HIGHER TECHNICAL TRANSPORT AND INTERMODALITY — PADUA — SUSTAINABLE MOBILITY — SCOPE 2.3 INFMP MANAGEMENT AND LOGISTICAL INFRASTRUCTURE (Q1965603): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in pt) |
||||||||||||||
(12 intermediate revisions by 2 users not shown) | |||||||||||||||
label / fr | label / fr | ||||||||||||||
TECHNICIEN SUPÉRIEUR EN TRANSPORT ET INTERMODALITÉ — PADOUE — MOBILITÉ DURABLE — CHAMP D’APPLICATION 2.3 INFOMOBILITIES GESTION ET INFRASTRUCTURE LOGISTIQUE | |||||||||||||||
label / nl | label / nl | ||||||||||||||
SUPERIEURE TECHNICUS VAN VERVOER EN INTERMODALITEIT — PADUA — DUURZAME MOBILITEIT — SCOPE 2.3 INFOMOBILITIES BEHEER EN LOGISTIEKE INFRASTRUCTUUR | |||||||||||||||
label / de | label / de | ||||||||||||||
ÜBERLEGENER TECHNIKER VON TRANSPORT UND INTERMODALITÄT – PADUA – NACHHALTIGE MOBILITÄT – SCOPE 2.3 INFOMOBILITIES MANAGEMENT UND LOGISTIKINFRASTRUKTUR | |||||||||||||||
label / es | label / es | ||||||||||||||
TÉCNICO SUPERIOR DE TRANSPORTE E INTERMODALIDAD — PADUA — MOVILIDAD SOSTENIBLE — ALCANCE 2.3 INFOMOBILITIES GESTIÓN E INFRAESTRUCTURA LOGÍSTICA | |||||||||||||||
label / da | label / da | ||||||||||||||
HØJERE TEKNISK TRANSPORT OG INTERMODALITET — PADOVA — BÆREDYGTIG MOBILITET — ANVENDELSESOMRÅDE 2.3 FORVALTNING AF INFMP OG LOGISTISK INFRASTRUKTUR | |||||||||||||||
label / el | label / el | ||||||||||||||
ΥΨΗΛΌΤΕΡΕΣ ΤΕΧΝΙΚΈΣ ΜΕΤΑΦΟΡΈΣ ΚΑΙ ΔΙΑΤΡΟΠΙΚΌΤΗΤΑ — ΠΆΝΤΟΒΑ — ΒΙΏΣΙΜΗ ΚΙΝΗΤΙΚΌΤΗΤΑ — ΠΕΔΊΟ 2.3 ΔΙΑΧΕΊΡΙΣΗ ΚΑΙ ΥΛΙΚΟΤΕΧΝΙΚΉ ΥΠΟΔΟΜΉ INFMP | |||||||||||||||
label / hr | label / hr | ||||||||||||||
VIŠI TEHNIČKI PROMET I INTERMODALNOST – PADOVA – ODRŽIVA MOBILNOST – PODRUČJE PRIMJENE 2.3. UPRAVLJANJE INFMP-OM I LOGISTIČKA INFRASTRUKTURA | |||||||||||||||
label / ro | label / ro | ||||||||||||||
TRANSPORT TEHNIC SUPERIOR ȘI INTERMODALITATE – PADOVA – MOBILITATE DURABILĂ – DOMENIUL DE APLICARE 2.3 ADMINISTRAREA INFMP ȘI INFRASTRUCTURA LOGISTICĂ | |||||||||||||||
label / sk | label / sk | ||||||||||||||
VYŠŠIA TECHNICKÁ DOPRAVA A INTERMODALITA – PADUA – UDRŽATEĽNÁ MOBILITA – ROZSAH 2.3 RIADENIE INFMP A LOGISTICKÁ INFRAŠTRUKTÚRA | |||||||||||||||
label / mt | label / mt | ||||||||||||||
TRASPORT TEKNIKU U INTERMODALITÀ OGĦLA — PADUA — MOBILITÀ SOSTENIBBLI — KAMP TA’ APPLIKAZZJONI 2.3 ĠESTJONI INFMP U INFRASTRUTTURA LOĠISTIKA | |||||||||||||||
label / pt | label / pt | ||||||||||||||
TRANSPORTES TÉCNICOS E INTERMODALIDADE MAIS ELEVADOS — PADUA — MOBILIDADE SUSTENTÁVEL — ÂMBITO 2.3 GESTÃO DE INFORMAÇÕES E INFRAESTRUTURAS LOGÍSTICAS | |||||||||||||||
label / fi | label / fi | ||||||||||||||
TEKNISEN LIIKENTEEN JA INTERMODAALISUUDEN LISÄÄMINEN – PADOVA – KESTÄVÄ LIIKKUVUUS – SOVELTAMISALA 2.3 INFMP-JÄRJESTELMÄN HALLINNOINTI JA LOGISTINEN INFRASTRUKTUURI | |||||||||||||||
label / pl | label / pl | ||||||||||||||
WYŻSZY TRANSPORT TECHNICZNY I INTERMODALNOŚĆ – PADWA – MOBILNOŚĆ ZRÓWNOWAŻONA – ZAKRES 2.3 ZARZĄDZANIE INFMP I INFRASTRUKTURA LOGISTYCZNA | |||||||||||||||
label / sl | label / sl | ||||||||||||||
VIŠJI TEHNIČNI PROMET IN INTERMODALNOST – PADOVA – TRAJNOSTNA MOBILNOST – PODROČJE 2.3 UPRAVLJANJE INFMP IN LOGISTIČNA INFRASTRUKTURA | |||||||||||||||
label / cs | label / cs | ||||||||||||||
VYŠŠÍ TECHNICKÁ DOPRAVA A INTERMODALITA – PADOVA – UDRŽITELNÁ MOBILITA – OBLAST PŮSOBNOSTI 2.3 ŘÍZENÍ INFMP A LOGISTICKÁ INFRASTRUKTURA | |||||||||||||||
label / lt | label / lt | ||||||||||||||
AUKŠTESNIS TECHNINIS TRANSPORTAS IR INTERMODALUMAS – PADUJA – TVARUS JUDUMAS. 2.3 SRITIS – INFMP VALDYMAS IR LOGISTINĖ INFRASTRUKTŪRA | |||||||||||||||
