Construction of photovoltaic installations and heat pumps on waste water treatment plant in Płoty (Q137686): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project is based on the site. the construction site is located in m. the project is located on the site, located in m. the project will be built on the Site of Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the project will be carried out in the area of the Strategic Intervention (SSW). the projec...)
(‎Changed label, description and/or aliases in pt)
 
(24 intermediate revisions by 2 users not shown)
label / enlabel / en
Construction of a photovoltaic and heat pump on a sewage treatment plant in Płock
Construction of photovoltaic installations and heat pumps on waste water treatment plant in Płoty
label / frlabel / fr
 
Construction d’une installation photovoltaïque et d’une pompe à chaleur sur la station d’épuration de Płoty
label / delabel / de
 
Bau einer Photovoltaikanlage und Wärmepumpe an der Kläranlage in Płoty
label / nllabel / nl
 
Bouw van een fotovoltaïsche installatie en warmtepomp op de rioolwaterzuiveringsinstallatie in Płoty
label / itlabel / it
 
Costruzione di un impianto fotovoltaico e di una pompa di calore nell'impianto di depurazione di Płoty
label / eslabel / es
 
Construcción de una instalación fotovoltaica y bomba de calor en la depuradora de aguas residuales de Płoty
label / dalabel / da
 
Opførelse af et solcelleanlæg og varmepumpe på rensningsanlægget i Płoty
label / ellabel / el
 
Κατασκευή φωτοβολταϊκής εγκατάστασης και αντλίας θερμότητας στη μονάδα επεξεργασίας λυμάτων στο Płoty
label / hrlabel / hr
 
Izgradnja fotonaponske instalacije i toplinske pumpe na postrojenju za pročišćavanje otpadnih voda u Płotyju
label / rolabel / ro
 
Construirea unei instalații fotovoltaice și a unei pompe de căldură pe stația de epurare a apelor uzate din Płoty
label / sklabel / sk
 
Výstavba fotovoltaickej inštalácie a tepelného čerpadla v čistiarni odpadových vôd v Płotoch
label / mtlabel / mt
 
Kostruzzjoni ta’ installazzjoni fotovoltajka u pompa tas-sħana fl-impjant tat-trattament tad-drenaġġ fi Płoty
label / ptlabel / pt
 
Construção de instalações fotovoltaicas e bombas de calor numa estação de tratamento de águas residuais em Płoty
label / filabel / fi
 
Aurinkosähkölaitteiston ja lämpöpumpun rakentaminen Płotyn jätevedenpuhdistamoon
label / sllabel / sl
 
Gradnja fotonapetostne naprave in toplotne črpalke na napravi za čiščenje odplak v Płotyju
label / cslabel / cs
 
Výstavba fotovoltaické instalace a tepelného čerpadla v čistírně odpadních vod v Płotech
label / ltlabel / lt
 
Fotovoltinio įrenginio ir šilumos siurblio statyba Ploty nuotekų valymo įrenginiuose
label / lvlabel / lv
 
Fotoelementu iekārtas un siltumsūkņa būvniecība notekūdeņu attīrīšanas iekārtā Plotē
label / bglabel / bg
 
Изграждане на фотоволтаична инсталация и термопомпа на пречиствателната станция за отпадъчни води в Плоти
label / hulabel / hu
 
Fotovoltaikus berendezés és hőszivattyú építése a płotyi szennyvíztisztító telepen
label / galabel / ga
 
Suiteáil fhótavoltach agus teaschaidéal a thógáil ar an ngléasra cóireála séarachais in Płoty
label / svlabel / sv
 
Uppförande av en solcellsanläggning och värmepump på avloppsreningsverket i Płoty
label / etlabel / et
 
Płoty reoveepuhastile fotogalvaanilise seadme ja soojuspumba ehitamine
description / endescription / en
Project in Poland financed by DG Regio
Project Q137686 in Poland
description / pldescription / pl
Projekt w Polsce finansowany przez DG Regio
Projekt Q137686 w Polsce
description / bgdescription / bg
 
Проект Q137686 в Полша
description / hrdescription / hr
 
Projekt Q137686 u Poljskoj
description / hudescription / hu
 
Projekt Q137686 Lengyelországban
description / csdescription / cs
 
Projekt Q137686 v Polsku
description / dadescription / da
 
Projekt Q137686 i Polen
description / nldescription / nl
 
Project Q137686 in Polen
description / etdescription / et
 
Projekt Q137686 Poolas
description / fidescription / fi
 
Projekti Q137686 Puolassa
description / frdescription / fr
 
Projet Q137686 en Pologne
description / dedescription / de
 
Projekt Q137686 in Polen
description / eldescription / el
 
Έργο Q137686 στην Πολωνία
description / gadescription / ga
 
Tionscadal Q137686 sa Pholainn
description / itdescription / it
 
Progetto Q137686 in Polonia
description / lvdescription / lv
 
Projekts Q137686 Polijā
description / ltdescription / lt
 
Projektas Q137686 Lenkijoje
description / mtdescription / mt
 
Proġett Q137686 fil-Polonja
description / ptdescription / pt
 
Projeto Q137686 na Polônia
description / rodescription / ro
 
Proiectul Q137686 în Polonia
description / skdescription / sk
 
Projekt Q137686 v Poľsku
description / sldescription / sl
 
Projekt Q137686 na Poljskem
description / esdescription / es
 
Proyecto Q137686 en Polonia
description / svdescription / sv
 
Projekt Q137686 i Polen
Property / EU contributionProperty / EU contribution
486,614.75 Euro
Amount486,614.75 Euro
UnitEuro
450,726.91 Euro
Amount450,726.91 Euro
UnitEuro
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 
Property / end time
30 June 2019
Timestamp+2019-06-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 30 June 2019 / rank
Normal rank
 
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 
Property / budgetProperty / budget
572,487.96 Euro
Amount572,487.96 Euro
UnitEuro
530,266.97 Euro
Amount530,266.97 Euro
UnitEuro
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Gryfice / rank
 
Normal rank
Property / contained in Local Administrative Unit: Gryfice / qualifier
 
Property / summary
 
The project will be implemented in the area of Strategic Intervention (SSW).The object of the project is the construction of a photovoltaic installation with a power of 300.16 kW and the heat pumps with a power of 60.10 kW.The electrical energy in the form of direct current produced by photovoltaic cells will be transformed by the inverter by the inverter on the alternating current. STAGES OF PROJECT IMPLEMENTATION: 1.Preparation of project documentation including: map for design purposes, design and tender documentation, feasibility study (IV-V 2016r); 2.Construction of photovoltaic installation – construction and installation works, including: Preparation of the site for construction, support structure for panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation; Fence of the site term – III-IX 2017; 3.Installation of heat pumps, including: installation of heat pumps; exchange of radiators term:III-IX 6/44 2017r. 4.Investment supervision and project promotion, including: investor supervision, costs of information and promotion (purchase and installation of information and commemorative boards) deadline:III-IX 2017 The project will be carried out by the Municipality of Płota, which will simultaneously manage the project. The project manager, currently acting as Head of the Department of Economic Development and Local Government Investments, will be directly involved in the implementation of the project. Other members of the project management team: Sp.ds. settlement and promotion of the project and Sp. for public procurement.The accounting service of the project will be carried out by the Treasury of the Municipality who cooperates (English)
Property / summary: The project will be implemented in the area of Strategic Intervention (SSW).The object of the project is the construction of a photovoltaic installation with a power of 300.16 kW and the heat pumps with a power of 60.10 kW.The electrical energy in the form of direct current produced by photovoltaic cells will be transformed by the inverter by the inverter on the alternating current. STAGES OF PROJECT IMPLEMENTATION: 1.Preparation of project documentation including: map for design purposes, design and tender documentation, feasibility study (IV-V 2016r); 2.Construction of photovoltaic installation – construction and installation works, including: Preparation of the site for construction, support structure for panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation; Fence of the site term – III-IX 2017; 3.Installation of heat pumps, including: installation of heat pumps; exchange of radiators term:III-IX 6/44 2017r. 4.Investment supervision and project promotion, including: investor supervision, costs of information and promotion (purchase and installation of information and commemorative boards) deadline:III-IX 2017 The project will be carried out by the Municipality of Płota, which will simultaneously manage the project. The project manager, currently acting as Head of the Department of Economic Development and Local Government Investments, will be directly involved in the implementation of the project. Other members of the project management team: Sp.ds. settlement and promotion of the project and Sp. for public procurement.The accounting service of the project will be carried out by the Treasury of the Municipality who cooperates (English) / rank
 
Normal rank
Property / summary: The project will be implemented in the area of Strategic Intervention (SSW).The object of the project is the construction of a photovoltaic installation with a power of 300.16 kW and the heat pumps with a power of 60.10 kW.The electrical energy in the form of direct current produced by photovoltaic cells will be transformed by the inverter by the inverter on the alternating current. STAGES OF PROJECT IMPLEMENTATION: 1.Preparation of project documentation including: map for design purposes, design and tender documentation, feasibility study (IV-V 2016r); 2.Construction of photovoltaic installation – construction and installation works, including: Preparation of the site for construction, support structure for panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation; Fence of the site term – III-IX 2017; 3.Installation of heat pumps, including: installation of heat pumps; exchange of radiators term:III-IX 6/44 2017r. 4.Investment supervision and project promotion, including: investor supervision, costs of information and promotion (purchase and installation of information and commemorative boards) deadline:III-IX 2017 The project will be carried out by the Municipality of Płota, which will simultaneously manage the project. The project manager, currently acting as Head of the Department of Economic Development and Local Government Investments, will be directly involved in the implementation of the project. Other members of the project management team: Sp.ds. settlement and promotion of the project and Sp. for public procurement.The accounting service of the project will be carried out by the Treasury of the Municipality who cooperates (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary: The project will be implemented in the area of Strategic Intervention (SSW).The object of the project is the construction of a photovoltaic installation with a power of 300.16 kW and the heat pumps with a power of 60.10 kW.The electrical energy in the form of direct current produced by photovoltaic cells will be transformed by the inverter by the inverter on the alternating current. STAGES OF PROJECT IMPLEMENTATION: 1.Preparation of project documentation including: map for design purposes, design and tender documentation, feasibility study (IV-V 2016r); 2.Construction of photovoltaic installation – construction and installation works, including: Preparation of the site for construction, support structure for panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation; Fence of the site term – III-IX 2017; 3.Installation of heat pumps, including: installation of heat pumps; exchange of radiators term:III-IX 6/44 2017r. 4.Investment supervision and project promotion, including: investor supervision, costs of information and promotion (purchase and installation of information and commemorative boards) deadline:III-IX 2017 The project will be carried out by the Municipality of Płota, which will simultaneously manage the project. The project manager, currently acting as Head of the Department of Economic Development and Local Government Investments, will be directly involved in the implementation of the project. Other members of the project management team: Sp.ds. settlement and promotion of the project and Sp. for public procurement.The accounting service of the project will be carried out by the Treasury of the Municipality who cooperates (English) / qualifier
 
readability score: 0.5257713372285575
Amount0.5257713372285575
Unit1
Property / summary
 
Le projet est situé à Płoty, rue Koszalińska, dans le secteur de la station d’épuration des eaux usées.Le projet sera mis en œuvre dans le domaine de l’intervention stratégique (SSW). Le projet a pour objet la construction d’une installation photovoltaïque d’une puissance de 300,16 kW et de pompes à chaleur d’une puissance de 60,10 kW.L’énergie électrique sous forme de courant continu produite par des cellules photovoltaïques sera convertie par des onduleurs en courant alternatif avec une tension de 400 V, puis au moyen d’un réseau de transformateurs vers le réseau électrique de la requérante. ÉTAPES DE LA MISE EN ŒUVRE DU PROJET: 1.Préparation de la documentation du projet, y compris: carte à des fins de conception, documentation de projet, étude de faisabilité (IV-V 2016); 2.Construction d’une installation photovoltaïque — travaux de construction et d’installation, y compris: Préparation du chantier pour la construction, Structure de support pour panneaux; Modules et onduleurs; Câblage; Appareillage de commutation et protection électrique; Telemechanika et sécurité; Mise à la terre et installation compensatoire; Date de clôture du site — III-IX 2017; 3.Installation des pompes à chaleur, y compris: installation de pompes à chaleur; remplacement du terme des radiateurs:III-IX 6/44 2017r. 4.La supervision des investisseurs et la promotion de projets, y compris: frais de supervision des investisseurs, d’information et de promotion (achat et assemblage de conseils d’information et de commémoration) date: III-IX 2017r. Le projet sera mis en œuvre par la municipalité de Płoty, qui gérera simultanément le projet. Le projet sera mis en œuvre directement par le gestionnaire de projet, actuellement chef du département du développement économique et des investissements des administrations locales. Autres membres de l’équipe de gestion du projet: Sp.ds. règlement et promotion du projet et de la Public Procurement Sp. (French)
Property / summary: Le projet est situé à Płoty, rue Koszalińska, dans le secteur de la station d’épuration des eaux usées.Le projet sera mis en œuvre dans le domaine de l’intervention stratégique (SSW). Le projet a pour objet la construction d’une installation photovoltaïque d’une puissance de 300,16 kW et de pompes à chaleur d’une puissance de 60,10 kW.L’énergie électrique sous forme de courant continu produite par des cellules photovoltaïques sera convertie par des onduleurs en courant alternatif avec une tension de 400 V, puis au moyen d’un réseau de transformateurs vers le réseau électrique de la requérante. ÉTAPES DE LA MISE EN ŒUVRE DU PROJET: 1.Préparation de la documentation du projet, y compris: carte à des fins de conception, documentation de projet, étude de faisabilité (IV-V 2016); 2.Construction d’une installation photovoltaïque — travaux de construction et d’installation, y compris: Préparation du chantier pour la construction, Structure de support pour panneaux; Modules et onduleurs; Câblage; Appareillage de commutation et protection électrique; Telemechanika et sécurité; Mise à la terre et installation compensatoire; Date de clôture du site — III-IX 2017; 3.Installation des pompes à chaleur, y compris: installation de pompes à chaleur; remplacement du terme des radiateurs:III-IX 6/44 2017r. 4.La supervision des investisseurs et la promotion de projets, y compris: frais de supervision des investisseurs, d’information et de promotion (achat et assemblage de conseils d’information et de commémoration) date: III-IX 2017r. Le projet sera mis en œuvre par la municipalité de Płoty, qui gérera simultanément le projet. Le projet sera mis en œuvre directement par le gestionnaire de projet, actuellement chef du département du développement économique et des investissements des administrations locales. Autres membres de l’équipe de gestion du projet: Sp.ds. règlement et promotion du projet et de la Public Procurement Sp. (French) / rank
 
