIANO VIA DEL BECCACCINO 4. (Italian)
0 references
INSTALLATION OF 100 KWP PHOTOVOLTAIC POWER PLANT ON MIXED-USE BUILDINGS INSTALLED IN VECCIANO VIA COMMON VACCINE 4. (English)
0.3049543874332875
0 references
INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 100 KWP SUR LES TOITS DE BÂTIMENTS À USAGE PROMIS, PLACÉS À VECCHIANO VIA DEL PECCACCINO 4. (French)
16 December 2021
0 references
INSTALLATIE VAN 100 KWP VERMOGEN FOTOVOLTAÏSCHE SYSTEEM OP DE DAKEN VAN GEBOUWEN VOOR PROMISCUUS GEBRUIK GEPLAATST IN VECCHIANO VIA DEL PECCACCINO 4. (Dutch)
23 December 2021
0 references
INSTALLATION VON 100 KWP PHOTOVOLTAIKANLAGE AUF DEN DÄCHERN VON GEBÄUDEN FÜR DEN PROMISCUOUS EINSATZ IN VECCHIANO VIA DEL PECCACCINO 4. (German)
24 December 2021
0 references
INSTALACIÓN DE UN SISTEMA FOTOVOLTAICO DE POTENCIA DE 100 KWP EN LOS TECHOS DE EDIFICIOS PARA USO PROMISCUO COLOCADOS EN VECCHIANO VÍA DEL PECCACCINO 4. (Spanish)
25 January 2022
0 references
INSTALLATION AF 100 KWP FOTOVOLTAISK KRAFTVÆRK PÅ BYGNINGER MED BLANDET ANVENDELSE INSTALLERET I VECCIANO VIA FÆLLES VACCINE 4. (Danish)
5 July 2022
0 references
ΕΓΚΑΤΆΣΤΑΣΗ ΦΩΤΟΒΟΛΤΑΪΚΟΎ ΣΤΑΘΜΟΎ ΙΣΧΎΟΣ 100 KWP ΣΕ ΚΤΊΡΙΑ ΜΙΚΤΉΣ ΧΡΉΣΗΣ ΠΟΥ ΕΓΚΑΘΊΣΤΑΝΤΑΙ ΣΤΟ VECCIANO ΜΈΣΩ ΚΟΙΝΟΎ ΕΜΒΟΛΊΟΥ 4. (Greek)
5 July 2022
0 references
UGRADNJA FOTONAPONSKE ELEKTRANE 100 KWP NA ZGRADE MJEŠOVITE NAMJENE INSTALIRANE U VECCIANU PUTEM ZAJEDNIČKOG CJEPIVA 4. (Croatian)
5 July 2022
0 references
INSTALAREA UNEI CENTRALE FOTOVOLTAICE DE 100 KWP PE CLĂDIRI CU UTILIZARE MIXTĂ INSTALATE ÎN VECCIANO PRIN INTERMEDIUL VACCINULUI COMUN 4. (Romanian)
5 July 2022
0 references
INŠTALÁCIA FOTOVOLTAICKEJ ELEKTRÁRNE S VÝKONOM 100 KWP NA ZMIEŠANÉ BUDOVY INŠTALOVANÉ VO VECCIANE PROSTREDNÍCTVOM SPOLOČNEJ VAKCÍNY 4. (Slovak)
5 July 2022
0 references
INSTALLAZZJONI TA’ IMPJANT TAL-ENERĠIJA FOTOVOLTAJKA TA’ 100 KWP F’BINI B’UŻU MĦALLAT INSTALLAT F’VECCIANO PERMEZZ TAL-VAĊĊIN KOMUNI 4. (Maltese)
5 July 2022
0 references
INSTALAÇÃO DE UTILIZADORES FOTOVOLTAICOS DE 100 KWP EM EDIFÍCIOS DE USO MISTO INSTALADOS EM VECCIANO ATRAVÉS DA VACINA COMUM 4. (Portuguese)
5 July 2022
0 references
100 KWP:N AURINKOSÄHKÖVOIMALAN ASENTAMINEN SEKAKÄYTÖSSÄ OLEVIIN RAKENNUKSIIN, JOTKA ON ASENNETTU VECCIANOON YHTEISEN ROKOTTEEN AVULLA 4. (Finnish)
5 July 2022
0 references
INSTALACJA ELEKTROWNI FOTOWOLTAICZNEJ O MOCY 100 KWP W BUDYNKACH O MIESZANYM UŻYTKOWANIU ZAINSTALOWANYCH W VECCIANO ZA POMOCĄ WSPÓLNEJ SZCZEPIONKI 4. (Polish)
5 July 2022
0 references
NAMESTITEV 100 KWP FOTONAPETOSTNE ELEKTRARNE NA STAVBE ZA MEŠANO UPORABO, NAMEŠČENE V VECCIANU S SKUPNIM CEPIVOM 4. (Slovenian)
5 July 2022
0 references
INSTALACE FOTOVOLTAICKÉ ELEKTRÁRNY O VÝKONU 100 KWP VE SMÍŠENÝCH BUDOVÁCH INSTALOVANÝCH VE VECCIANO PROSTŘEDNICTVÍM BĚŽNÉ VAKCÍNY 4. (Czech)
5 July 2022
0 references
100 KWP FOTOVOLTINĖS ELEKTRINĖS ĮRENGIMAS MIŠRIOS PASKIRTIES PASTATUOSE, ĮRENGTUOSE VECCIANO NAUDOJANT BENDRĄ VAKCINĄ 4. (Lithuanian)
5 July 2022
0 references
100 KWP FOTOELEMENTU SPĒKSTACIJAS UZSTĀDĪŠANA JAUKTA TIPA ĒKĀS, KAS UZSTĀDĪTAS VECCIANO, IZMANTOJOT PARASTO VAKCĪNU 4. (Latvian)
5 July 2022
0 references
ИНСТАЛИРАНЕ НА ФОТОВОЛТАИЧНА ЦЕНТРАЛА 100 KWP ВЪРХУ СГРАДИ СЪС СМЕСЕНО ПРЕДНАЗНАЧЕНИЕ, ИНСТАЛИРАНИ ВЪВ VECCIANO ЧРЕЗ ОБЩА ВАКСИНА 4. (Bulgarian)
5 July 2022
0 references
100 KWP FOTOVOLTAIKUS ERŐMŰ TELEPÍTÉSE VEGYES HASZNÁLATÚ ÉPÜLETEKBE VECCIANO TERÜLETÉN, KÖZÖS 4. OLTÓANYAGON KERESZTÜL. (Hungarian)
5 July 2022
0 references
GLÉASRA CUMHACHTA FÓTAVOLTACH 100 KWP A SHUITEÁIL AR FHOIRGNIMH INA BHFUIL ÚSÁID MHEASCTHA SUITEÁILTE I VECCIANO TRÍ VACSAÍN CHOITEANN 4. (Irish)
5 July 2022
0 references
INSTALLATION AV 100 KWP SOLCELLSKRAFTVERK PÅ BYGGNADER FÖR BLANDAD ANVÄNDNING SOM INSTALLERATS I VECCIANO VIA VANLIGT VACCIN 4. (Swedish)
5 July 2022
0 references
100 KWP FOTOGALVAANILISE ELEKTRIJAAMA PAIGALDAMINE MITMEOTSTARBELISTELE HOONETELE, MIS ON PAIGALDATUD VECCIANOSSE ÜHISE VAKTSIINIGA 4. (Estonian)
5 July 2022
0 references
VECCHIANO
0 references
8 April 2023
0 references
Identifiers
D58I15002190009
0 references