label / lv | label / lv | ||||||||||||||
AUGSTĀKS TEHNISKAIS TRANSPORTS UN INTERMODALITĀTE — PADUA — ILGTSPĒJĪGA MOBILITĀTE — DARBĪBAS JOMA 2.3. INFMP PĀRVALDĪBA UN LOĢISTIKAS INFRASTRUKTŪRA | |||||||||||||||
label / bg | label / bg | ||||||||||||||
ПО-ГОЛЯМ ТЕХНИЧЕСКИ ТРАНСПОРТ И ИНТЕРМОДАЛНОСТ — ПАДУА — УСТОЙЧИВА МОБИЛНОСТ — ОБХВАТ 2.3 УПРАВЛЕНСКА ИНФРАСТРУКТУРА НА INFMP И ЛОГИСТИЧНА ИНФРАСТРУКТУРА | |||||||||||||||
label / hu | label / hu | ||||||||||||||
MAGASABB MŰSZAKI KÖZLEKEDÉS ÉS INTERMODALITÁS – PADOVA – FENNTARTHATÓ MOBILITÁS – 2.3. ALKALMAZÁSI KÖR, INFMP IRÁNYÍTÁSI ÉS LOGISZTIKAI INFRASTRUKTÚRA | |||||||||||||||
label / ga | label / ga | ||||||||||||||
IOMPAR TEICNIÚIL NÍOS AIRDE AGUS IDIRMHÓDÚLACHT — PADUA — SOGHLUAISTEACHT INBHUANAITHE — RAON FEIDHME 2.3 BAINISTÍOCHT INFMP AGUS BONNEAGAR LÓISTÍOCHTA | |||||||||||||||
label / sv | label / sv | ||||||||||||||
HÖGRE TEKNISK TRANSPORT OCH INTERMODALITET – PADUA – HÅLLBAR RÖRLIGHET – TILLÄMPNINGSOMRÅDE 2.3 INFMP-FÖRVALTNING OCH LOGISTIKINFRASTRUKTUR | |||||||||||||||
label / et | label / et | ||||||||||||||
PAREM TEHNILINE TRANSPORT JA ÜHENDVEOD – PADOVA – SÄÄSTEV LIIKUVUS – KOHALDAMISALA 2.3 INFMP HALDAMINE JA LOGISTILINE INFRASTRUKTUUR | |||||||||||||||
description / bg | description / bg | ||||||||||||||
Проект Q1965603 в Италия | |||||||||||||||
description / hr | description / hr | ||||||||||||||
Projekt Q1965603 u Italiji | |||||||||||||||
description / hu | description / hu | ||||||||||||||
Projekt Q1965603 Olaszországban | |||||||||||||||
description / cs | description / cs | ||||||||||||||
Projekt Q1965603 v Itálii | |||||||||||||||
description / da | description / da | ||||||||||||||
Projekt Q1965603 i Italien | |||||||||||||||
description / nl | description / nl | ||||||||||||||
Project Q1965603 in Italië | |||||||||||||||
description / et | description / et | ||||||||||||||
Projekt Q1965603 Itaalias | |||||||||||||||
description / fi | description / fi | ||||||||||||||
Projekti Q1965603 Italiassa | |||||||||||||||
description / fr | description / fr | ||||||||||||||
Projet Q1965603 en Italie | |||||||||||||||
description / de | description / de | ||||||||||||||
Projekt Q1965603 in Italien | |||||||||||||||
description / el | description / el | ||||||||||||||
Έργο Q1965603 στην Ιταλία | |||||||||||||||
description / ga | description / ga | ||||||||||||||
Tionscadal Q1965603 san Iodáil | |||||||||||||||
description / lv | description / lv | ||||||||||||||
Projekts Q1965603 Itālijā | |||||||||||||||
description / lt | description / lt | ||||||||||||||
Projektas Q1965603 Italijoje | |||||||||||||||
description / mt | description / mt | ||||||||||||||
Proġett Q1965603 fl-Italja | |||||||||||||||
description / pl | description / pl | ||||||||||||||
Projekt Q1965603 we Włoszech | |||||||||||||||
description / pt | description / pt | ||||||||||||||
Projeto Q1965603 na Itália | |||||||||||||||
description / ro | description / ro | ||||||||||||||
Proiectul Q1965603 în Italia | |||||||||||||||
description / sk | description / sk | ||||||||||||||
Projekt Q1965603 v Taliansku | |||||||||||||||
description / sl | description / sl | ||||||||||||||
Projekt Q1965603 v Italiji | |||||||||||||||
description / es | description / es | ||||||||||||||
Proyecto Q1965603 en Italia | |||||||||||||||
description / sv | description / sv | ||||||||||||||
Projekt Q1965603 i Italien | |||||||||||||||
Property / EU contribution | |||||||||||||||