Normal rank
Property / summary: Le projet est situé à Płoty, rue Koszalińska, dans le secteur de la station d’épuration des eaux usées.Le projet sera mis en œuvre dans le domaine de l’intervention stratégique (SSW). Le projet a pour objet la construction d’une installation photovoltaïque d’une puissance de 300,16 kW et de pompes à chaleur d’une puissance de 60,10 kW.L’énergie électrique sous forme de courant continu produite par des cellules photovoltaïques sera convertie par des onduleurs en courant alternatif avec une tension de 400 V, puis au moyen d’un réseau de transformateurs vers le réseau électrique de la requérante. ÉTAPES DE LA MISE EN ŒUVRE DU PROJET: 1.Préparation de la documentation du projet, y compris: carte à des fins de conception, documentation de projet, étude de faisabilité (IV-V 2016); 2.Construction d’une installation photovoltaïque — travaux de construction et d’installation, y compris: Préparation du chantier pour la construction, Structure de support pour panneaux; Modules et onduleurs; Câblage; Appareillage de commutation et protection électrique; Telemechanika et sécurité; Mise à la terre et installation compensatoire; Date de clôture du site — III-IX 2017; 3.Installation des pompes à chaleur, y compris: installation de pompes à chaleur; remplacement du terme des radiateurs:III-IX 6/44 2017r. 4.La supervision des investisseurs et la promotion de projets, y compris: frais de supervision des investisseurs, d’information et de promotion (achat et assemblage de conseils d’information et de commémoration) date: III-IX 2017r. Le projet sera mis en œuvre par la municipalité de Płoty, qui gérera simultanément le projet. Le projet sera mis en œuvre directement par le gestionnaire de projet, actuellement chef du département du développement économique et des investissements des administrations locales. Autres membres de l’équipe de gestion du projet: Sp.ds. règlement et promotion du projet et de la Public Procurement Sp. (French) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Das Projekt befindet sich in Płoty, in der Straße Koszalińska, im Bereich der Abwasserbehandlungsanlage.Das Projekt wird im Bereich Strategische Intervention (SSW) durchgeführt.Ziel des Projekts ist der Bau einer Photovoltaikanlage mit einer Leistung von 300,16 kW und Wärmepumpen mit einer Leistung von 60,10 kW.Die elektrische Energie in Form von Gleichstrom aus Photovoltaik-Zellen wird von Wechselrichtern in Wechselstrom mit einer Spannung von 400 V, dann über ein Transformatornetz zum Stromnetz des Antragstellers umgewandelt. PHASEN DER PROJEKTDURCHFÜHRUNG: 1. Vorbereitung der Projektdokumentation einschließlich: Karte für Planungszwecke, Projektdokumentation, Machbarkeitsstudie (IV-V 2016); 2.Bau einer Photovoltaikanlage – Bau- und Installationsarbeiten, einschließlich: Vorbereitung der Baustelle für den Bau, Stützstruktur für Paneele; Module und Wechselrichter; Verdrahtung; Schaltanlagen und elektrischer Schutz; Telemechanika und Sicherheit; Erdungs- und Ausgleichsanlagen; Standort Zaun Datum – III-IX 2017; 3. Installation von Wärmepumpen, einschließlich: Installation von Wärmepumpen; Ersatz des Heizkörperbegriffs:III-IX 6/44 2017r. 4.Investor-Überwachung und Projektförderung, einschließlich: Anlegeraufsicht, Informations- und Werbekosten (Kauf und Montage von Informations- und Gedenktafeln) Datum: III-IX 2017r. Das Projekt wird von der Gemeinde Płoty durchgeführt, die das Projekt gleichzeitig verwaltet. Das Projekt wird direkt vom Projektmanager durchgeführt, der derzeit als Leiter der Abteilung für wirtschaftliche Entwicklung und Investitionen der lokalen Gebietskörperschaften fungiert. Weitere Mitglieder des Projektmanagement-Teams: Sp.ds. Abwicklung und Förderung des Projekts und der Public Procurement Sp. (German)
Property / summary: Das Projekt befindet sich in Płoty, in der Straße Koszalińska, im Bereich der Abwasserbehandlungsanlage.Das Projekt wird im Bereich Strategische Intervention (SSW) durchgeführt.Ziel des Projekts ist der Bau einer Photovoltaikanlage mit einer Leistung von 300,16 kW und Wärmepumpen mit einer Leistung von 60,10 kW.Die elektrische Energie in Form von Gleichstrom aus Photovoltaik-Zellen wird von Wechselrichtern in Wechselstrom mit einer Spannung von 400 V, dann über ein Transformatornetz zum Stromnetz des Antragstellers umgewandelt. PHASEN DER PROJEKTDURCHFÜHRUNG: 1. Vorbereitung der Projektdokumentation einschließlich: Karte für Planungszwecke, Projektdokumentation, Machbarkeitsstudie (IV-V 2016); 2.Bau einer Photovoltaikanlage – Bau- und Installationsarbeiten, einschließlich: Vorbereitung der Baustelle für den Bau, Stützstruktur für Paneele; Module und Wechselrichter; Verdrahtung; Schaltanlagen und elektrischer Schutz; Telemechanika und Sicherheit; Erdungs- und Ausgleichsanlagen; Standort Zaun Datum – III-IX 2017; 3. Installation von Wärmepumpen, einschließlich: Installation von Wärmepumpen; Ersatz des Heizkörperbegriffs:III-IX 6/44 2017r. 4.Investor-Überwachung und Projektförderung, einschließlich: Anlegeraufsicht, Informations- und Werbekosten (Kauf und Montage von Informations- und Gedenktafeln) Datum: III-IX 2017r. Das Projekt wird von der Gemeinde Płoty durchgeführt, die das Projekt gleichzeitig verwaltet. Das Projekt wird direkt vom Projektmanager durchgeführt, der derzeit als Leiter der Abteilung für wirtschaftliche Entwicklung und Investitionen der lokalen Gebietskörperschaften fungiert. Weitere Mitglieder des Projektmanagement-Teams: Sp.ds. Abwicklung und Förderung des Projekts und der Public Procurement Sp. (German) / rank
 
Normal rank
Property / summary: Das Projekt befindet sich in Płoty, in der Straße Koszalińska, im Bereich der Abwasserbehandlungsanlage.Das Projekt wird im Bereich Strategische Intervention (SSW) durchgeführt.Ziel des Projekts ist der Bau einer Photovoltaikanlage mit einer Leistung von 300,16 kW und Wärmepumpen mit einer Leistung von 60,10 kW.Die elektrische Energie in Form von Gleichstrom aus Photovoltaik-Zellen wird von Wechselrichtern in Wechselstrom mit einer Spannung von 400 V, dann über ein Transformatornetz zum Stromnetz des Antragstellers umgewandelt. PHASEN DER PROJEKTDURCHFÜHRUNG: 1. Vorbereitung der Projektdokumentation einschließlich: Karte für Planungszwecke, Projektdokumentation, Machbarkeitsstudie (IV-V 2016); 2.Bau einer Photovoltaikanlage – Bau- und Installationsarbeiten, einschließlich: Vorbereitung der Baustelle für den Bau, Stützstruktur für Paneele; Module und Wechselrichter; Verdrahtung; Schaltanlagen und elektrischer Schutz; Telemechanika und Sicherheit; Erdungs- und Ausgleichsanlagen; Standort Zaun Datum – III-IX 2017; 3. Installation von Wärmepumpen, einschließlich: Installation von Wärmepumpen; Ersatz des Heizkörperbegriffs:III-IX 6/44 2017r. 4.Investor-Überwachung und Projektförderung, einschließlich: Anlegeraufsicht, Informations- und Werbekosten (Kauf und Montage von Informations- und Gedenktafeln) Datum: III-IX 2017r. Das Projekt wird von der Gemeinde Płoty durchgeführt, die das Projekt gleichzeitig verwaltet. Das Projekt wird direkt vom Projektmanager durchgeführt, der derzeit als Leiter der Abteilung für wirtschaftliche Entwicklung und Investitionen der lokalen Gebietskörperschaften fungiert. Weitere Mitglieder des Projektmanagement-Teams: Sp.ds. Abwicklung und Förderung des Projekts und der Public Procurement Sp. (German) / qualifier
 
point in time: 13 December 2021
Timestamp+2021-12-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Het project bevindt zich in Płoty, aan de straat Koszalińska, op het gebied van afvalwaterzuiveringsinstallatie.Het project zal worden uitgevoerd op het gebied van Strategische Interventie (SSW).Het doel van het project is de bouw van een fotovoltaïsche installatie met een vermogen van 300,16 kW en warmtepompen met een vermogen van 60,10 kW.De elektrische energie in de vorm van gelijkstroom geproduceerd door fotovoltaïsche cellen zal door omvormers worden omgezet in wisselstroom met een spanning van 400V, vervolgens door middel van een transformatornetwerk naar het elektriciteitsnetwerk van verzoekster. FASEN VAN DE UITVOERING VAN HET PROJECT: 1.Voorbereiding van projectdocumentatie met inbegrip van: kaart voor ontwerpdoeleinden, projectdocumentatie, haalbaarheidsstudie (IV-V 2016); 2.Bouw van een fotovoltaïsche installatie — bouw- en installatiewerkzaamheden, waaronder: Voorbereiding van de bouwplaats, Steunstructuur voor panelen; Modules en omvormers; Bedrading; Schakelinrichtingen en elektrische bescherming; Telemechanika en beveiliging; Aardings- en compenserende installatie; Site hekdatum — III-IX 2017; 3.Installation van warmtepompen, met inbegrip van: installatie van warmtepompen; vervanging van radiatoren term:III-IX 6/44 2017r. 4.Investor supervisie en project promotie, met inbegrip van: beleggerstoezicht, informatie- en promotiekosten (aankoop en montage van informatie- en herdenkingsborden) datum: III-IX 2017r. Het project zal worden uitgevoerd door de gemeente Płoty, die het project tegelijkertijd zal beheren. Het project zal rechtstreeks worden uitgevoerd door de projectmanager, die momenteel optreedt als hoofd van de afdeling Economische Ontwikkeling en Investeringen van lokale overheden. Andere leden van het projectmanagementteam: Sp.ds. afwikkeling en promotie van het project en de overheidsopdrachten Sp. (Dutch)
Property / summary: Het project bevindt zich in Płoty, aan de straat Koszalińska, op het gebied van afvalwaterzuiveringsinstallatie.Het project zal worden uitgevoerd op het gebied van Strategische Interventie (SSW).Het doel van het project is de bouw van een fotovoltaïsche installatie met een vermogen van 300,16 kW en warmtepompen met een vermogen van 60,10 kW.De elektrische energie in de vorm van gelijkstroom geproduceerd door fotovoltaïsche cellen zal door omvormers worden omgezet in wisselstroom met een spanning van 400V, vervolgens door middel van een transformatornetwerk naar het elektriciteitsnetwerk van verzoekster. FASEN VAN DE UITVOERING VAN HET PROJECT: 1.Voorbereiding van projectdocumentatie met inbegrip van: kaart voor ontwerpdoeleinden, projectdocumentatie, haalbaarheidsstudie (IV-V 2016); 2.Bouw van een fotovoltaïsche installatie — bouw- en installatiewerkzaamheden, waaronder: Voorbereiding van de bouwplaats, Steunstructuur voor panelen; Modules en omvormers; Bedrading; Schakelinrichtingen en elektrische bescherming; Telemechanika en beveiliging; Aardings- en compenserende installatie; Site hekdatum — III-IX 2017; 3.Installation van warmtepompen, met inbegrip van: installatie van warmtepompen; vervanging van radiatoren term:III-IX 6/44 2017r. 4.Investor supervisie en project promotie, met inbegrip van: beleggerstoezicht, informatie- en promotiekosten (aankoop en montage van informatie- en herdenkingsborden) datum: III-IX 2017r. Het project zal worden uitgevoerd door de gemeente Płoty, die het project tegelijkertijd zal beheren. Het project zal rechtstreeks worden uitgevoerd door de projectmanager, die momenteel optreedt als hoofd van de afdeling Economische Ontwikkeling en Investeringen van lokale overheden. Andere leden van het projectmanagementteam: Sp.ds. afwikkeling en promotie van het project en de overheidsopdrachten Sp. (Dutch) / rank
 
Normal rank
Property / summary: Het project bevindt zich in Płoty, aan de straat Koszalińska, op het gebied van afvalwaterzuiveringsinstallatie.Het project zal worden uitgevoerd op het gebied van Strategische Interventie (SSW).Het doel van het project is de bouw van een fotovoltaïsche installatie met een vermogen van 300,16 kW en warmtepompen met een vermogen van 60,10 kW.De elektrische energie in de vorm van gelijkstroom geproduceerd door fotovoltaïsche cellen zal door omvormers worden omgezet in wisselstroom met een spanning van 400V, vervolgens door middel van een transformatornetwerk naar het elektriciteitsnetwerk van verzoekster. FASEN VAN DE UITVOERING VAN HET PROJECT: 1.Voorbereiding van projectdocumentatie met inbegrip van: kaart voor ontwerpdoeleinden, projectdocumentatie, haalbaarheidsstudie (IV-V 2016); 2.Bouw van een fotovoltaïsche installatie — bouw- en installatiewerkzaamheden, waaronder: Voorbereiding van de bouwplaats, Steunstructuur voor panelen; Modules en omvormers; Bedrading; Schakelinrichtingen en elektrische bescherming; Telemechanika en beveiliging; Aardings- en compenserende installatie; Site hekdatum — III-IX 2017; 3.Installation van warmtepompen, met inbegrip van: installatie van warmtepompen; vervanging van radiatoren term:III-IX 6/44 2017r. 4.Investor supervisie en project promotie, met inbegrip van: beleggerstoezicht, informatie- en promotiekosten (aankoop en montage van informatie- en herdenkingsborden) datum: III-IX 2017r. Het project zal worden uitgevoerd door de gemeente Płoty, die het project tegelijkertijd zal beheren. Het project zal rechtstreeks worden uitgevoerd door de projectmanager, die momenteel optreedt als hoofd van de afdeling Economische Ontwikkeling en Investeringen van lokale overheden. Andere leden van het projectmanagementteam: Sp.ds. afwikkeling en promotie van het project en de overheidsopdrachten Sp. (Dutch) / qualifier
 
point in time: 17 December 2021
Timestamp+2021-12-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Il progetto si trova a Płoty, in via Koszalińska, nell'area dell'impianto di trattamento delle acque reflue.Il progetto sarà attuato nell'area di intervento strategico (SSW).L'obiettivo del progetto è la costruzione di un impianto fotovoltaico con una potenza di 300,16 kW e pompe di calore con una potenza di 60,10 kW.L'energia elettrica sotto forma di corrente continua prodotta da celle fotovoltaiche sarà convertita da inverter in corrente alternata con una tensione di 400V, quindi mediante una rete di trasformatori alla rete elettrica del richiedente. FASI DI ATTUAZIONE DEL PROGETTO: 1.Preparazione della documentazione del progetto, tra cui: mappa per finalità progettuali, documentazione progettuale, studio di fattibilità (IV-V 2016); 2.Costruzione di un impianto fotovoltaico — lavori di costruzione e installazione, tra cui: Preparazione del cantiere per la costruzione, Struttura di supporto per pannelli; Moduli e inverter; Cablaggio; Quadri elettrici e protezione elettrica; Telemechanika e sicurezza; Messa a terra e installazione compensativa; Data di recinzione del sito — III-IX 2017; 3.Installazione di pompe di calore, tra cui: installazione di pompe di calore; sostituzione dei radiatori termine:III-IX 6/44 2017r. Supervisione 4.Investor e promozione del progetto, tra cui: supervisione degli investitori, costi di informazione e promozione (acquisto e assemblaggio di informazioni e commissioni commemorative) data: III-IX 2017r. Il progetto sarà attuato dal Comune di Płoty, che contemporaneamente gestirà il progetto. Il progetto sarà attuato direttamente dal Project Manager, attualmente in qualità di Responsabile del Dipartimento per lo Sviluppo Economico e gli Investimenti Locali. Altri membri del team di gestione del progetto: Sp.ds. liquidazione e promozione del progetto e del Public Procurement Sp. (Italian)
Property / summary: Il progetto si trova a Płoty, in via Koszalińska, nell'area dell'impianto di trattamento delle acque reflue.Il progetto sarà attuato nell'area di intervento strategico (SSW).L'obiettivo del progetto è la costruzione di un impianto fotovoltaico con una potenza di 300,16 kW e pompe di calore con una potenza di 60,10 kW.L'energia elettrica sotto forma di corrente continua prodotta da celle fotovoltaiche sarà convertita da inverter in corrente alternata con una tensione di 400V, quindi mediante una rete di trasformatori alla rete elettrica del richiedente. FASI DI ATTUAZIONE DEL PROGETTO: 1.Preparazione della documentazione del progetto, tra cui: mappa per finalità progettuali, documentazione progettuale, studio di fattibilità (IV-V 2016); 2.Costruzione di un impianto fotovoltaico — lavori di costruzione e installazione, tra cui: Preparazione del cantiere per la costruzione, Struttura di supporto per pannelli; Moduli e inverter; Cablaggio; Quadri elettrici e protezione elettrica; Telemechanika e sicurezza; Messa a terra e installazione compensativa; Data di recinzione del sito — III-IX 2017; 3.Installazione di pompe di calore, tra cui: installazione di pompe di calore; sostituzione dei radiatori termine:III-IX 6/44 2017r. Supervisione 4.Investor e promozione del progetto, tra cui: supervisione degli investitori, costi di informazione e promozione (acquisto e assemblaggio di informazioni e commissioni commemorative) data: III-IX 2017r. Il progetto sarà attuato dal Comune di Płoty, che contemporaneamente gestirà il progetto. Il progetto sarà attuato direttamente dal Project Manager, attualmente in qualità di Responsabile del Dipartimento per lo Sviluppo Economico e gli Investimenti Locali. Altri membri del team di gestione del progetto: Sp.ds. liquidazione e promozione del progetto e del Public Procurement Sp. (Italian) / rank
 