| |||||||||||||||
Property / EU contribution: 42,500.0 Euro / rank | |||||||||||||||
Property / budget | |||||||||||||||
| |||||||||||||||
Property / budget: 85,000.0 Euro / rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
| |||||||||||||||
Property / co-financing rate: 50.0 percent / rank | |||||||||||||||
Property / end time | |||||||||||||||
| |||||||||||||||
Property / end time: 19 July 2018 / rank | |||||||||||||||
Property / summary: HIGHER TECHNICAL TRANSPORT AND INTERMODALITY — PADUA — SUSTAINABLE MOBILITY — SCOPE 2.3 INFMP MANAGEMENT AND LOGISTICAL INFRASTRUCTURE (English) / qualifier | |||||||||||||||
readability score: 0.0034587038625026
| |||||||||||||||
Property / contained in Local Administrative Unit | |||||||||||||||
Property / contained in Local Administrative Unit: Verona / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary | |||||||||||||||
TECHNICIEN SUPÉRIEUR EN TRANSPORT ET INTERMODALITÉ — PADOUE — MOBILITÉ DURABLE — CHAMP D’APPLICATION 2.3 INFOMOBILITIES GESTION ET INFRASTRUCTURE LOGISTIQUE (French) | |||||||||||||||
Property / summary: TECHNICIEN SUPÉRIEUR EN TRANSPORT ET INTERMODALITÉ — PADOUE — MOBILITÉ DURABLE — CHAMP D’APPLICATION 2.3 INFOMOBILITIES GESTION ET INFRASTRUCTURE LOGISTIQUE (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: TECHNICIEN SUPÉRIEUR EN TRANSPORT ET INTERMODALITÉ — PADOUE — MOBILITÉ DURABLE — CHAMP D’APPLICATION 2.3 INFOMOBILITIES GESTION ET INFRASTRUCTURE LOGISTIQUE (French) / qualifier | |||||||||||||||
point in time: 13 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
SUPERIEURE TECHNICUS VAN VERVOER EN INTERMODALITEIT — PADUA — DUURZAME MOBILITEIT — SCOPE 2.3 INFOMOBILITIES BEHEER EN LOGISTIEKE INFRASTRUCTUUR (Dutch) | |||||||||||||||
Property / summary: SUPERIEURE TECHNICUS VAN VERVOER EN INTERMODALITEIT — PADUA — DUURZAME MOBILITEIT — SCOPE 2.3 INFOMOBILITIES BEHEER EN LOGISTIEKE INFRASTRUCTUUR (Dutch) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: SUPERIEURE TECHNICUS VAN VERVOER EN INTERMODALITEIT — PADUA — DUURZAME MOBILITEIT — SCOPE 2.3 INFOMOBILITIES BEHEER EN LOGISTIEKE INFRASTRUCTUUR (Dutch) / qualifier | |||||||||||||||
point in time: 22 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
ÜBERLEGENER TECHNIKER VON TRANSPORT UND INTERMODALITÄT – PADUA – NACHHALTIGE MOBILITÄT – SCOPE 2.3 INFOMOBILITIES MANAGEMENT UND LOGISTIKINFRASTRUKTUR (German) | |||||||||||||||
Property / summary: ÜBERLEGENER TECHNIKER VON TRANSPORT UND INTERMODALITÄT – PADUA – NACHHALTIGE MOBILITÄT – SCOPE 2.3 INFOMOBILITIES MANAGEMENT UND LOGISTIKINFRASTRUKTUR (German) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: ÜBERLEGENER TECHNIKER VON TRANSPORT UND INTERMODALITÄT – PADUA – NACHHALTIGE MOBILITÄT – SCOPE 2.3 INFOMOBILITIES MANAGEMENT UND LOGISTIKINFRASTRUKTUR (German) / qualifier | |||||||||||||||
point in time: 23 December 2021
| |||||||||||||||
Property / summary | |||||||||||||||
TÉCNICO SUPERIOR DE TRANSPORTE E INTERMODALIDAD — PADUA — MOVILIDAD SOSTENIBLE — ALCANCE 2.3 INFOMOBILITIES GESTIÓN E INFRAESTRUCTURA LOGÍSTICA (Spanish) | |||||||||||||||
Property / summary: TÉCNICO SUPERIOR DE TRANSPORTE E INTERMODALIDAD — PADUA — MOVILIDAD SOSTENIBLE — ALCANCE 2.3 INFOMOBILITIES GESTIÓN E INFRAESTRUCTURA LOGÍSTICA (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: TÉCNICO SUPERIOR DE TRANSPORTE E INTERMODALIDAD — PADUA — MOVILIDAD SOSTENIBLE — ALCANCE 2.3 INFOMOBILITIES GESTIÓN E INFRAESTRUCTURA LOGÍSTICA (Spanish) / qualifier | |||||||||||||||