Normal rank
Property / summary: Il progetto si trova a Płoty, in via Koszalińska, nell'area dell'impianto di trattamento delle acque reflue.Il progetto sarà attuato nell'area di intervento strategico (SSW).L'obiettivo del progetto è la costruzione di un impianto fotovoltaico con una potenza di 300,16 kW e pompe di calore con una potenza di 60,10 kW.L'energia elettrica sotto forma di corrente continua prodotta da celle fotovoltaiche sarà convertita da inverter in corrente alternata con una tensione di 400V, quindi mediante una rete di trasformatori alla rete elettrica del richiedente. FASI DI ATTUAZIONE DEL PROGETTO: 1.Preparazione della documentazione del progetto, tra cui: mappa per finalità progettuali, documentazione progettuale, studio di fattibilità (IV-V 2016); 2.Costruzione di un impianto fotovoltaico — lavori di costruzione e installazione, tra cui: Preparazione del cantiere per la costruzione, Struttura di supporto per pannelli; Moduli e inverter; Cablaggio; Quadri elettrici e protezione elettrica; Telemechanika e sicurezza; Messa a terra e installazione compensativa; Data di recinzione del sito — III-IX 2017; 3.Installazione di pompe di calore, tra cui: installazione di pompe di calore; sostituzione dei radiatori termine:III-IX 6/44 2017r. Supervisione 4.Investor e promozione del progetto, tra cui: supervisione degli investitori, costi di informazione e promozione (acquisto e assemblaggio di informazioni e commissioni commemorative) data: III-IX 2017r. Il progetto sarà attuato dal Comune di Płoty, che contemporaneamente gestirà il progetto. Il progetto sarà attuato direttamente dal Project Manager, attualmente in qualità di Responsabile del Dipartimento per lo Sviluppo Economico e gli Investimenti Locali. Altri membri del team di gestione del progetto: Sp.ds. liquidazione e promozione del progetto e del Public Procurement Sp. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
El proyecto se encuentra en Płoty, en la calle Koszalińska, en el área de la planta de tratamiento de aguas residuales.El proyecto se implementará en el área de Intervención Estratégica (SSW).El objetivo del proyecto es la construcción de una instalación fotovoltaica con una potencia de 300,16 kW y bombas de calor con una potencia de 60,10 kW. La energía eléctrica en forma de corriente directa producida por las células fotovoltaicas se convertirá por inversores en corriente alterna con una tensión de 400 V, luego mediante una red de transformadores a la red eléctrica del solicitante. ETAPAS DE EJECUCIÓN DEL PROYECTO: 1.Preparación de la documentación del proyecto, que incluye: mapa para fines de diseño, documentación del proyecto, estudio de viabilidad (IV-V 2016); 2.Construcción de una instalación fotovoltaica — obras de construcción e instalación, incluyendo: Preparación del sitio para la construcción, Estructura de apoyo para paneles; Módulos e inversores; Cableado; Equipos de conmutación y protección eléctrica; Telemechanika y seguridad; Puesta a tierra e instalación compensatoria; Fecha de la valla del sitio — III-IX 2017; 3. Instalación de bombas de calor, incluyendo: instalación de bombas de calor; sustitución del término de los radiadores:III-IX 6/44 2017r. 4.Inversor supervisión y promoción de proyectos, incluyendo: supervisión del inversor, información y costes de promoción (compra y ensamblaje de información y juntas conmemorativas) fecha: III-IX 2017r. El proyecto será ejecutado por el Municipio de Płoty, que gestionará simultáneamente el proyecto. El proyecto será ejecutado directamente por el Gerente del Proyecto, que actualmente actúa como Jefe del Departamento de Desarrollo Económico e Inversiones de Gobierno Local. Otros miembros del equipo de gestión del proyecto: Sp.ds. liquidación y promoción del proyecto y de la contratación pública Sp. (Spanish)
Property / summary: El proyecto se encuentra en Płoty, en la calle Koszalińska, en el área de la planta de tratamiento de aguas residuales.El proyecto se implementará en el área de Intervención Estratégica (SSW).El objetivo del proyecto es la construcción de una instalación fotovoltaica con una potencia de 300,16 kW y bombas de calor con una potencia de 60,10 kW. La energía eléctrica en forma de corriente directa producida por las células fotovoltaicas se convertirá por inversores en corriente alterna con una tensión de 400 V, luego mediante una red de transformadores a la red eléctrica del solicitante. ETAPAS DE EJECUCIÓN DEL PROYECTO: 1.Preparación de la documentación del proyecto, que incluye: mapa para fines de diseño, documentación del proyecto, estudio de viabilidad (IV-V 2016); 2.Construcción de una instalación fotovoltaica — obras de construcción e instalación, incluyendo: Preparación del sitio para la construcción, Estructura de apoyo para paneles; Módulos e inversores; Cableado; Equipos de conmutación y protección eléctrica; Telemechanika y seguridad; Puesta a tierra e instalación compensatoria; Fecha de la valla del sitio — III-IX 2017; 3. Instalación de bombas de calor, incluyendo: instalación de bombas de calor; sustitución del término de los radiadores:III-IX 6/44 2017r. 4.Inversor supervisión y promoción de proyectos, incluyendo: supervisión del inversor, información y costes de promoción (compra y ensamblaje de información y juntas conmemorativas) fecha: III-IX 2017r. El proyecto será ejecutado por el Municipio de Płoty, que gestionará simultáneamente el proyecto. El proyecto será ejecutado directamente por el Gerente del Proyecto, que actualmente actúa como Jefe del Departamento de Desarrollo Económico e Inversiones de Gobierno Local. Otros miembros del equipo de gestión del proyecto: Sp.ds. liquidación y promoción del proyecto y de la contratación pública Sp. (Spanish) / rank
 
Normal rank
Property / summary: El proyecto se encuentra en Płoty, en la calle Koszalińska, en el área de la planta de tratamiento de aguas residuales.El proyecto se implementará en el área de Intervención Estratégica (SSW).El objetivo del proyecto es la construcción de una instalación fotovoltaica con una potencia de 300,16 kW y bombas de calor con una potencia de 60,10 kW. La energía eléctrica en forma de corriente directa producida por las células fotovoltaicas se convertirá por inversores en corriente alterna con una tensión de 400 V, luego mediante una red de transformadores a la red eléctrica del solicitante. ETAPAS DE EJECUCIÓN DEL PROYECTO: 1.Preparación de la documentación del proyecto, que incluye: mapa para fines de diseño, documentación del proyecto, estudio de viabilidad (IV-V 2016); 2.Construcción de una instalación fotovoltaica — obras de construcción e instalación, incluyendo: Preparación del sitio para la construcción, Estructura de apoyo para paneles; Módulos e inversores; Cableado; Equipos de conmutación y protección eléctrica; Telemechanika y seguridad; Puesta a tierra e instalación compensatoria; Fecha de la valla del sitio — III-IX 2017; 3. Instalación de bombas de calor, incluyendo: instalación de bombas de calor; sustitución del término de los radiadores:III-IX 6/44 2017r. 4.Inversor supervisión y promoción de proyectos, incluyendo: supervisión del inversor, información y costes de promoción (compra y ensamblaje de información y juntas conmemorativas) fecha: III-IX 2017r. El proyecto será ejecutado por el Municipio de Płoty, que gestionará simultáneamente el proyecto. El proyecto será ejecutado directamente por el Gerente del Proyecto, que actualmente actúa como Jefe del Departamento de Desarrollo Económico e Inversiones de Gobierno Local. Otros miembros del equipo de gestión del proyecto: Sp.ds. liquidación y promoción del proyecto y de la contratación pública Sp. (Spanish) / qualifier
 
point in time: 19 January 2022
Timestamp+2022-01-19T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projektet er beliggende i Płoty, på Koszalińska Street, i området spildevandsrensningsanlæg.Projektet vil blive gennemført inden for strategisk intervention (SSW).Formålet med projektet er opførelse af et solcelleanlæg med en effekt på 300,16 kW og varmepumper med en effekt på 60,10 kW.Den elektriske energi i form af direkte strøm produceret af solceller vil blive omdannet af omformere til vekselstrøm med en spænding på 400 V, derefter ved hjælp af et transformernetværk til ansøgerens elnet. FASER AF PROJEKTGENNEMFØRELSEN: 1.Udarbejdelse af projektdokumentation, herunder: kort til designformål, projektdokumentation, gennemførlighedsundersøgelse (IV-V 2016) 2.Opførelse af et solcelleanlæg — bygge- og anlægsarbejde, herunder: Forberedelse af byggepladsen, støttestruktur til paneler; Moduler og invertere; Ledninger; Koblingsudstyr og elektrisk beskyttelse; Telemechanika og sikkerhed Jordforbindelse og kompenserende installation Dato for indhegning af arealet — III-IX 2017; 3. Installation af varmepumper, herunder: installation af varmepumper; udskiftning af radiatorer sigt:III-IX 6/44 2017r. 4.Investortilsyn og projektfremme, herunder: udgifter til tilsyn med investorer, oplysningskampagner og salgsfremstød (køb og samling af informations- og erindringstavler) dato: III-IX 2017r. Projektet vil blive gennemført af kommunen Płoty, som samtidig skal forvalte projektet. Projektet vil blive gennemført direkte af projektlederen, der i øjeblikket fungerer som leder af Institut for Økonomisk Udvikling og Lokale Offentlige Investeringer. Andre medlemmer af projektledelsen: Sp.ds. afvikling og fremme af projektet og offentlige indkøb Sp. (Danish)
Property / summary: Projektet er beliggende i Płoty, på Koszalińska Street, i området spildevandsrensningsanlæg.Projektet vil blive gennemført inden for strategisk intervention (SSW).Formålet med projektet er opførelse af et solcelleanlæg med en effekt på 300,16 kW og varmepumper med en effekt på 60,10 kW.Den elektriske energi i form af direkte strøm produceret af solceller vil blive omdannet af omformere til vekselstrøm med en spænding på 400 V, derefter ved hjælp af et transformernetværk til ansøgerens elnet. FASER AF PROJEKTGENNEMFØRELSEN: 1.Udarbejdelse af projektdokumentation, herunder: kort til designformål, projektdokumentation, gennemførlighedsundersøgelse (IV-V 2016) 2.Opførelse af et solcelleanlæg — bygge- og anlægsarbejde, herunder: Forberedelse af byggepladsen, støttestruktur til paneler; Moduler og invertere; Ledninger; Koblingsudstyr og elektrisk beskyttelse; Telemechanika og sikkerhed Jordforbindelse og kompenserende installation Dato for indhegning af arealet — III-IX 2017; 3. Installation af varmepumper, herunder: installation af varmepumper; udskiftning af radiatorer sigt:III-IX 6/44 2017r. 4.Investortilsyn og projektfremme, herunder: udgifter til tilsyn med investorer, oplysningskampagner og salgsfremstød (køb og samling af informations- og erindringstavler) dato: III-IX 2017r. Projektet vil blive gennemført af kommunen Płoty, som samtidig skal forvalte projektet. Projektet vil blive gennemført direkte af projektlederen, der i øjeblikket fungerer som leder af Institut for Økonomisk Udvikling og Lokale Offentlige Investeringer. Andre medlemmer af projektledelsen: Sp.ds. afvikling og fremme af projektet og offentlige indkøb Sp. (Danish) / rank
 
Normal rank
Property / summary: Projektet er beliggende i Płoty, på Koszalińska Street, i området spildevandsrensningsanlæg.Projektet vil blive gennemført inden for strategisk intervention (SSW).Formålet med projektet er opførelse af et solcelleanlæg med en effekt på 300,16 kW og varmepumper med en effekt på 60,10 kW.Den elektriske energi i form af direkte strøm produceret af solceller vil blive omdannet af omformere til vekselstrøm med en spænding på 400 V, derefter ved hjælp af et transformernetværk til ansøgerens elnet. FASER AF PROJEKTGENNEMFØRELSEN: 1.Udarbejdelse af projektdokumentation, herunder: kort til designformål, projektdokumentation, gennemførlighedsundersøgelse (IV-V 2016) 2.Opførelse af et solcelleanlæg — bygge- og anlægsarbejde, herunder: Forberedelse af byggepladsen, støttestruktur til paneler; Moduler og invertere; Ledninger; Koblingsudstyr og elektrisk beskyttelse; Telemechanika og sikkerhed Jordforbindelse og kompenserende installation Dato for indhegning af arealet — III-IX 2017; 3. Installation af varmepumper, herunder: installation af varmepumper; udskiftning af radiatorer sigt:III-IX 6/44 2017r. 4.Investortilsyn og projektfremme, herunder: udgifter til tilsyn med investorer, oplysningskampagner og salgsfremstød (køb og samling af informations- og erindringstavler) dato: III-IX 2017r. Projektet vil blive gennemført af kommunen Płoty, som samtidig skal forvalte projektet. Projektet vil blive gennemført direkte af projektlederen, der i øjeblikket fungerer som leder af Institut for Økonomisk Udvikling og Lokale Offentlige Investeringer. Andre medlemmer af projektledelsen: Sp.ds. afvikling og fremme af projektet og offentlige indkøb Sp. (Danish) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Το έργο βρίσκεται στο Płoty, στην οδό Koszalińska, στην περιοχή του σταθμού επεξεργασίας λυμάτων.Το έργο θα υλοποιηθεί στον τομέα της Στρατηγικής Παρέμβασης (SSW).Στόχος του έργου είναι η κατασκευή φωτοβολταϊκής εγκατάστασης ισχύος 300,16 kW και αντλιών θερμότητας ισχύος 60,10 kW.Η ηλεκτρική ενέργεια υπό μορφή συνεχούς ρεύματος που παράγεται από φωτοβολταϊκές κυψέλες θα μετατραπεί από μετατροπείς σε εναλλασσόμενο ρεύμα με τάση 400V, στη συνέχεια μέσω δικτύου μετασχηματιστών στο δίκτυο ηλεκτρικής ενέργειας του αιτούντος. ΣΤΆΔΙΑ ΥΛΟΠΟΊΗΣΗΣ ΤΟΥ ΈΡΓΟΥ: 1.Προετοιμασία της τεκμηρίωσης του έργου που περιλαμβάνει: Χάρτης για σκοπούς σχεδιασμού, τεκμηρίωση του έργου, μελέτη σκοπιμότητας (IV-V 2016)· 2.Κατασκευή φωτοβολταϊκής εγκατάστασης — εργασίες κατασκευής και εγκατάστασης, συμπεριλαμβανομένων: Προετοιμασία του εργοταξίου για την κατασκευή, Δομή υποστήριξης για πάνελ? Δομοστοιχεία και μετατροπείς· Καλωδίωση; Εξοπλισμός μεταγωγής και ηλεκτρική προστασία· Telemechanika και ασφάλεια· Γείωση και αντισταθμιστική εγκατάσταση? Ημερομηνία περίφραξης τοποθεσίας — III-IX 2017; 3.Εγκατάσταση αντλιών θερμότητας, συμπεριλαμβανομένων: εγκατάσταση αντλιών θερμότητας· αντικατάσταση του όρου θερμαντικών σωμάτων:III-IX 6/44 2017r. 4. Εποπτεία επενδυτών και προώθηση έργων, συμπεριλαμβανομένων: τα έξοδα εποπτείας, ενημέρωσης και προώθησης των επενδυτών (αγορά και συγκέντρωση ενημερωτικών και αναμνηστικών συμβουλίων) ημερομηνία: III-IX 2017r. Το έργο θα υλοποιηθεί από τον Δήμο Płoty, ο οποίος θα διαχειρίζεται ταυτόχρονα το έργο. Το έργο θα υλοποιηθεί απευθείας από τον Υπεύθυνο Συντονιστή, ο οποίος επί του παρόντος ενεργεί ως Προϊστάμενος του Τμήματος Οικονομικής Ανάπτυξης και Επενδύσεων Τοπικής Αυτοδιοίκησης. Άλλα μέλη της ομάδας διαχείρισης του έργου: Sp.ds. διευθέτηση και προώθηση του έργου και της Δημόσιων Συμβάσεων Sp. (Greek)
Property / summary: Το έργο βρίσκεται στο Płoty, στην οδό Koszalińska, στην περιοχή του σταθμού επεξεργασίας λυμάτων.Το έργο θα υλοποιηθεί στον τομέα της Στρατηγικής Παρέμβασης (SSW).Στόχος του έργου είναι η κατασκευή φωτοβολταϊκής εγκατάστασης ισχύος 300,16 kW και αντλιών θερμότητας ισχύος 60,10 kW.Η ηλεκτρική ενέργεια υπό μορφή συνεχούς ρεύματος που παράγεται από φωτοβολταϊκές κυψέλες θα μετατραπεί από μετατροπείς σε εναλλασσόμενο ρεύμα με τάση 400V, στη συνέχεια μέσω δικτύου μετασχηματιστών στο δίκτυο ηλεκτρικής ενέργειας του αιτούντος. ΣΤΆΔΙΑ ΥΛΟΠΟΊΗΣΗΣ ΤΟΥ ΈΡΓΟΥ: 1.Προετοιμασία της τεκμηρίωσης του έργου που περιλαμβάνει: Χάρτης για σκοπούς σχεδιασμού, τεκμηρίωση του έργου, μελέτη σκοπιμότητας (IV-V 2016)· 2.Κατασκευή φωτοβολταϊκής εγκατάστασης — εργασίες κατασκευής και εγκατάστασης, συμπεριλαμβανομένων: Προετοιμασία του εργοταξίου για την κατασκευή, Δομή υποστήριξης για πάνελ? Δομοστοιχεία και μετατροπείς· Καλωδίωση; Εξοπλισμός μεταγωγής και ηλεκτρική προστασία· Telemechanika και ασφάλεια· Γείωση και αντισταθμιστική εγκατάσταση? Ημερομηνία περίφραξης τοποθεσίας — III-IX 2017; 3.Εγκατάσταση αντλιών θερμότητας, συμπεριλαμβανομένων: εγκατάσταση αντλιών θερμότητας· αντικατάσταση του όρου θερμαντικών σωμάτων:III-IX 6/44 2017r. 4. Εποπτεία επενδυτών και προώθηση έργων, συμπεριλαμβανομένων: τα έξοδα εποπτείας, ενημέρωσης και προώθησης των επενδυτών (αγορά και συγκέντρωση ενημερωτικών και αναμνηστικών συμβουλίων) ημερομηνία: III-IX 2017r. Το έργο θα υλοποιηθεί από τον Δήμο Płoty, ο οποίος θα διαχειρίζεται ταυτόχρονα το έργο. Το έργο θα υλοποιηθεί απευθείας από τον Υπεύθυνο Συντονιστή, ο οποίος επί του παρόντος ενεργεί ως Προϊστάμενος του Τμήματος Οικονομικής Ανάπτυξης και Επενδύσεων Τοπικής Αυτοδιοίκησης. Άλλα μέλη της ομάδας διαχείρισης του έργου: Sp.ds. διευθέτηση και προώθηση του έργου και της Δημόσιων Συμβάσεων Sp. (Greek) / rank
 
Normal rank
Property / summary: Το έργο βρίσκεται στο Płoty, στην οδό Koszalińska, στην περιοχή του σταθμού επεξεργασίας λυμάτων.Το έργο θα υλοποιηθεί στον τομέα της Στρατηγικής Παρέμβασης (SSW).Στόχος του έργου είναι η κατασκευή φωτοβολταϊκής εγκατάστασης ισχύος 300,16 kW και αντλιών θερμότητας ισχύος 60,10 kW.Η ηλεκτρική ενέργεια υπό μορφή συνεχούς ρεύματος που παράγεται από φωτοβολταϊκές κυψέλες θα μετατραπεί από μετατροπείς σε εναλλασσόμενο ρεύμα με τάση 400V, στη συνέχεια μέσω δικτύου μετασχηματιστών στο δίκτυο ηλεκτρικής ενέργειας του αιτούντος. ΣΤΆΔΙΑ ΥΛΟΠΟΊΗΣΗΣ ΤΟΥ ΈΡΓΟΥ: 1.Προετοιμασία της τεκμηρίωσης του έργου που περιλαμβάνει: Χάρτης για σκοπούς σχεδιασμού, τεκμηρίωση του έργου, μελέτη σκοπιμότητας (IV-V 2016)· 2.Κατασκευή φωτοβολταϊκής εγκατάστασης — εργασίες κατασκευής και εγκατάστασης, συμπεριλαμβανομένων: Προετοιμασία του εργοταξίου για την κατασκευή, Δομή υποστήριξης για πάνελ? Δομοστοιχεία και μετατροπείς· Καλωδίωση; Εξοπλισμός μεταγωγής και ηλεκτρική προστασία· Telemechanika και ασφάλεια· Γείωση και αντισταθμιστική εγκατάσταση? Ημερομηνία περίφραξης τοποθεσίας — III-IX 2017; 3.Εγκατάσταση αντλιών θερμότητας, συμπεριλαμβανομένων: εγκατάσταση αντλιών θερμότητας· αντικατάσταση του όρου θερμαντικών σωμάτων:III-IX 6/44 2017r. 4. Εποπτεία επενδυτών και προώθηση έργων, συμπεριλαμβανομένων: τα έξοδα εποπτείας, ενημέρωσης και προώθησης των επενδυτών (αγορά και συγκέντρωση ενημερωτικών και αναμνηστικών συμβουλίων) ημερομηνία: III-IX 2017r. Το έργο θα υλοποιηθεί από τον Δήμο Płoty, ο οποίος θα διαχειρίζεται ταυτόχρονα το έργο. Το έργο θα υλοποιηθεί απευθείας από τον Υπεύθυνο Συντονιστή, ο οποίος επί του παρόντος ενεργεί ως Προϊστάμενος του Τμήματος Οικονομικής Ανάπτυξης και Επενδύσεων Τοπικής Αυτοδιοίκησης. Άλλα μέλη της ομάδας διαχείρισης του έργου: Sp.ds. διευθέτηση και προώθηση του έργου και της Δημόσιων Συμβάσεων Sp. (Greek) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt se nalazi u Płotyu, u Koszalińskoj ulici, na području postrojenja za pročišćavanje otpadnih voda.Projekt će se provoditi na području Strateške intervencije (SSW). Cilj projekta je izgradnja fotonaponske instalacije snage 300,16 kW i dizalice topline snage 60,10 kW.Električna energija u obliku istosmjerne struje koju proizvode fotonaponske ćelije pretvarat će se pretvaračima u izmjeničnu struju napona od 400 V, a zatim pomoću mreže transformatora do tužiteljeve elektroenergetske mreže. FAZE PROVEDBE PROJEKTA: 1.Priprema projektne dokumentacije uključujući: karta za potrebe projektiranja, projektna dokumentacija, studija izvedivosti (IV-V 2016); 2.Izgradnja fotonaponske instalacije – građevinski i instalacijski radovi, uključujući: Priprema gradilišta, potporna struktura za ploče; Moduli i pretvarači; Ožičenje; Rasklopna postrojenja i električna zaštita; Telemechanika i sigurnost; Uzemljenje i kompenzacijska instalacija; Datum ograde lokacije – III.-IX. 2017.; 3.Ugradnja toplinskih crpki, uključujući: ugradnja toplinskih crpki; zamjena radijatora naziv: III-IX 6/44 2017r. 4.Nadzor ulagača i promicanje projekata, uključujući: nadzor ulagatelja, troškovi informiranja i promocije (kupnja i sastavljanje informacija i komemorativni odbori) datum: III – IX 2017r. Projekt će provoditi Općina Płoty, koja će istodobno upravljati projektom. Projekt će izravno provoditi voditelj projekta, koji trenutačno djeluje kao voditelj Odjela za gospodarski razvoj i ulaganja lokalne uprave. Ostali članovi tima za upravljanje projektima: Nagodba i promocija projekta i javne nabave Sp. (Croatian)
Property / summary: Projekt se nalazi u Płotyu, u Koszalińskoj ulici, na području postrojenja za pročišćavanje otpadnih voda.Projekt će se provoditi na području Strateške intervencije (SSW). Cilj projekta je izgradnja fotonaponske instalacije snage 300,16 kW i dizalice topline snage 60,10 kW.Električna energija u obliku istosmjerne struje koju proizvode fotonaponske ćelije pretvarat će se pretvaračima u izmjeničnu struju napona od 400 V, a zatim pomoću mreže transformatora do tužiteljeve elektroenergetske mreže. FAZE PROVEDBE PROJEKTA: 1.Priprema projektne dokumentacije uključujući: karta za potrebe projektiranja, projektna dokumentacija, studija izvedivosti (IV-V 2016); 2.Izgradnja fotonaponske instalacije – građevinski i instalacijski radovi, uključujući: Priprema gradilišta, potporna struktura za ploče; Moduli i pretvarači; Ožičenje; Rasklopna postrojenja i električna zaštita; Telemechanika i sigurnost; Uzemljenje i kompenzacijska instalacija; Datum ograde lokacije – III.-IX. 2017.; 3.Ugradnja toplinskih crpki, uključujući: ugradnja toplinskih crpki; zamjena radijatora naziv: III-IX 6/44 2017r. 4.Nadzor ulagača i promicanje projekata, uključujući: nadzor ulagatelja, troškovi informiranja i promocije (kupnja i sastavljanje informacija i komemorativni odbori) datum: III – IX 2017r. Projekt će provoditi Općina Płoty, koja će istodobno upravljati projektom. Projekt će izravno provoditi voditelj projekta, koji trenutačno djeluje kao voditelj Odjela za gospodarski razvoj i ulaganja lokalne uprave. Ostali članovi tima za upravljanje projektima: Nagodba i promocija projekta i javne nabave Sp. (Croatian) / rank
 