point in time: 24 January 2022
| |||||||||||||||
Property / summary | |||||||||||||||
HØJERE TEKNISK TRANSPORT OG INTERMODALITET — PADOVA — BÆREDYGTIG MOBILITET — ANVENDELSESOMRÅDE 2.3 FORVALTNING AF INFMP OG LOGISTISK INFRASTRUKTUR (Danish) | |||||||||||||||
Property / summary: HØJERE TEKNISK TRANSPORT OG INTERMODALITET — PADOVA — BÆREDYGTIG MOBILITET — ANVENDELSESOMRÅDE 2.3 FORVALTNING AF INFMP OG LOGISTISK INFRASTRUKTUR (Danish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HØJERE TEKNISK TRANSPORT OG INTERMODALITET — PADOVA — BÆREDYGTIG MOBILITET — ANVENDELSESOMRÅDE 2.3 FORVALTNING AF INFMP OG LOGISTISK INFRASTRUKTUR (Danish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
ΥΨΗΛΌΤΕΡΕΣ ΤΕΧΝΙΚΈΣ ΜΕΤΑΦΟΡΈΣ ΚΑΙ ΔΙΑΤΡΟΠΙΚΌΤΗΤΑ — ΠΆΝΤΟΒΑ — ΒΙΏΣΙΜΗ ΚΙΝΗΤΙΚΌΤΗΤΑ — ΠΕΔΊΟ 2.3 ΔΙΑΧΕΊΡΙΣΗ ΚΑΙ ΥΛΙΚΟΤΕΧΝΙΚΉ ΥΠΟΔΟΜΉ INFMP (Greek) | |||||||||||||||
Property / summary: ΥΨΗΛΌΤΕΡΕΣ ΤΕΧΝΙΚΈΣ ΜΕΤΑΦΟΡΈΣ ΚΑΙ ΔΙΑΤΡΟΠΙΚΌΤΗΤΑ — ΠΆΝΤΟΒΑ — ΒΙΏΣΙΜΗ ΚΙΝΗΤΙΚΌΤΗΤΑ — ΠΕΔΊΟ 2.3 ΔΙΑΧΕΊΡΙΣΗ ΚΑΙ ΥΛΙΚΟΤΕΧΝΙΚΉ ΥΠΟΔΟΜΉ INFMP (Greek) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: ΥΨΗΛΌΤΕΡΕΣ ΤΕΧΝΙΚΈΣ ΜΕΤΑΦΟΡΈΣ ΚΑΙ ΔΙΑΤΡΟΠΙΚΌΤΗΤΑ — ΠΆΝΤΟΒΑ — ΒΙΏΣΙΜΗ ΚΙΝΗΤΙΚΌΤΗΤΑ — ΠΕΔΊΟ 2.3 ΔΙΑΧΕΊΡΙΣΗ ΚΑΙ ΥΛΙΚΟΤΕΧΝΙΚΉ ΥΠΟΔΟΜΉ INFMP (Greek) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
VIŠI TEHNIČKI PROMET I INTERMODALNOST – PADOVA – ODRŽIVA MOBILNOST – PODRUČJE PRIMJENE 2.3. UPRAVLJANJE INFMP-OM I LOGISTIČKA INFRASTRUKTURA (Croatian) | |||||||||||||||
Property / summary: VIŠI TEHNIČKI PROMET I INTERMODALNOST – PADOVA – ODRŽIVA MOBILNOST – PODRUČJE PRIMJENE 2.3. UPRAVLJANJE INFMP-OM I LOGISTIČKA INFRASTRUKTURA (Croatian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: VIŠI TEHNIČKI PROMET I INTERMODALNOST – PADOVA – ODRŽIVA MOBILNOST – PODRUČJE PRIMJENE 2.3. UPRAVLJANJE INFMP-OM I LOGISTIČKA INFRASTRUKTURA (Croatian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
TRANSPORT TEHNIC SUPERIOR ȘI INTERMODALITATE – PADOVA – MOBILITATE DURABILĂ – DOMENIUL DE APLICARE 2.3 ADMINISTRAREA INFMP ȘI INFRASTRUCTURA LOGISTICĂ (Romanian) | |||||||||||||||
Property / summary: TRANSPORT TEHNIC SUPERIOR ȘI INTERMODALITATE – PADOVA – MOBILITATE DURABILĂ – DOMENIUL DE APLICARE 2.3 ADMINISTRAREA INFMP ȘI INFRASTRUCTURA LOGISTICĂ (Romanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: TRANSPORT TEHNIC SUPERIOR ȘI INTERMODALITATE – PADOVA – MOBILITATE DURABILĂ – DOMENIUL DE APLICARE 2.3 ADMINISTRAREA INFMP ȘI INFRASTRUCTURA LOGISTICĂ (Romanian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
VYŠŠIA TECHNICKÁ DOPRAVA A INTERMODALITA – PADUA – UDRŽATEĽNÁ MOBILITA – ROZSAH 2.3 RIADENIE INFMP A LOGISTICKÁ INFRAŠTRUKTÚRA (Slovak) | |||||||||||||||
Property / summary: VYŠŠIA TECHNICKÁ DOPRAVA A INTERMODALITA – PADUA – UDRŽATEĽNÁ MOBILITA – ROZSAH 2.3 RIADENIE INFMP A LOGISTICKÁ INFRAŠTRUKTÚRA (Slovak) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: VYŠŠIA TECHNICKÁ DOPRAVA A INTERMODALITA – PADUA – UDRŽATEĽNÁ MOBILITA – ROZSAH 2.3 RIADENIE INFMP A LOGISTICKÁ INFRAŠTRUKTÚRA (Slovak) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
TRASPORT TEKNIKU U INTERMODALITÀ OGĦLA — PADUA — MOBILITÀ SOSTENIBBLI — KAMP TA’ APPLIKAZZJONI 2.3 ĠESTJONI INFMP U INFRASTRUTTURA LOĠISTIKA (Maltese) | |||||||||||||||
Property / summary: TRASPORT TEKNIKU U INTERMODALITÀ OGĦLA — PADUA — MOBILITÀ SOSTENIBBLI — KAMP TA’ APPLIKAZZJONI 2.3 ĠESTJONI INFMP U INFRASTRUTTURA LOĠISTIKA (Maltese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: TRASPORT TEKNIKU U INTERMODALITÀ OGĦLA — PADUA — MOBILITÀ SOSTENIBBLI — KAMP TA’ APPLIKAZZJONI 2.3 ĠESTJONI INFMP U INFRASTRUTTURA LOĠISTIKA (Maltese) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