Normal rank
Property / summary: Projekt se nalazi u Płotyu, u Koszalińskoj ulici, na području postrojenja za pročišćavanje otpadnih voda.Projekt će se provoditi na području Strateške intervencije (SSW). Cilj projekta je izgradnja fotonaponske instalacije snage 300,16 kW i dizalice topline snage 60,10 kW.Električna energija u obliku istosmjerne struje koju proizvode fotonaponske ćelije pretvarat će se pretvaračima u izmjeničnu struju napona od 400 V, a zatim pomoću mreže transformatora do tužiteljeve elektroenergetske mreže. FAZE PROVEDBE PROJEKTA: 1.Priprema projektne dokumentacije uključujući: karta za potrebe projektiranja, projektna dokumentacija, studija izvedivosti (IV-V 2016); 2.Izgradnja fotonaponske instalacije – građevinski i instalacijski radovi, uključujući: Priprema gradilišta, potporna struktura za ploče; Moduli i pretvarači; Ožičenje; Rasklopna postrojenja i električna zaštita; Telemechanika i sigurnost; Uzemljenje i kompenzacijska instalacija; Datum ograde lokacije – III.-IX. 2017.; 3.Ugradnja toplinskih crpki, uključujući: ugradnja toplinskih crpki; zamjena radijatora naziv: III-IX 6/44 2017r. 4.Nadzor ulagača i promicanje projekata, uključujući: nadzor ulagatelja, troškovi informiranja i promocije (kupnja i sastavljanje informacija i komemorativni odbori) datum: III – IX 2017r. Projekt će provoditi Općina Płoty, koja će istodobno upravljati projektom. Projekt će izravno provoditi voditelj projekta, koji trenutačno djeluje kao voditelj Odjela za gospodarski razvoj i ulaganja lokalne uprave. Ostali članovi tima za upravljanje projektima: Nagodba i promocija projekta i javne nabave Sp. (Croatian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Proiectul este situat în Płoty, pe strada Koszalińska, în zona stației de epurare a apelor uzate.Proiectul va fi implementat în domeniul intervenției strategice (SSW). Obiectivul proiectului este construirea unei instalații fotovoltaice cu o putere de 300,16 kW și pompe de căldură cu o putere de 60,10 kW. Energia electrică sub formă de curent continuu produsă de celulele fotovoltaice va fi transformată prin invertoare în curent alternativ cu o tensiune de 400V, apoi prin intermediul unei rețele de transformatoare la rețeaua de energie electrică a solicitantului. ETAPELE DE IMPLEMENTARE A PROIECTULUI: 1.Pregătirea documentației proiectului, inclusiv: harta în scopuri de proiectare, documentația proiectului, studiul de fezabilitate (IV-V 2016); 2.Construirea unei instalații fotovoltaice – lucrări de construcție și instalare, inclusiv: Pregătirea șantierului pentru construcții, Structura suport pentru panouri; Module și invertoare; Cabluri; Dispozitive de comutație și protecție electrică; Telemechanika și securitate; Instalații de împământare și de compensare; Data gardului – III-IX 2017; 3.Instalarea pompelor de căldură, inclusiv: instalarea pompelor de căldură; termenul de înlocuire a radiatoarelor:III-IX 6/44 2017r. 4. Supravegherea investitorilor și promovarea proiectelor, inclusiv: costurile de supraveghere, informare și promovare a investitorilor (achiziționarea și asamblarea de informații și consilii comemorative) data: III-IX 2017r. Proiectul va fi implementat de municipalitatea Płoty, care va gestiona simultan proiectul. Proiectul va fi implementat direct de către managerul de proiect, în prezent în calitate de șef al Departamentului de Dezvoltare Economică și Investiții Guvernamentale Locale. Alți membri ai echipei de management de proiect: Soluționarea și promovarea proiectului și a Achizițiilor Publice Sp. (Romanian)
Property / summary: Proiectul este situat în Płoty, pe strada Koszalińska, în zona stației de epurare a apelor uzate.Proiectul va fi implementat în domeniul intervenției strategice (SSW). Obiectivul proiectului este construirea unei instalații fotovoltaice cu o putere de 300,16 kW și pompe de căldură cu o putere de 60,10 kW. Energia electrică sub formă de curent continuu produsă de celulele fotovoltaice va fi transformată prin invertoare în curent alternativ cu o tensiune de 400V, apoi prin intermediul unei rețele de transformatoare la rețeaua de energie electrică a solicitantului. ETAPELE DE IMPLEMENTARE A PROIECTULUI: 1.Pregătirea documentației proiectului, inclusiv: harta în scopuri de proiectare, documentația proiectului, studiul de fezabilitate (IV-V 2016); 2.Construirea unei instalații fotovoltaice – lucrări de construcție și instalare, inclusiv: Pregătirea șantierului pentru construcții, Structura suport pentru panouri; Module și invertoare; Cabluri; Dispozitive de comutație și protecție electrică; Telemechanika și securitate; Instalații de împământare și de compensare; Data gardului – III-IX 2017; 3.Instalarea pompelor de căldură, inclusiv: instalarea pompelor de căldură; termenul de înlocuire a radiatoarelor:III-IX 6/44 2017r. 4. Supravegherea investitorilor și promovarea proiectelor, inclusiv: costurile de supraveghere, informare și promovare a investitorilor (achiziționarea și asamblarea de informații și consilii comemorative) data: III-IX 2017r. Proiectul va fi implementat de municipalitatea Płoty, care va gestiona simultan proiectul. Proiectul va fi implementat direct de către managerul de proiect, în prezent în calitate de șef al Departamentului de Dezvoltare Economică și Investiții Guvernamentale Locale. Alți membri ai echipei de management de proiect: Soluționarea și promovarea proiectului și a Achizițiilor Publice Sp. (Romanian) / rank
 
Normal rank
Property / summary: Proiectul este situat în Płoty, pe strada Koszalińska, în zona stației de epurare a apelor uzate.Proiectul va fi implementat în domeniul intervenției strategice (SSW). Obiectivul proiectului este construirea unei instalații fotovoltaice cu o putere de 300,16 kW și pompe de căldură cu o putere de 60,10 kW. Energia electrică sub formă de curent continuu produsă de celulele fotovoltaice va fi transformată prin invertoare în curent alternativ cu o tensiune de 400V, apoi prin intermediul unei rețele de transformatoare la rețeaua de energie electrică a solicitantului. ETAPELE DE IMPLEMENTARE A PROIECTULUI: 1.Pregătirea documentației proiectului, inclusiv: harta în scopuri de proiectare, documentația proiectului, studiul de fezabilitate (IV-V 2016); 2.Construirea unei instalații fotovoltaice – lucrări de construcție și instalare, inclusiv: Pregătirea șantierului pentru construcții, Structura suport pentru panouri; Module și invertoare; Cabluri; Dispozitive de comutație și protecție electrică; Telemechanika și securitate; Instalații de împământare și de compensare; Data gardului – III-IX 2017; 3.Instalarea pompelor de căldură, inclusiv: instalarea pompelor de căldură; termenul de înlocuire a radiatoarelor:III-IX 6/44 2017r. 4. Supravegherea investitorilor și promovarea proiectelor, inclusiv: costurile de supraveghere, informare și promovare a investitorilor (achiziționarea și asamblarea de informații și consilii comemorative) data: III-IX 2017r. Proiectul va fi implementat de municipalitatea Płoty, care va gestiona simultan proiectul. Proiectul va fi implementat direct de către managerul de proiect, în prezent în calitate de șef al Departamentului de Dezvoltare Economică și Investiții Guvernamentale Locale. Alți membri ai echipei de management de proiect: Soluționarea și promovarea proiectului și a Achizițiilor Publice Sp. (Romanian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt sa nachádza v Płoty, na Koszalińskej ulici, v oblasti čistiarne odpadových vôd.Projekt bude realizovaný v oblasti strategickej intervencie (SSW). Cieľom projektu je výstavba fotovoltickej inštalácie s výkonom 300,16 kW a tepelných čerpadiel s výkonom 60,10 kW.Elektrická energia vo forme jednosmerného prúdu vyrábaného fotovoltaickými článkami bude premenená meničmi na striedavý prúd s napätím 400V, potom prostredníctvom transformačnej siete do elektrickej siete žiadateľa. FÁZY REALIZÁCIE PROJEKTU: 1.Príprava projektovej dokumentácie vrátane: mapa na účely návrhu, projektová dokumentácia, štúdia uskutočniteľnosti (IV-V 2016); 2.Výstavba fotovoltaickej inštalácie – stavebné a inštalačné práce vrátane: Príprava areálu na výstavbu, podporná konštrukcia pre panely; Moduly a meniče; Elektroinštalácia; Rozvádzače a elektrická ochrana; Telemechanika a bezpečnosť; Uzemnenie a kompenzačné zariadenie; Dátum plotu – III-IX 2017; 3.Inštalácia tepelných čerpadiel, vrátane: inštalácia tepelných čerpadiel; nahradenie radiátorov termín:III-IX 6/44 2017r. 4.Investor dohľad a propagácia projektu, vrátane: dohľad investorov, náklady na informácie a propagáciu (nákup a montáž informácií a pamätných rád) dátum: III-IX 2017r. Projekt bude realizovať obec Płoty, ktorá bude zároveň riadiť projekt. Projekt bude realizovaný priamo projektovým manažérom, ktorý v súčasnosti pôsobí ako vedúci oddelenia pre hospodársky rozvoj a investície miestnej samosprávy. Ďalší členovia tímu projektového manažmentu: Sp.ds. vyrovnanie a propagácia projektu a verejného obstarávania Sp. (Slovak)
Property / summary: Projekt sa nachádza v Płoty, na Koszalińskej ulici, v oblasti čistiarne odpadových vôd.Projekt bude realizovaný v oblasti strategickej intervencie (SSW). Cieľom projektu je výstavba fotovoltickej inštalácie s výkonom 300,16 kW a tepelných čerpadiel s výkonom 60,10 kW.Elektrická energia vo forme jednosmerného prúdu vyrábaného fotovoltaickými článkami bude premenená meničmi na striedavý prúd s napätím 400V, potom prostredníctvom transformačnej siete do elektrickej siete žiadateľa. FÁZY REALIZÁCIE PROJEKTU: 1.Príprava projektovej dokumentácie vrátane: mapa na účely návrhu, projektová dokumentácia, štúdia uskutočniteľnosti (IV-V 2016); 2.Výstavba fotovoltaickej inštalácie – stavebné a inštalačné práce vrátane: Príprava areálu na výstavbu, podporná konštrukcia pre panely; Moduly a meniče; Elektroinštalácia; Rozvádzače a elektrická ochrana; Telemechanika a bezpečnosť; Uzemnenie a kompenzačné zariadenie; Dátum plotu – III-IX 2017; 3.Inštalácia tepelných čerpadiel, vrátane: inštalácia tepelných čerpadiel; nahradenie radiátorov termín:III-IX 6/44 2017r. 4.Investor dohľad a propagácia projektu, vrátane: dohľad investorov, náklady na informácie a propagáciu (nákup a montáž informácií a pamätných rád) dátum: III-IX 2017r. Projekt bude realizovať obec Płoty, ktorá bude zároveň riadiť projekt. Projekt bude realizovaný priamo projektovým manažérom, ktorý v súčasnosti pôsobí ako vedúci oddelenia pre hospodársky rozvoj a investície miestnej samosprávy. Ďalší členovia tímu projektového manažmentu: Sp.ds. vyrovnanie a propagácia projektu a verejného obstarávania Sp. (Slovak) / rank
 
Normal rank
Property / summary: Projekt sa nachádza v Płoty, na Koszalińskej ulici, v oblasti čistiarne odpadových vôd.Projekt bude realizovaný v oblasti strategickej intervencie (SSW). Cieľom projektu je výstavba fotovoltickej inštalácie s výkonom 300,16 kW a tepelných čerpadiel s výkonom 60,10 kW.Elektrická energia vo forme jednosmerného prúdu vyrábaného fotovoltaickými článkami bude premenená meničmi na striedavý prúd s napätím 400V, potom prostredníctvom transformačnej siete do elektrickej siete žiadateľa. FÁZY REALIZÁCIE PROJEKTU: 1.Príprava projektovej dokumentácie vrátane: mapa na účely návrhu, projektová dokumentácia, štúdia uskutočniteľnosti (IV-V 2016); 2.Výstavba fotovoltaickej inštalácie – stavebné a inštalačné práce vrátane: Príprava areálu na výstavbu, podporná konštrukcia pre panely; Moduly a meniče; Elektroinštalácia; Rozvádzače a elektrická ochrana; Telemechanika a bezpečnosť; Uzemnenie a kompenzačné zariadenie; Dátum plotu – III-IX 2017; 3.Inštalácia tepelných čerpadiel, vrátane: inštalácia tepelných čerpadiel; nahradenie radiátorov termín:III-IX 6/44 2017r. 4.Investor dohľad a propagácia projektu, vrátane: dohľad investorov, náklady na informácie a propagáciu (nákup a montáž informácií a pamätných rád) dátum: III-IX 2017r. Projekt bude realizovať obec Płoty, ktorá bude zároveň riadiť projekt. Projekt bude realizovaný priamo projektovým manažérom, ktorý v súčasnosti pôsobí ako vedúci oddelenia pre hospodársky rozvoj a investície miestnej samosprávy. Ďalší členovia tímu projektového manažmentu: Sp.ds. vyrovnanie a propagácia projektu a verejného obstarávania Sp. (Slovak) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Il-proġett jinsab fi Płoty, fi Triq Koszalińska, fiż-żona tal-impjant tat-trattament tal-ilma mormi. Il-proġett se jiġi implimentat fil-qasam tal-Intervent Strateġiku (SSW). L-għan tal-proġett huwa l-kostruzzjoni ta’ installazzjoni fotovoltajka b’enerġija ta’ 300.16 kW u pompi tas-sħana b’enerġija ta’ 60.10 kW. L-enerġija elettrika fil-forma ta’ kurrent dirett prodotta minn ċelloli fotovoltajċi se tiġi kkonvertita minn invertituri f’kurrent alternanti b’vultaġġ ta’ 400V, imbagħad permezz ta’ netwerk ta’ transformer għan-netwerk tal-elettriku tal-applikant. STADJI TAL-IMPLIMENTAZZJONI TAL-PROĠETT: 1.Preparazzjoni tad-dokumentazzjoni tal-proġett inkluż: mappa għal skopijiet ta’ disinn, dokumentazzjoni tal-proġett, studju ta’ fattibbiltà (IV-V 2016); 2.Kostruzzjoni ta’ installazzjoni fotovoltajka — xogħlijiet ta’ kostruzzjoni u installazzjoni, inklużi: Tħejjija tas-sit għall-kostruzzjoni, Struttura ta’ appoġġ għall-pannelli; Moduli u invertituri; Sistemi ta’ wajers; Switchgear u protezzjoni elettrika; It-Telemechanika u s-sigurtà; Ertjar u installazzjoni kompensatorja; Data taċ-ċint tas-sit — III-IX 2017; 3.Installazzjoni ta’ pompi tas-sħana, inklużi: installazzjoni ta’ pompi tas-sħana; sostituzzjoni tat-terminu tar-radjaturi:III-IX 6/44 2017r. 4.Is-superviżjoni tal-investituri u l-promozzjoni tal-proġett, inklużi: is-superviżjoni tal-investituri, l-ispejjeż tal-informazzjoni u tal-promozzjoni (ix-xiri u l-assemblaġġ tal-informazzjoni u l-bordijiet kommemorattivi): III-IX 2017r. Il-proġett ser jiġi implimentat mill-Muniċipalità ta’ Płoty, li fl-istess ħin ser tmexxi l-proġett. Il-proġett se jiġi implimentat direttament mill-Maniġer tal-Proġett, li bħalissa qed jaġixxi bħala Kap tad-Dipartiment tal-Iżvilupp Ekonomiku u l-Investimenti tal-Gvern Lokali. Membri oħra tat-tim tal-ġestjoni tal-proġett: Is-soluzzjoni ta’ Sp.ds. u l-promozzjoni tal-proġett u l-Isp. tal-Akkwist Pubbliku (Maltese)
Property / summary: Il-proġett jinsab fi Płoty, fi Triq Koszalińska, fiż-żona tal-impjant tat-trattament tal-ilma mormi. Il-proġett se jiġi implimentat fil-qasam tal-Intervent Strateġiku (SSW). L-għan tal-proġett huwa l-kostruzzjoni ta’ installazzjoni fotovoltajka b’enerġija ta’ 300.16 kW u pompi tas-sħana b’enerġija ta’ 60.10 kW. L-enerġija elettrika fil-forma ta’ kurrent dirett prodotta minn ċelloli fotovoltajċi se tiġi kkonvertita minn invertituri f’kurrent alternanti b’vultaġġ ta’ 400V, imbagħad permezz ta’ netwerk ta’ transformer għan-netwerk tal-elettriku tal-applikant. STADJI TAL-IMPLIMENTAZZJONI TAL-PROĠETT: 1.Preparazzjoni tad-dokumentazzjoni tal-proġett inkluż: mappa għal skopijiet ta’ disinn, dokumentazzjoni tal-proġett, studju ta’ fattibbiltà (IV-V 2016); 2.Kostruzzjoni ta’ installazzjoni fotovoltajka — xogħlijiet ta’ kostruzzjoni u installazzjoni, inklużi: Tħejjija tas-sit għall-kostruzzjoni, Struttura ta’ appoġġ għall-pannelli; Moduli u invertituri; Sistemi ta’ wajers; Switchgear u protezzjoni elettrika; It-Telemechanika u s-sigurtà; Ertjar u installazzjoni kompensatorja; Data taċ-ċint tas-sit — III-IX 2017; 3.Installazzjoni ta’ pompi tas-sħana, inklużi: installazzjoni ta’ pompi tas-sħana; sostituzzjoni tat-terminu tar-radjaturi:III-IX 6/44 2017r. 4.Is-superviżjoni tal-investituri u l-promozzjoni tal-proġett, inklużi: is-superviżjoni tal-investituri, l-ispejjeż tal-informazzjoni u tal-promozzjoni (ix-xiri u l-assemblaġġ tal-informazzjoni u l-bordijiet kommemorattivi): III-IX 2017r. Il-proġett ser jiġi implimentat mill-Muniċipalità ta’ Płoty, li fl-istess ħin ser tmexxi l-proġett. Il-proġett se jiġi implimentat direttament mill-Maniġer tal-Proġett, li bħalissa qed jaġixxi bħala Kap tad-Dipartiment tal-Iżvilupp Ekonomiku u l-Investimenti tal-Gvern Lokali. Membri oħra tat-tim tal-ġestjoni tal-proġett: Is-soluzzjoni ta’ Sp.ds. u l-promozzjoni tal-proġett u l-Isp. tal-Akkwist Pubbliku (Maltese) / rank
 
Normal rank
Property / summary: Il-proġett jinsab fi Płoty, fi Triq Koszalińska, fiż-żona tal-impjant tat-trattament tal-ilma mormi. Il-proġett se jiġi implimentat fil-qasam tal-Intervent Strateġiku (SSW). L-għan tal-proġett huwa l-kostruzzjoni ta’ installazzjoni fotovoltajka b’enerġija ta’ 300.16 kW u pompi tas-sħana b’enerġija ta’ 60.10 kW. L-enerġija elettrika fil-forma ta’ kurrent dirett prodotta minn ċelloli fotovoltajċi se tiġi kkonvertita minn invertituri f’kurrent alternanti b’vultaġġ ta’ 400V, imbagħad permezz ta’ netwerk ta’ transformer għan-netwerk tal-elettriku tal-applikant. STADJI TAL-IMPLIMENTAZZJONI TAL-PROĠETT: 1.Preparazzjoni tad-dokumentazzjoni tal-proġett inkluż: mappa għal skopijiet ta’ disinn, dokumentazzjoni tal-proġett, studju ta’ fattibbiltà (IV-V 2016); 2.Kostruzzjoni ta’ installazzjoni fotovoltajka — xogħlijiet ta’ kostruzzjoni u installazzjoni, inklużi: Tħejjija tas-sit għall-kostruzzjoni, Struttura ta’ appoġġ għall-pannelli; Moduli u invertituri; Sistemi ta’ wajers; Switchgear u protezzjoni elettrika; It-Telemechanika u s-sigurtà; Ertjar u installazzjoni kompensatorja; Data taċ-ċint tas-sit — III-IX 2017; 3.Installazzjoni ta’ pompi tas-sħana, inklużi: installazzjoni ta’ pompi tas-sħana; sostituzzjoni tat-terminu tar-radjaturi:III-IX 6/44 2017r. 4.Is-superviżjoni tal-investituri u l-promozzjoni tal-proġett, inklużi: is-superviżjoni tal-investituri, l-ispejjeż tal-informazzjoni u tal-promozzjoni (ix-xiri u l-assemblaġġ tal-informazzjoni u l-bordijiet kommemorattivi): III-IX 2017r. Il-proġett ser jiġi implimentat mill-Muniċipalità ta’ Płoty, li fl-istess ħin ser tmexxi l-proġett. Il-proġett se jiġi implimentat direttament mill-Maniġer tal-Proġett, li bħalissa qed jaġixxi bħala Kap tad-Dipartiment tal-Iżvilupp Ekonomiku u l-Investimenti tal-Gvern Lokali. Membri oħra tat-tim tal-ġestjoni tal-proġett: Is-soluzzjoni ta’ Sp.ds. u l-promozzjoni tal-proġett u l-Isp. tal-Akkwist Pubbliku (Maltese) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
O projecto será implementado na área de Intervenção Estratégica (SSW).O objecto do projecto é a construção de uma instalação fotovoltaica com uma potência de 300,16 kW e as bombas de calor com uma potência de 60,10 kW.A energia eléctrica sob a forma de corrente contínua produzida por células fotovoltaicas será transformada pelo inversor pelo inversor na corrente alternada. ETAPAS DE EXECUÇÃO DO PROJETO: 1.Preparação da documentação do projeto, incluindo: mapa para efeitos de conceção, conceção e documentação do concurso, estudo de viabilidade (IV-V 2016r); 2.Construção de instalações fotovoltaicas – trabalhos de construção e instalação, incluindo: Preparação do local para a construção, estrutura de apoio para painéis; Módulos e inversores; Fiação; Mecanismos de comutação e proteções elétricas; Telemecânica e segurança; Instalação de ligação à terra e de compensação; Vedação do termo do sítio – III-IX 2017; 3.Instalação de bombas de calor, incluindo: instalação de bombas de calor; troca de termos de radiadores:III-IX 6/44 2017r. 4.Supervisão do investimento e promoção de projetos, incluindo: supervisão dos investidores, custos de informação e promoção (compra e instalação de quadros informativos e comemorativos) prazo:III-IX 2017 O projeto será realizado pelo município de Płota, que gerirá simultaneamente o projeto. O gestor do projeto, que atua atualmente como chefe do Departamento de Desenvolvimento Económico e Investimentos da Administração Local, estará diretamente envolvido na execução do projeto. Outros membros da equipa de gestão do projeto: Sp.ds. liquidação e promoção do projeto e Sp. para contratos públicos. O serviço de contabilidade do projeto será realizado pelo Tesouro do Município, que coopera (Portuguese)
Property / summary: O projecto será implementado na área de Intervenção Estratégica (SSW).O objecto do projecto é a construção de uma instalação fotovoltaica com uma potência de 300,16 kW e as bombas de calor com uma potência de 60,10 kW.A energia eléctrica sob a forma de corrente contínua produzida por células fotovoltaicas será transformada pelo inversor pelo inversor na corrente alternada. ETAPAS DE EXECUÇÃO DO PROJETO: 1.Preparação da documentação do projeto, incluindo: mapa para efeitos de conceção, conceção e documentação do concurso, estudo de viabilidade (IV-V 2016r); 2.Construção de instalações fotovoltaicas – trabalhos de construção e instalação, incluindo: Preparação do local para a construção, estrutura de apoio para painéis; Módulos e inversores; Fiação; Mecanismos de comutação e proteções elétricas; Telemecânica e segurança; Instalação de ligação à terra e de compensação; Vedação do termo do sítio – III-IX 2017; 3.Instalação de bombas de calor, incluindo: instalação de bombas de calor; troca de termos de radiadores:III-IX 6/44 2017r. 4.Supervisão do investimento e promoção de projetos, incluindo: supervisão dos investidores, custos de informação e promoção (compra e instalação de quadros informativos e comemorativos) prazo:III-IX 2017 O projeto será realizado pelo município de Płota, que gerirá simultaneamente o projeto. O gestor do projeto, que atua atualmente como chefe do Departamento de Desenvolvimento Económico e Investimentos da Administração Local, estará diretamente envolvido na execução do projeto. Outros membros da equipa de gestão do projeto: Sp.ds. liquidação e promoção do projeto e Sp. para contratos públicos. O serviço de contabilidade do projeto será realizado pelo Tesouro do Município, que coopera (Portuguese) / rank
 
Normal rank
Property / summary: O projecto será implementado na área de Intervenção Estratégica (SSW).O objecto do projecto é a construção de uma instalação fotovoltaica com uma potência de 300,16 kW e as bombas de calor com uma potência de 60,10 kW.A energia eléctrica sob a forma de corrente contínua produzida por células fotovoltaicas será transformada pelo inversor pelo inversor na corrente alternada. ETAPAS DE EXECUÇÃO DO PROJETO: 1.Preparação da documentação do projeto, incluindo: mapa para efeitos de conceção, conceção e documentação do concurso, estudo de viabilidade (IV-V 2016r); 2.Construção de instalações fotovoltaicas – trabalhos de construção e instalação, incluindo: Preparação do local para a construção, estrutura de apoio para painéis; Módulos e inversores; Fiação; Mecanismos de comutação e proteções elétricas; Telemecânica e segurança; Instalação de ligação à terra e de compensação; Vedação do termo do sítio – III-IX 2017; 3.Instalação de bombas de calor, incluindo: instalação de bombas de calor; troca de termos de radiadores:III-IX 6/44 2017r. 4.Supervisão do investimento e promoção de projetos, incluindo: supervisão dos investidores, custos de informação e promoção (compra e instalação de quadros informativos e comemorativos) prazo:III-IX 2017 O projeto será realizado pelo município de Płota, que gerirá simultaneamente o projeto. O gestor do projeto, que atua atualmente como chefe do Departamento de Desenvolvimento Económico e Investimentos da Administração Local, estará diretamente envolvido na execução do projeto. Outros membros da equipa de gestão do projeto: Sp.ds. liquidação e promoção do projeto e Sp. para contratos públicos. O serviço de contabilidade do projeto será realizado pelo Tesouro do Município, que coopera (Portuguese) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Hanke sijaitsee Płotyssa, Koszalińska-kadulla, jätevedenpuhdistamon alueella.Hanke toteutetaan strategisen intervention (SSW) alueella.Hankkeen tavoitteena on rakentaa aurinkosähkölaitos, jonka teho on 300,16 kW, ja lämpöpumput, joiden teho on 60,10 kW.Valtosähkökennojen tuottama sähköenergia muunnetaan vaihtovirraksi 400 V:n jännitteellä ja sitten kantajan sähköverkkoon muuntajaverkolla. HANKKEEN TOTEUTUKSEN VAIHEET: 1. Hankeasiakirjojen valmistelu, mukaan lukien: kartta suunnittelua varten, hankedokumentaatio, toteutettavuustutkimus (IV-V 2016); 2. Aurinkosähkölaitteiston rakentaminen – rakennus- ja asennustyöt, mukaan lukien: Rakennuspaikan valmistelu, paneelien tukirakenne; Moduulit ja invertterit; Johdotus; Kytkinlaitteet ja sähkösuojaus; Telemechanika ja turvallisuus; Maadoitus ja korvaava asennus; Sivuston aita päivämäärä – III-IX 2017; 3. Lämpöpumppujen asennus, mukaan lukien: lämpöpumppujen asennus; lämpöpatterien korvaaminen termi:III-IX 6/44 2017r. 4.Investorin valvonta ja hankkeiden edistäminen, mukaan lukien: sijoittajan valvonta-, tiedotus- ja menekinedistämiskustannukset (tiedon hankinta ja kokoaminen sekä muistolautakunnat) päivämäärä: III-IX 2017r. Hankkeen toteuttaa Płotyn kunta, joka hallinnoi hanketta samanaikaisesti. Hankkeen toteuttaa suoraan projektipäällikkö, joka toimii tällä hetkellä taloudellisen kehityksen ja paikallishallinnon investointien osaston päällikkönä. Muut projektinjohtoryhmän jäsenet: Sp.ds. selvitys ja edistäminen hankkeen ja julkisten hankintojen Sp. (Finnish)
Property / summary: Hanke sijaitsee Płotyssa, Koszalińska-kadulla, jätevedenpuhdistamon alueella.Hanke toteutetaan strategisen intervention (SSW) alueella.Hankkeen tavoitteena on rakentaa aurinkosähkölaitos, jonka teho on 300,16 kW, ja lämpöpumput, joiden teho on 60,10 kW.Valtosähkökennojen tuottama sähköenergia muunnetaan vaihtovirraksi 400 V:n jännitteellä ja sitten kantajan sähköverkkoon muuntajaverkolla. HANKKEEN TOTEUTUKSEN VAIHEET: 1. Hankeasiakirjojen valmistelu, mukaan lukien: kartta suunnittelua varten, hankedokumentaatio, toteutettavuustutkimus (IV-V 2016); 2. Aurinkosähkölaitteiston rakentaminen – rakennus- ja asennustyöt, mukaan lukien: Rakennuspaikan valmistelu, paneelien tukirakenne; Moduulit ja invertterit; Johdotus; Kytkinlaitteet ja sähkösuojaus; Telemechanika ja turvallisuus; Maadoitus ja korvaava asennus; Sivuston aita päivämäärä – III-IX 2017; 3. Lämpöpumppujen asennus, mukaan lukien: lämpöpumppujen asennus; lämpöpatterien korvaaminen termi:III-IX 6/44 2017r. 4.Investorin valvonta ja hankkeiden edistäminen, mukaan lukien: sijoittajan valvonta-, tiedotus- ja menekinedistämiskustannukset (tiedon hankinta ja kokoaminen sekä muistolautakunnat) päivämäärä: III-IX 2017r. Hankkeen toteuttaa Płotyn kunta, joka hallinnoi hanketta samanaikaisesti. Hankkeen toteuttaa suoraan projektipäällikkö, joka toimii tällä hetkellä taloudellisen kehityksen ja paikallishallinnon investointien osaston päällikkönä. Muut projektinjohtoryhmän jäsenet: Sp.ds. selvitys ja edistäminen hankkeen ja julkisten hankintojen Sp. (Finnish) / rank
 