TRANSPORTES TÉCNICOS E INTERMODALIDADE MAIS ELEVADOS — PADUA — MOBILIDADE SUSTENTÁVEL — ÂMBITO 2.3 GESTÃO DE INFORMAÇÕES E INFRAESTRUTURAS LOGÍSTICAS (Portuguese) | |||||||||||||||
Property / summary: TRANSPORTES TÉCNICOS E INTERMODALIDADE MAIS ELEVADOS — PADUA — MOBILIDADE SUSTENTÁVEL — ÂMBITO 2.3 GESTÃO DE INFORMAÇÕES E INFRAESTRUTURAS LOGÍSTICAS (Portuguese) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: TRANSPORTES TÉCNICOS E INTERMODALIDADE MAIS ELEVADOS — PADUA — MOBILIDADE SUSTENTÁVEL — ÂMBITO 2.3 GESTÃO DE INFORMAÇÕES E INFRAESTRUTURAS LOGÍSTICAS (Portuguese) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
TEKNISEN LIIKENTEEN JA INTERMODAALISUUDEN LISÄÄMINEN – PADOVA – KESTÄVÄ LIIKKUVUUS – SOVELTAMISALA 2.3 INFMP-JÄRJESTELMÄN HALLINNOINTI JA LOGISTINEN INFRASTRUKTUURI (Finnish) | |||||||||||||||
Property / summary: TEKNISEN LIIKENTEEN JA INTERMODAALISUUDEN LISÄÄMINEN – PADOVA – KESTÄVÄ LIIKKUVUUS – SOVELTAMISALA 2.3 INFMP-JÄRJESTELMÄN HALLINNOINTI JA LOGISTINEN INFRASTRUKTUURI (Finnish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: TEKNISEN LIIKENTEEN JA INTERMODAALISUUDEN LISÄÄMINEN – PADOVA – KESTÄVÄ LIIKKUVUUS – SOVELTAMISALA 2.3 INFMP-JÄRJESTELMÄN HALLINNOINTI JA LOGISTINEN INFRASTRUKTUURI (Finnish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
WYŻSZY TRANSPORT TECHNICZNY I INTERMODALNOŚĆ – PADWA – MOBILNOŚĆ ZRÓWNOWAŻONA – ZAKRES 2.3 ZARZĄDZANIE INFMP I INFRASTRUKTURA LOGISTYCZNA (Polish) | |||||||||||||||
Property / summary: WYŻSZY TRANSPORT TECHNICZNY I INTERMODALNOŚĆ – PADWA – MOBILNOŚĆ ZRÓWNOWAŻONA – ZAKRES 2.3 ZARZĄDZANIE INFMP I INFRASTRUKTURA LOGISTYCZNA (Polish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: WYŻSZY TRANSPORT TECHNICZNY I INTERMODALNOŚĆ – PADWA – MOBILNOŚĆ ZRÓWNOWAŻONA – ZAKRES 2.3 ZARZĄDZANIE INFMP I INFRASTRUKTURA LOGISTYCZNA (Polish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
VIŠJI TEHNIČNI PROMET IN INTERMODALNOST – PADOVA – TRAJNOSTNA MOBILNOST – PODROČJE 2.3 UPRAVLJANJE INFMP IN LOGISTIČNA INFRASTRUKTURA (Slovenian) | |||||||||||||||
Property / summary: VIŠJI TEHNIČNI PROMET IN INTERMODALNOST – PADOVA – TRAJNOSTNA MOBILNOST – PODROČJE 2.3 UPRAVLJANJE INFMP IN LOGISTIČNA INFRASTRUKTURA (Slovenian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: VIŠJI TEHNIČNI PROMET IN INTERMODALNOST – PADOVA – TRAJNOSTNA MOBILNOST – PODROČJE 2.3 UPRAVLJANJE INFMP IN LOGISTIČNA INFRASTRUKTURA (Slovenian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
VYŠŠÍ TECHNICKÁ DOPRAVA A INTERMODALITA – PADOVA – UDRŽITELNÁ MOBILITA – OBLAST PŮSOBNOSTI 2.3 ŘÍZENÍ INFMP A LOGISTICKÁ INFRASTRUKTURA (Czech) | |||||||||||||||
Property / summary: VYŠŠÍ TECHNICKÁ DOPRAVA A INTERMODALITA – PADOVA – UDRŽITELNÁ MOBILITA – OBLAST PŮSOBNOSTI 2.3 ŘÍZENÍ INFMP A LOGISTICKÁ INFRASTRUKTURA (Czech) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: VYŠŠÍ TECHNICKÁ DOPRAVA A INTERMODALITA – PADOVA – UDRŽITELNÁ MOBILITA – OBLAST PŮSOBNOSTI 2.3 ŘÍZENÍ INFMP A LOGISTICKÁ INFRASTRUKTURA (Czech) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
AUKŠTESNIS TECHNINIS TRANSPORTAS IR INTERMODALUMAS – PADUJA – TVARUS JUDUMAS. 2.3 SRITIS – INFMP VALDYMAS IR LOGISTINĖ INFRASTRUKTŪRA (Lithuanian) | |||||||||||||||