Normal rank
Property / summary: Hanke sijaitsee Płotyssa, Koszalińska-kadulla, jätevedenpuhdistamon alueella.Hanke toteutetaan strategisen intervention (SSW) alueella.Hankkeen tavoitteena on rakentaa aurinkosähkölaitos, jonka teho on 300,16 kW, ja lämpöpumput, joiden teho on 60,10 kW.Valtosähkökennojen tuottama sähköenergia muunnetaan vaihtovirraksi 400 V:n jännitteellä ja sitten kantajan sähköverkkoon muuntajaverkolla. HANKKEEN TOTEUTUKSEN VAIHEET: 1. Hankeasiakirjojen valmistelu, mukaan lukien: kartta suunnittelua varten, hankedokumentaatio, toteutettavuustutkimus (IV-V 2016); 2. Aurinkosähkölaitteiston rakentaminen – rakennus- ja asennustyöt, mukaan lukien: Rakennuspaikan valmistelu, paneelien tukirakenne; Moduulit ja invertterit; Johdotus; Kytkinlaitteet ja sähkösuojaus; Telemechanika ja turvallisuus; Maadoitus ja korvaava asennus; Sivuston aita päivämäärä – III-IX 2017; 3. Lämpöpumppujen asennus, mukaan lukien: lämpöpumppujen asennus; lämpöpatterien korvaaminen termi:III-IX 6/44 2017r. 4.Investorin valvonta ja hankkeiden edistäminen, mukaan lukien: sijoittajan valvonta-, tiedotus- ja menekinedistämiskustannukset (tiedon hankinta ja kokoaminen sekä muistolautakunnat) päivämäärä: III-IX 2017r. Hankkeen toteuttaa Płotyn kunta, joka hallinnoi hanketta samanaikaisesti. Hankkeen toteuttaa suoraan projektipäällikkö, joka toimii tällä hetkellä taloudellisen kehityksen ja paikallishallinnon investointien osaston päällikkönä. Muut projektinjohtoryhmän jäsenet: Sp.ds. selvitys ja edistäminen hankkeen ja julkisten hankintojen Sp. (Finnish) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt se nahaja v Płotyju, na Koszaliński ulici, na področju čistilne naprave za odpadne vode.Projekt se bo izvajal na področju strateškega posredovanja (SSW). Cilj projekta je gradnja fotonapetostne naprave z močjo 300,16 kW in toplotnih črpalk z močjo 60,10 kW.Električna energija v obliki enosmernega toka, ki ga proizvajajo fotovoltaične celice, bodo pretvorniki pretvorili v izmenični tok z napetostjo 400V, nato pa s transformatorskim omrežjem v električno omrežje vlagatelja. FAZE IZVAJANJA PROJEKTA: 1.Priprava projektne dokumentacije, vključno z: zemljevid za namene načrtovanja, projektna dokumentacija, študija izvedljivosti (IV-V 2016); 2.Izgradnja fotonapetostne instalacije – gradbena in inštalacijska dela, vključno z: Priprava gradbišča za gradnjo, podporna konstrukcija za plošče; Moduli in inverterji; Ožičenje; Stikalne naprave in električna zaščita; Telemechanika in varnost; Ozemljitev in kompenzacijska namestitev; Datum ograje mesta – III-IX 2017; 3. Vgradnja toplotnih črpalk, vključno z: namestitev toplotnih črpalk; zamenjava izraza radiatorjev:III-IX 6/44 2017r. 4.nadzor investitorjev in promocija projektov, vključno z: nadzor vlagateljev, stroški informiranja in promocije (nakup in montaža informativnih in spominskih desk) datum: III-IX 2017r. Projekt bo izvajala občina Płoty, ki bo projekt hkrati upravljala. Projekt bo neposredno izvajal vodja projekta, ki trenutno deluje kot vodja oddelka za gospodarski razvoj in naložbe lokalne uprave. Drugi člani projektne ekipe: Sp.ds. poravnava in promocija projekta in javnega naročanja Sp. (Slovenian)
Property / summary: Projekt se nahaja v Płotyju, na Koszaliński ulici, na področju čistilne naprave za odpadne vode.Projekt se bo izvajal na področju strateškega posredovanja (SSW). Cilj projekta je gradnja fotonapetostne naprave z močjo 300,16 kW in toplotnih črpalk z močjo 60,10 kW.Električna energija v obliki enosmernega toka, ki ga proizvajajo fotovoltaične celice, bodo pretvorniki pretvorili v izmenični tok z napetostjo 400V, nato pa s transformatorskim omrežjem v električno omrežje vlagatelja. FAZE IZVAJANJA PROJEKTA: 1.Priprava projektne dokumentacije, vključno z: zemljevid za namene načrtovanja, projektna dokumentacija, študija izvedljivosti (IV-V 2016); 2.Izgradnja fotonapetostne instalacije – gradbena in inštalacijska dela, vključno z: Priprava gradbišča za gradnjo, podporna konstrukcija za plošče; Moduli in inverterji; Ožičenje; Stikalne naprave in električna zaščita; Telemechanika in varnost; Ozemljitev in kompenzacijska namestitev; Datum ograje mesta – III-IX 2017; 3. Vgradnja toplotnih črpalk, vključno z: namestitev toplotnih črpalk; zamenjava izraza radiatorjev:III-IX 6/44 2017r. 4.nadzor investitorjev in promocija projektov, vključno z: nadzor vlagateljev, stroški informiranja in promocije (nakup in montaža informativnih in spominskih desk) datum: III-IX 2017r. Projekt bo izvajala občina Płoty, ki bo projekt hkrati upravljala. Projekt bo neposredno izvajal vodja projekta, ki trenutno deluje kot vodja oddelka za gospodarski razvoj in naložbe lokalne uprave. Drugi člani projektne ekipe: Sp.ds. poravnava in promocija projekta in javnega naročanja Sp. (Slovenian) / rank
 
Normal rank
Property / summary: Projekt se nahaja v Płotyju, na Koszaliński ulici, na področju čistilne naprave za odpadne vode.Projekt se bo izvajal na področju strateškega posredovanja (SSW). Cilj projekta je gradnja fotonapetostne naprave z močjo 300,16 kW in toplotnih črpalk z močjo 60,10 kW.Električna energija v obliki enosmernega toka, ki ga proizvajajo fotovoltaične celice, bodo pretvorniki pretvorili v izmenični tok z napetostjo 400V, nato pa s transformatorskim omrežjem v električno omrežje vlagatelja. FAZE IZVAJANJA PROJEKTA: 1.Priprava projektne dokumentacije, vključno z: zemljevid za namene načrtovanja, projektna dokumentacija, študija izvedljivosti (IV-V 2016); 2.Izgradnja fotonapetostne instalacije – gradbena in inštalacijska dela, vključno z: Priprava gradbišča za gradnjo, podporna konstrukcija za plošče; Moduli in inverterji; Ožičenje; Stikalne naprave in električna zaščita; Telemechanika in varnost; Ozemljitev in kompenzacijska namestitev; Datum ograje mesta – III-IX 2017; 3. Vgradnja toplotnih črpalk, vključno z: namestitev toplotnih črpalk; zamenjava izraza radiatorjev:III-IX 6/44 2017r. 4.nadzor investitorjev in promocija projektov, vključno z: nadzor vlagateljev, stroški informiranja in promocije (nakup in montaža informativnih in spominskih desk) datum: III-IX 2017r. Projekt bo izvajala občina Płoty, ki bo projekt hkrati upravljala. Projekt bo neposredno izvajal vodja projekta, ki trenutno deluje kot vodja oddelka za gospodarski razvoj in naložbe lokalne uprave. Drugi člani projektne ekipe: Sp.ds. poravnava in promocija projekta in javnega naročanja Sp. (Slovenian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt se nachází v Płoty, v ulici Koszalińska, v oblasti čistírny odpadních vod.Projekt bude realizován v oblasti strategické intervence (SSW).Cílem projektu je výstavba fotovoltaického zařízení o výkonu 300,16 kW a tepelných čerpadel o výkonu 60,10 kW.Elektrická energie ve formě stejnosměrného proudu vyráběného fotovoltaickými články bude přeměněna měniči na střídavý proud s napětím 400V, poté prostřednictvím transformátorové sítě do elektrické sítě žalobkyně. FÁZE REALIZACE PROJEKTU: 1.Příprava projektové dokumentace včetně: mapa pro účely návrhu, projektová dokumentace, studie proveditelnosti (IV-V 2016); 2.Výstavba fotovoltaické instalace – stavební a instalační práce, včetně: Příprava lokality pro výstavbu, Podpůrná konstrukce pro panely; Moduly a měniče; Elektroinstalace; Rozvaděče a elektrická ochrana; Telemechanika a bezpečnost; Uzemnění a kompenzační zařízení; Datum oplocení pozemku – III-IX 2017; 3.Instalace tepelných čerpadel, včetně: instalace tepelných čerpadel; termín nahrazení radiátorů:III-IX 6/44 2017r. 4. Investorský dohled a propagace projektů, včetně: dohled investorů, náklady na informace a propagaci (nákup a montáž informačních a pamětních rad) datum: III-IX 2017r. Projekt bude realizován obcí Płoty, která bude projekt současně řídit. Projekt bude realizován přímo projektovým manažerem, který v současné době působí jako vedoucí odboru hospodářského rozvoje a místních vládních investic. Další členové týmu projektového managementu: Sp.ds. vypořádání a propagace projektu a veřejných zakázek Sp. (Czech)
Property / summary: Projekt se nachází v Płoty, v ulici Koszalińska, v oblasti čistírny odpadních vod.Projekt bude realizován v oblasti strategické intervence (SSW).Cílem projektu je výstavba fotovoltaického zařízení o výkonu 300,16 kW a tepelných čerpadel o výkonu 60,10 kW.Elektrická energie ve formě stejnosměrného proudu vyráběného fotovoltaickými články bude přeměněna měniči na střídavý proud s napětím 400V, poté prostřednictvím transformátorové sítě do elektrické sítě žalobkyně. FÁZE REALIZACE PROJEKTU: 1.Příprava projektové dokumentace včetně: mapa pro účely návrhu, projektová dokumentace, studie proveditelnosti (IV-V 2016); 2.Výstavba fotovoltaické instalace – stavební a instalační práce, včetně: Příprava lokality pro výstavbu, Podpůrná konstrukce pro panely; Moduly a měniče; Elektroinstalace; Rozvaděče a elektrická ochrana; Telemechanika a bezpečnost; Uzemnění a kompenzační zařízení; Datum oplocení pozemku – III-IX 2017; 3.Instalace tepelných čerpadel, včetně: instalace tepelných čerpadel; termín nahrazení radiátorů:III-IX 6/44 2017r. 4. Investorský dohled a propagace projektů, včetně: dohled investorů, náklady na informace a propagaci (nákup a montáž informačních a pamětních rad) datum: III-IX 2017r. Projekt bude realizován obcí Płoty, která bude projekt současně řídit. Projekt bude realizován přímo projektovým manažerem, který v současné době působí jako vedoucí odboru hospodářského rozvoje a místních vládních investic. Další členové týmu projektového managementu: Sp.ds. vypořádání a propagace projektu a veřejných zakázek Sp. (Czech) / rank
 
Normal rank
Property / summary: Projekt se nachází v Płoty, v ulici Koszalińska, v oblasti čistírny odpadních vod.Projekt bude realizován v oblasti strategické intervence (SSW).Cílem projektu je výstavba fotovoltaického zařízení o výkonu 300,16 kW a tepelných čerpadel o výkonu 60,10 kW.Elektrická energie ve formě stejnosměrného proudu vyráběného fotovoltaickými články bude přeměněna měniči na střídavý proud s napětím 400V, poté prostřednictvím transformátorové sítě do elektrické sítě žalobkyně. FÁZE REALIZACE PROJEKTU: 1.Příprava projektové dokumentace včetně: mapa pro účely návrhu, projektová dokumentace, studie proveditelnosti (IV-V 2016); 2.Výstavba fotovoltaické instalace – stavební a instalační práce, včetně: Příprava lokality pro výstavbu, Podpůrná konstrukce pro panely; Moduly a měniče; Elektroinstalace; Rozvaděče a elektrická ochrana; Telemechanika a bezpečnost; Uzemnění a kompenzační zařízení; Datum oplocení pozemku – III-IX 2017; 3.Instalace tepelných čerpadel, včetně: instalace tepelných čerpadel; termín nahrazení radiátorů:III-IX 6/44 2017r. 4. Investorský dohled a propagace projektů, včetně: dohled investorů, náklady na informace a propagaci (nákup a montáž informačních a pamětních rad) datum: III-IX 2017r. Projekt bude realizován obcí Płoty, která bude projekt současně řídit. Projekt bude realizován přímo projektovým manažerem, který v současné době působí jako vedoucí odboru hospodářského rozvoje a místních vládních investic. Další členové týmu projektového managementu: Sp.ds. vypořádání a propagace projektu a veřejných zakázek Sp. (Czech) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projektas vykdomas Płoty, Koszalińska gatvėje, nuotekų valymo įrenginio srityje.Projektas bus įgyvendinamas Strateginės intervencijos (SSW) srityje.Projekto objektas – 300,16 kW galios fotoelektros įrenginio ir 60,10 kW galios šilumos siurblių statyba.Elektros energija fotovoltinių elementų gaminamos nuolatinės srovės forma bus konvertuojama inverteriais į kintamąją 400V įtampos srovę, tada pareiškėjo elektros tinklui transformuojant transformatorių tinklą. PROJEKTO ĮGYVENDINIMO ETAPAI: 1.Projekto dokumentų rengimas, įskaitant: projektavimo tikslų žemėlapis, projekto dokumentacija, galimybių studija (IV-V 2016); 2. Fotoelektros instaliacijos statyba – statybos ir montavimo darbai, įskaitant: Statybvietės paruošimas statybai, plokščių atraminė konstrukcija; Moduliai ir inverteriai; Elektros instaliacijos; Skirstomieji įrenginiai ir elektros apsauga; Telemechanika ir saugumas; Įžeminimo ir kompensacinių įrenginių; Aikštelės tvoros data – 2017 m. III-IX; 3. Šilumos siurblių įrengimas, įskaitant: šilumos siurblių įrengimas; radiatorių keitimas: III-IX 6/44 2017r. 4.Investuotojų priežiūra ir projektų skatinimas, įskaitant: investuotojų priežiūros, informavimo ir skatinimo išlaidos (informacijos ir atminimo lentų pirkimas ir surinkimas) data: III-IX 2017r. Projektą įgyvendins Płoty savivaldybė, kuri tuo pačiu metu valdys projektą. Projektą tiesiogiai įgyvendins projektų vadovas, šiuo metu einantis Ekonominės plėtros ir vietos valdžios investicijų departamento vadovo pareigas. Kiti projekto valdymo grupės nariai: Sp.ds. atsiskaitymas už projektą ir jo skatinimas bei Viešieji pirkimai Sp. (Lithuanian)
Property / summary: Projektas vykdomas Płoty, Koszalińska gatvėje, nuotekų valymo įrenginio srityje.Projektas bus įgyvendinamas Strateginės intervencijos (SSW) srityje.Projekto objektas – 300,16 kW galios fotoelektros įrenginio ir 60,10 kW galios šilumos siurblių statyba.Elektros energija fotovoltinių elementų gaminamos nuolatinės srovės forma bus konvertuojama inverteriais į kintamąją 400V įtampos srovę, tada pareiškėjo elektros tinklui transformuojant transformatorių tinklą. PROJEKTO ĮGYVENDINIMO ETAPAI: 1.Projekto dokumentų rengimas, įskaitant: projektavimo tikslų žemėlapis, projekto dokumentacija, galimybių studija (IV-V 2016); 2. Fotoelektros instaliacijos statyba – statybos ir montavimo darbai, įskaitant: Statybvietės paruošimas statybai, plokščių atraminė konstrukcija; Moduliai ir inverteriai; Elektros instaliacijos; Skirstomieji įrenginiai ir elektros apsauga; Telemechanika ir saugumas; Įžeminimo ir kompensacinių įrenginių; Aikštelės tvoros data – 2017 m. III-IX; 3. Šilumos siurblių įrengimas, įskaitant: šilumos siurblių įrengimas; radiatorių keitimas: III-IX 6/44 2017r. 4.Investuotojų priežiūra ir projektų skatinimas, įskaitant: investuotojų priežiūros, informavimo ir skatinimo išlaidos (informacijos ir atminimo lentų pirkimas ir surinkimas) data: III-IX 2017r. Projektą įgyvendins Płoty savivaldybė, kuri tuo pačiu metu valdys projektą. Projektą tiesiogiai įgyvendins projektų vadovas, šiuo metu einantis Ekonominės plėtros ir vietos valdžios investicijų departamento vadovo pareigas. Kiti projekto valdymo grupės nariai: Sp.ds. atsiskaitymas už projektą ir jo skatinimas bei Viešieji pirkimai Sp. (Lithuanian) / rank
 