Property / summary: AUKŠTESNIS TECHNINIS TRANSPORTAS IR INTERMODALUMAS – PADUJA – TVARUS JUDUMAS. 2.3 SRITIS – INFMP VALDYMAS IR LOGISTINĖ INFRASTRUKTŪRA (Lithuanian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: AUKŠTESNIS TECHNINIS TRANSPORTAS IR INTERMODALUMAS – PADUJA – TVARUS JUDUMAS. 2.3 SRITIS – INFMP VALDYMAS IR LOGISTINĖ INFRASTRUKTŪRA (Lithuanian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
AUGSTĀKS TEHNISKAIS TRANSPORTS UN INTERMODALITĀTE — PADUA — ILGTSPĒJĪGA MOBILITĀTE — DARBĪBAS JOMA 2.3. INFMP PĀRVALDĪBA UN LOĢISTIKAS INFRASTRUKTŪRA (Latvian) | |||||||||||||||
Property / summary: AUGSTĀKS TEHNISKAIS TRANSPORTS UN INTERMODALITĀTE — PADUA — ILGTSPĒJĪGA MOBILITĀTE — DARBĪBAS JOMA 2.3. INFMP PĀRVALDĪBA UN LOĢISTIKAS INFRASTRUKTŪRA (Latvian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: AUGSTĀKS TEHNISKAIS TRANSPORTS UN INTERMODALITĀTE — PADUA — ILGTSPĒJĪGA MOBILITĀTE — DARBĪBAS JOMA 2.3. INFMP PĀRVALDĪBA UN LOĢISTIKAS INFRASTRUKTŪRA (Latvian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
ПО-ГОЛЯМ ТЕХНИЧЕСКИ ТРАНСПОРТ И ИНТЕРМОДАЛНОСТ — ПАДУА — УСТОЙЧИВА МОБИЛНОСТ — ОБХВАТ 2.3 УПРАВЛЕНСКА ИНФРАСТРУКТУРА НА INFMP И ЛОГИСТИЧНА ИНФРАСТРУКТУРА (Bulgarian) | |||||||||||||||
Property / summary: ПО-ГОЛЯМ ТЕХНИЧЕСКИ ТРАНСПОРТ И ИНТЕРМОДАЛНОСТ — ПАДУА — УСТОЙЧИВА МОБИЛНОСТ — ОБХВАТ 2.3 УПРАВЛЕНСКА ИНФРАСТРУКТУРА НА INFMP И ЛОГИСТИЧНА ИНФРАСТРУКТУРА (Bulgarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: ПО-ГОЛЯМ ТЕХНИЧЕСКИ ТРАНСПОРТ И ИНТЕРМОДАЛНОСТ — ПАДУА — УСТОЙЧИВА МОБИЛНОСТ — ОБХВАТ 2.3 УПРАВЛЕНСКА ИНФРАСТРУКТУРА НА INFMP И ЛОГИСТИЧНА ИНФРАСТРУКТУРА (Bulgarian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
MAGASABB MŰSZAKI KÖZLEKEDÉS ÉS INTERMODALITÁS – PADOVA – FENNTARTHATÓ MOBILITÁS – 2.3. ALKALMAZÁSI KÖR, INFMP IRÁNYÍTÁSI ÉS LOGISZTIKAI INFRASTRUKTÚRA (Hungarian) | |||||||||||||||
Property / summary: MAGASABB MŰSZAKI KÖZLEKEDÉS ÉS INTERMODALITÁS – PADOVA – FENNTARTHATÓ MOBILITÁS – 2.3. ALKALMAZÁSI KÖR, INFMP IRÁNYÍTÁSI ÉS LOGISZTIKAI INFRASTRUKTÚRA (Hungarian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: MAGASABB MŰSZAKI KÖZLEKEDÉS ÉS INTERMODALITÁS – PADOVA – FENNTARTHATÓ MOBILITÁS – 2.3. ALKALMAZÁSI KÖR, INFMP IRÁNYÍTÁSI ÉS LOGISZTIKAI INFRASTRUKTÚRA (Hungarian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
IOMPAR TEICNIÚIL NÍOS AIRDE AGUS IDIRMHÓDÚLACHT — PADUA — SOGHLUAISTEACHT INBHUANAITHE — RAON FEIDHME 2.3 BAINISTÍOCHT INFMP AGUS BONNEAGAR LÓISTÍOCHTA (Irish) | |||||||||||||||
Property / summary: IOMPAR TEICNIÚIL NÍOS AIRDE AGUS IDIRMHÓDÚLACHT — PADUA — SOGHLUAISTEACHT INBHUANAITHE — RAON FEIDHME 2.3 BAINISTÍOCHT INFMP AGUS BONNEAGAR LÓISTÍOCHTA (Irish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: IOMPAR TEICNIÚIL NÍOS AIRDE AGUS IDIRMHÓDÚLACHT — PADUA — SOGHLUAISTEACHT INBHUANAITHE — RAON FEIDHME 2.3 BAINISTÍOCHT INFMP AGUS BONNEAGAR LÓISTÍOCHTA (Irish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
HÖGRE TEKNISK TRANSPORT OCH INTERMODALITET – PADUA – HÅLLBAR RÖRLIGHET – TILLÄMPNINGSOMRÅDE 2.3 INFMP-FÖRVALTNING OCH LOGISTIKINFRASTRUKTUR (Swedish) | |||||||||||||||
Property / summary: HÖGRE TEKNISK TRANSPORT OCH INTERMODALITET – PADUA – HÅLLBAR RÖRLIGHET – TILLÄMPNINGSOMRÅDE 2.3 INFMP-FÖRVALTNING OCH LOGISTIKINFRASTRUKTUR (Swedish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: HÖGRE TEKNISK TRANSPORT OCH INTERMODALITET – PADUA – HÅLLBAR RÖRLIGHET – TILLÄMPNINGSOMRÅDE 2.3 INFMP-FÖRVALTNING OCH LOGISTIKINFRASTRUKTUR (Swedish) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / summary | |||||||||||||||
PAREM TEHNILINE TRANSPORT JA ÜHENDVEOD – PADOVA – SÄÄSTEV LIIKUVUS – KOHALDAMISALA 2.3 INFMP HALDAMINE JA LOGISTILINE INFRASTRUKTUUR (Estonian) | |||||||||||||||
Property / summary: PAREM TEHNILINE TRANSPORT JA ÜHENDVEOD – PADOVA – SÄÄSTEV LIIKUVUS – KOHALDAMISALA 2.3 INFMP HALDAMINE JA LOGISTILINE INFRASTRUKTUUR (Estonian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: PAREM TEHNILINE TRANSPORT JA ÜHENDVEOD – PADOVA – SÄÄSTEV LIIKUVUS – KOHALDAMISALA 2.3 INFMP HALDAMINE JA LOGISTILINE INFRASTRUKTUUR (Estonian) / qualifier | |||||||||||||||
point in time: 4 July 2022
| |||||||||||||||
Property / location (string) | |||||||||||||||
VERONA | |||||||||||||||
Property / location (string): VERONA / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / priority axis | |||||||||||||||
Property / priority axis: Education and training / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / thematic objective | |||||||||||||||
Property / thematic objective: Educational and vocational training / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / end time | |||||||||||||||
11 February 2020
| |||||||||||||||
Property / end time: 11 February 2020 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / budget | |||||||||||||||
84,956.0 Euro
| |||||||||||||||
Property / budget: 84,956.0 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / EU contribution | |||||||||||||||
84,932.3 Euro
| |||||||||||||||
Property / EU contribution: 84,932.3 Euro / rank | |||||||||||||||
Preferred rank | |||||||||||||||
Property / co-financing rate | |||||||||||||||
99.97 percent
| |||||||||||||||
Property / co-financing rate: 99.97 percent / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / date of last update | |||||||||||||||
8 April 2023
| |||||||||||||||
Property / date of last update: 8 April 2023 / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / Call for proposal | |||||||||||||||
Property / Call for proposal: DGR 778/16 - ITS. APPROV. DEL PIANO TERRITORIALE TRIENNALE 2016-2018 / rank | |||||||||||||||
Normal rank |
Latest revision as of 18:46, 9 October 2024
Project Q1965603 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | HIGHER TECHNICAL TRANSPORT AND INTERMODALITY — PADUA — SUSTAINABLE MOBILITY — SCOPE 2.3 INFMP MANAGEMENT AND LOGISTICAL INFRASTRUCTURE |
Project Q1965603 in Italy |
Statements
84,932.3 Euro
0 references
84,956.0 Euro
0 references
99.97 percent
0 references
14 September 2016
0 references
11 February 2020
0 references
27 October 2019
0 references
FONDAZIONE ITS AREA TECNOLOGICA DELLA MOBILITA' SOSTENIBILE- LOGISTICA E SISTEMI
0 references
TECNICO SUPERIORE DEI TRASPORTI E DELL'INTERMODALITA' - PADOVA - MOBILITA' SOSTENIBILE - AMBITO 2.3 GESTIONE INFOMOBILITA' E INFRASTRUTTURE LOGISTICHE (Italian)
0 references
HIGHER TECHNICAL TRANSPORT AND INTERMODALITY — PADUA — SUSTAINABLE MOBILITY — SCOPE 2.3 INFMP MANAGEMENT AND LOGISTICAL INFRASTRUCTURE (English)
0.0034587038625026
0 references
TECHNICIEN SUPÉRIEUR EN TRANSPORT ET INTERMODALITÉ — PADOUE — MOBILITÉ DURABLE — CHAMP D’APPLICATION 2.3 INFOMOBILITIES GESTION ET INFRASTRUCTURE LOGISTIQUE (French)
13 December 2021
0 references
SUPERIEURE TECHNICUS VAN VERVOER EN INTERMODALITEIT — PADUA — DUURZAME MOBILITEIT — SCOPE 2.3 INFOMOBILITIES BEHEER EN LOGISTIEKE INFRASTRUCTUUR (Dutch)
22 December 2021
0 references
ÜBERLEGENER TECHNIKER VON TRANSPORT UND INTERMODALITÄT – PADUA – NACHHALTIGE MOBILITÄT – SCOPE 2.3 INFOMOBILITIES MANAGEMENT UND LOGISTIKINFRASTRUKTUR (German)
23 December 2021
0 references
TÉCNICO SUPERIOR DE TRANSPORTE E INTERMODALIDAD — PADUA — MOVILIDAD SOSTENIBLE — ALCANCE 2.3 INFOMOBILITIES GESTIÓN E INFRAESTRUCTURA LOGÍSTICA (Spanish)
24 January 2022
0 references
HØJERE TEKNISK TRANSPORT OG INTERMODALITET — PADOVA — BÆREDYGTIG MOBILITET — ANVENDELSESOMRÅDE 2.3 FORVALTNING AF INFMP OG LOGISTISK INFRASTRUKTUR (Danish)
4 July 2022
0 references
ΥΨΗΛΌΤΕΡΕΣ ΤΕΧΝΙΚΈΣ ΜΕΤΑΦΟΡΈΣ ΚΑΙ ΔΙΑΤΡΟΠΙΚΌΤΗΤΑ — ΠΆΝΤΟΒΑ — ΒΙΏΣΙΜΗ ΚΙΝΗΤΙΚΌΤΗΤΑ — ΠΕΔΊΟ 2.3 ΔΙΑΧΕΊΡΙΣΗ ΚΑΙ ΥΛΙΚΟΤΕΧΝΙΚΉ ΥΠΟΔΟΜΉ INFMP (Greek)
4 July 2022
0 references
VIŠI TEHNIČKI PROMET I INTERMODALNOST – PADOVA – ODRŽIVA MOBILNOST – PODRUČJE PRIMJENE 2.3. UPRAVLJANJE INFMP-OM I LOGISTIČKA INFRASTRUKTURA (Croatian)
4 July 2022
0 references
TRANSPORT TEHNIC SUPERIOR ȘI INTERMODALITATE – PADOVA – MOBILITATE DURABILĂ – DOMENIUL DE APLICARE 2.3 ADMINISTRAREA INFMP ȘI INFRASTRUCTURA LOGISTICĂ (Romanian)
4 July 2022
0 references
VYŠŠIA TECHNICKÁ DOPRAVA A INTERMODALITA – PADUA – UDRŽATEĽNÁ MOBILITA – ROZSAH 2.3 RIADENIE INFMP A LOGISTICKÁ INFRAŠTRUKTÚRA (Slovak)
4 July 2022
0 references
TRASPORT TEKNIKU U INTERMODALITÀ OGĦLA — PADUA — MOBILITÀ SOSTENIBBLI — KAMP TA’ APPLIKAZZJONI 2.3 ĠESTJONI INFMP U INFRASTRUTTURA LOĠISTIKA (Maltese)
4 July 2022
0 references
TRANSPORTES TÉCNICOS E INTERMODALIDADE MAIS ELEVADOS — PADUA — MOBILIDADE SUSTENTÁVEL — ÂMBITO 2.3 GESTÃO DE INFORMAÇÕES E INFRAESTRUTURAS LOGÍSTICAS (Portuguese)
4 July 2022
0 references
TEKNISEN LIIKENTEEN JA INTERMODAALISUUDEN LISÄÄMINEN – PADOVA – KESTÄVÄ LIIKKUVUUS – SOVELTAMISALA 2.3 INFMP-JÄRJESTELMÄN HALLINNOINTI JA LOGISTINEN INFRASTRUKTUURI (Finnish)
4 July 2022
0 references
WYŻSZY TRANSPORT TECHNICZNY I INTERMODALNOŚĆ – PADWA – MOBILNOŚĆ ZRÓWNOWAŻONA – ZAKRES 2.3 ZARZĄDZANIE INFMP I INFRASTRUKTURA LOGISTYCZNA (Polish)
4 July 2022
0 references
VIŠJI TEHNIČNI PROMET IN INTERMODALNOST – PADOVA – TRAJNOSTNA MOBILNOST – PODROČJE 2.3 UPRAVLJANJE INFMP IN LOGISTIČNA INFRASTRUKTURA (Slovenian)
4 July 2022
0 references
VYŠŠÍ TECHNICKÁ DOPRAVA A INTERMODALITA – PADOVA – UDRŽITELNÁ MOBILITA – OBLAST PŮSOBNOSTI 2.3 ŘÍZENÍ INFMP A LOGISTICKÁ INFRASTRUKTURA (Czech)
4 July 2022
0 references
AUKŠTESNIS TECHNINIS TRANSPORTAS IR INTERMODALUMAS – PADUJA – TVARUS JUDUMAS. 2.3 SRITIS – INFMP VALDYMAS IR LOGISTINĖ INFRASTRUKTŪRA (Lithuanian)
4 July 2022
0 references
AUGSTĀKS TEHNISKAIS TRANSPORTS UN INTERMODALITĀTE — PADUA — ILGTSPĒJĪGA MOBILITĀTE — DARBĪBAS JOMA 2.3. INFMP PĀRVALDĪBA UN LOĢISTIKAS INFRASTRUKTŪRA (Latvian)
4 July 2022
0 references
ПО-ГОЛЯМ ТЕХНИЧЕСКИ ТРАНСПОРТ И ИНТЕРМОДАЛНОСТ — ПАДУА — УСТОЙЧИВА МОБИЛНОСТ — ОБХВАТ 2.3 УПРАВЛЕНСКА ИНФРАСТРУКТУРА НА INFMP И ЛОГИСТИЧНА ИНФРАСТРУКТУРА (Bulgarian)
4 July 2022
0 references
MAGASABB MŰSZAKI KÖZLEKEDÉS ÉS INTERMODALITÁS – PADOVA – FENNTARTHATÓ MOBILITÁS – 2.3. ALKALMAZÁSI KÖR, INFMP IRÁNYÍTÁSI ÉS LOGISZTIKAI INFRASTRUKTÚRA (Hungarian)
4 July 2022
0 references
IOMPAR TEICNIÚIL NÍOS AIRDE AGUS IDIRMHÓDÚLACHT — PADUA — SOGHLUAISTEACHT INBHUANAITHE — RAON FEIDHME 2.3 BAINISTÍOCHT INFMP AGUS BONNEAGAR LÓISTÍOCHTA (Irish)
4 July 2022
0 references
HÖGRE TEKNISK TRANSPORT OCH INTERMODALITET – PADUA – HÅLLBAR RÖRLIGHET – TILLÄMPNINGSOMRÅDE 2.3 INFMP-FÖRVALTNING OCH LOGISTIKINFRASTRUKTUR (Swedish)
4 July 2022
0 references
PAREM TEHNILINE TRANSPORT JA ÜHENDVEOD – PADOVA – SÄÄSTEV LIIKUVUS – KOHALDAMISALA 2.3 INFMP HALDAMINE JA LOGISTILINE INFRASTRUKTUUR (Estonian)
4 July 2022
0 references
VERONA
0 references
8 April 2023
0 references
Identifiers
H39D16003350007
0 references