Normal rank
Property / summary: Projektas vykdomas Płoty, Koszalińska gatvėje, nuotekų valymo įrenginio srityje.Projektas bus įgyvendinamas Strateginės intervencijos (SSW) srityje.Projekto objektas – 300,16 kW galios fotoelektros įrenginio ir 60,10 kW galios šilumos siurblių statyba.Elektros energija fotovoltinių elementų gaminamos nuolatinės srovės forma bus konvertuojama inverteriais į kintamąją 400V įtampos srovę, tada pareiškėjo elektros tinklui transformuojant transformatorių tinklą. PROJEKTO ĮGYVENDINIMO ETAPAI: 1.Projekto dokumentų rengimas, įskaitant: projektavimo tikslų žemėlapis, projekto dokumentacija, galimybių studija (IV-V 2016); 2. Fotoelektros instaliacijos statyba – statybos ir montavimo darbai, įskaitant: Statybvietės paruošimas statybai, plokščių atraminė konstrukcija; Moduliai ir inverteriai; Elektros instaliacijos; Skirstomieji įrenginiai ir elektros apsauga; Telemechanika ir saugumas; Įžeminimo ir kompensacinių įrenginių; Aikštelės tvoros data – 2017 m. III-IX; 3. Šilumos siurblių įrengimas, įskaitant: šilumos siurblių įrengimas; radiatorių keitimas: III-IX 6/44 2017r. 4.Investuotojų priežiūra ir projektų skatinimas, įskaitant: investuotojų priežiūros, informavimo ir skatinimo išlaidos (informacijos ir atminimo lentų pirkimas ir surinkimas) data: III-IX 2017r. Projektą įgyvendins Płoty savivaldybė, kuri tuo pačiu metu valdys projektą. Projektą tiesiogiai įgyvendins projektų vadovas, šiuo metu einantis Ekonominės plėtros ir vietos valdžios investicijų departamento vadovo pareigas. Kiti projekto valdymo grupės nariai: Sp.ds. atsiskaitymas už projektą ir jo skatinimas bei Viešieji pirkimai Sp. (Lithuanian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekts atrodas Płoty, Koszalińska ielā, notekūdeņu attīrīšanas iekārtas teritorijā.Projekts tiks īstenots stratēģiskās iejaukšanās (SSW) jomā.Projekta objekts ir fotoelementu iekārtas ar jaudu 300,16 kW un siltumsūkņu ar jaudu 60,10 kW būvniecība.Elektroenerģiju līdzstrāvas veidā, ko ražo fotoelementi, invertori pārveidos maiņstrāvā ar spriegumu 400 V, pēc tam ar transformatoru tīklu prasītājas elektrotīklā. PROJEKTA ĪSTENOŠANAS POSMI: 1.Projekta dokumentācijas sagatavošana, tostarp: karte projektēšanas vajadzībām, projekta dokumentācija, priekšizpēte (IV-V 2016); 2.Būvelementu instalācijas būvniecība — celtniecības un uzstādīšanas darbi, tai skaitā: Būvlaukuma sagatavošana būvniecībai, paneļu atbalsta struktūra; Moduļi un invertori; Elektroinstalācija; Sadales iekārtas un elektriskā aizsardzība; Telemechanika un drošība; Zemējuma un kompensācijas uzstādīšana; Teritorijas nožogojuma datums — III-IX 2017; 3.siltumsūkņu uzstādīšana, tai skaitā: siltumsūkņu uzstādīšana; radiatoru termina nomaiņa:III-IX 6/44 2017r. 4.Ieguldītāju uzraudzība un projektu veicināšana, tostarp: investoru uzraudzības, informācijas un veicināšanas izmaksas (informācijas un piemiņas padomju iegāde un montāža) datums: III-IX 2017r. Projektu īstenos Płoty pašvaldība, kas vienlaikus pārvaldīs projektu. Projektu īstenos tieši projekta vadītājs, kas pašlaik darbojas kā Ekonomikas attīstības un pašvaldību investīciju departamenta vadītājs. Citi projekta vadības komandas locekļi: Sp.ds. projekta nokārtošana un veicināšana un publiskais iepirkums Sp. (Latvian)
Property / summary: Projekts atrodas Płoty, Koszalińska ielā, notekūdeņu attīrīšanas iekārtas teritorijā.Projekts tiks īstenots stratēģiskās iejaukšanās (SSW) jomā.Projekta objekts ir fotoelementu iekārtas ar jaudu 300,16 kW un siltumsūkņu ar jaudu 60,10 kW būvniecība.Elektroenerģiju līdzstrāvas veidā, ko ražo fotoelementi, invertori pārveidos maiņstrāvā ar spriegumu 400 V, pēc tam ar transformatoru tīklu prasītājas elektrotīklā. PROJEKTA ĪSTENOŠANAS POSMI: 1.Projekta dokumentācijas sagatavošana, tostarp: karte projektēšanas vajadzībām, projekta dokumentācija, priekšizpēte (IV-V 2016); 2.Būvelementu instalācijas būvniecība — celtniecības un uzstādīšanas darbi, tai skaitā: Būvlaukuma sagatavošana būvniecībai, paneļu atbalsta struktūra; Moduļi un invertori; Elektroinstalācija; Sadales iekārtas un elektriskā aizsardzība; Telemechanika un drošība; Zemējuma un kompensācijas uzstādīšana; Teritorijas nožogojuma datums — III-IX 2017; 3.siltumsūkņu uzstādīšana, tai skaitā: siltumsūkņu uzstādīšana; radiatoru termina nomaiņa:III-IX 6/44 2017r. 4.Ieguldītāju uzraudzība un projektu veicināšana, tostarp: investoru uzraudzības, informācijas un veicināšanas izmaksas (informācijas un piemiņas padomju iegāde un montāža) datums: III-IX 2017r. Projektu īstenos Płoty pašvaldība, kas vienlaikus pārvaldīs projektu. Projektu īstenos tieši projekta vadītājs, kas pašlaik darbojas kā Ekonomikas attīstības un pašvaldību investīciju departamenta vadītājs. Citi projekta vadības komandas locekļi: Sp.ds. projekta nokārtošana un veicināšana un publiskais iepirkums Sp. (Latvian) / rank
 
Normal rank
Property / summary: Projekts atrodas Płoty, Koszalińska ielā, notekūdeņu attīrīšanas iekārtas teritorijā.Projekts tiks īstenots stratēģiskās iejaukšanās (SSW) jomā.Projekta objekts ir fotoelementu iekārtas ar jaudu 300,16 kW un siltumsūkņu ar jaudu 60,10 kW būvniecība.Elektroenerģiju līdzstrāvas veidā, ko ražo fotoelementi, invertori pārveidos maiņstrāvā ar spriegumu 400 V, pēc tam ar transformatoru tīklu prasītājas elektrotīklā. PROJEKTA ĪSTENOŠANAS POSMI: 1.Projekta dokumentācijas sagatavošana, tostarp: karte projektēšanas vajadzībām, projekta dokumentācija, priekšizpēte (IV-V 2016); 2.Būvelementu instalācijas būvniecība — celtniecības un uzstādīšanas darbi, tai skaitā: Būvlaukuma sagatavošana būvniecībai, paneļu atbalsta struktūra; Moduļi un invertori; Elektroinstalācija; Sadales iekārtas un elektriskā aizsardzība; Telemechanika un drošība; Zemējuma un kompensācijas uzstādīšana; Teritorijas nožogojuma datums — III-IX 2017; 3.siltumsūkņu uzstādīšana, tai skaitā: siltumsūkņu uzstādīšana; radiatoru termina nomaiņa:III-IX 6/44 2017r. 4.Ieguldītāju uzraudzība un projektu veicināšana, tostarp: investoru uzraudzības, informācijas un veicināšanas izmaksas (informācijas un piemiņas padomju iegāde un montāža) datums: III-IX 2017r. Projektu īstenos Płoty pašvaldība, kas vienlaikus pārvaldīs projektu. Projektu īstenos tieši projekta vadītājs, kas pašlaik darbojas kā Ekonomikas attīstības un pašvaldību investīciju departamenta vadītājs. Citi projekta vadības komandas locekļi: Sp.ds. projekta nokārtošana un veicināšana un publiskais iepirkums Sp. (Latvian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Проектът се намира в Płoty, на улица Koszalińska, в областта на пречиствателната станция за отпадъчни води.Проектът ще бъде изпълнен в областта на стратегическата интервенция (SSW). Целта на проекта е изграждането на фотоволтаична инсталация с мощност 300,16 kW и термопомпи с мощност 60,10 kW.Електрическата енергия под формата на постоянен ток, произвеждан от фотоволтаични клетки, ще бъде преобразувана от инвертори в променлив ток с напрежение 400V, а след това чрез трансформаторна мрежа към електрическата мрежа на заявителя. ЕТАПИ НА ИЗПЪЛНЕНИЕ НА ПРОЕКТА: 1.Изготвяне на проектна документация, включваща: карта за проектни цели, проектна документация, проучване за осъществимост (IV-V 2016 г.); 2.Изграждане на фотоволтаична инсталация — строителни и монтажни работи, включително: Подготовка на площадката за строителство, Поддръжка на панели; Модули и инвертори; Окабеляване; Комутационна апаратура и електрическа защита; Телемеханика и охрана; Заземяване и компенсаторна инсталация; Дата на оградата на обекта — III-IX 2017 г.; 3.Инсталиране на термопомпи, включително: монтаж на термопомпи; подмяна на радиатори термин:III-IX 6/44 2017r. 4.Наблюдение на инвеститорите и популяризиране на проекти, включително: инвеститорски надзор, разходи за информиране и насърчаване (закупуване и сглобяване на информация и възпоменателни табла) дата: III-IX 2017r. Проектът ще се изпълнява от Община Плоти, която едновременно ще управлява проекта. Проектът ще се изпълнява пряко от ръководителя на проекта, понастоящем като ръководител на отдел „Икономическо развитие и инвестиции на местното самоуправление“. Други членове на екипа за управление на проекта: Sp.ds. уреждане и популяризиране на проекта и обществените поръчки Сп. (Bulgarian)
Property / summary: Проектът се намира в Płoty, на улица Koszalińska, в областта на пречиствателната станция за отпадъчни води.Проектът ще бъде изпълнен в областта на стратегическата интервенция (SSW). Целта на проекта е изграждането на фотоволтаична инсталация с мощност 300,16 kW и термопомпи с мощност 60,10 kW.Електрическата енергия под формата на постоянен ток, произвеждан от фотоволтаични клетки, ще бъде преобразувана от инвертори в променлив ток с напрежение 400V, а след това чрез трансформаторна мрежа към електрическата мрежа на заявителя. ЕТАПИ НА ИЗПЪЛНЕНИЕ НА ПРОЕКТА: 1.Изготвяне на проектна документация, включваща: карта за проектни цели, проектна документация, проучване за осъществимост (IV-V 2016 г.); 2.Изграждане на фотоволтаична инсталация — строителни и монтажни работи, включително: Подготовка на площадката за строителство, Поддръжка на панели; Модули и инвертори; Окабеляване; Комутационна апаратура и електрическа защита; Телемеханика и охрана; Заземяване и компенсаторна инсталация; Дата на оградата на обекта — III-IX 2017 г.; 3.Инсталиране на термопомпи, включително: монтаж на термопомпи; подмяна на радиатори термин:III-IX 6/44 2017r. 4.Наблюдение на инвеститорите и популяризиране на проекти, включително: инвеститорски надзор, разходи за информиране и насърчаване (закупуване и сглобяване на информация и възпоменателни табла) дата: III-IX 2017r. Проектът ще се изпълнява от Община Плоти, която едновременно ще управлява проекта. Проектът ще се изпълнява пряко от ръководителя на проекта, понастоящем като ръководител на отдел „Икономическо развитие и инвестиции на местното самоуправление“. Други членове на екипа за управление на проекта: Sp.ds. уреждане и популяризиране на проекта и обществените поръчки Сп. (Bulgarian) / rank
 
Normal rank
Property / summary: Проектът се намира в Płoty, на улица Koszalińska, в областта на пречиствателната станция за отпадъчни води.Проектът ще бъде изпълнен в областта на стратегическата интервенция (SSW). Целта на проекта е изграждането на фотоволтаична инсталация с мощност 300,16 kW и термопомпи с мощност 60,10 kW.Електрическата енергия под формата на постоянен ток, произвеждан от фотоволтаични клетки, ще бъде преобразувана от инвертори в променлив ток с напрежение 400V, а след това чрез трансформаторна мрежа към електрическата мрежа на заявителя. ЕТАПИ НА ИЗПЪЛНЕНИЕ НА ПРОЕКТА: 1.Изготвяне на проектна документация, включваща: карта за проектни цели, проектна документация, проучване за осъществимост (IV-V 2016 г.); 2.Изграждане на фотоволтаична инсталация — строителни и монтажни работи, включително: Подготовка на площадката за строителство, Поддръжка на панели; Модули и инвертори; Окабеляване; Комутационна апаратура и електрическа защита; Телемеханика и охрана; Заземяване и компенсаторна инсталация; Дата на оградата на обекта — III-IX 2017 г.; 3.Инсталиране на термопомпи, включително: монтаж на термопомпи; подмяна на радиатори термин:III-IX 6/44 2017r. 4.Наблюдение на инвеститорите и популяризиране на проекти, включително: инвеститорски надзор, разходи за информиране и насърчаване (закупуване и сглобяване на информация и възпоменателни табла) дата: III-IX 2017r. Проектът ще се изпълнява от Община Плоти, която едновременно ще управлява проекта. Проектът ще се изпълнява пряко от ръководителя на проекта, понастоящем като ръководител на отдел „Икономическо развитие и инвестиции на местното самоуправление“. Други членове на екипа за управление на проекта: Sp.ds. уреждане и популяризиране на проекта и обществените поръчки Сп. (Bulgarian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A projekt Płotyban található, a Koszalińska utcában, a szennyvíztisztító telep területén.A projekt a stratégiai beavatkozás (SSW) területén valósul meg.A projekt célja egy 300,16 kW teljesítményű fotovoltaikus létesítmény és 60,10 kW teljesítményű hőszivattyúk építése.A fotovoltaikus cellák által termelt egyenáramú villamos energiát az inverterek 400 V feszültségű váltakozó árammá alakítják át, majd transzformátorhálózattal a kérelmező villamosenergia-hálózatához. A PROJEKT MEGVALÓSÍTÁSÁNAK SZAKASZAI: 1.A projektdokumentáció elkészítése, beleértve: térkép tervezési célokra, projektdokumentáció, megvalósíthatósági tanulmány (IV-V 2016); 2. fotovoltaikus létesítmény építése – építési és szerelési munkák, beleértve: Az építkezés helyszínének előkészítése, panelek támogató szerkezete; Modulok és inverterek; Vezetékek; Kapcsolóberendezések és elektromos védelem; Telemechanika és biztonság; Földelő és kompenzációs létesítmény; Helyszíni kerítés dátuma – III-IX 2017; 3. hőszivattyúk beépítése, beleértve: hőszivattyúk telepítése; radiátorok cseréje:III-IX 6/44 2017r. 4. Befektetői felügyelet és projektösztönzés, beleértve: befektetői felügyelet, tájékoztatási és promóciós költségek (tájékoztató és emléktáblák beszerzése és összeszerelése) időpontja: III-IX 2017r. A projektet Płoty önkormányzata hajtja végre, amely egyidejűleg irányítja a projektet. A projektet közvetlenül a projektmenedzser hajtja végre, aki jelenleg a Gazdaságfejlesztési és Helyi Önkormányzati Beruházási Főosztály vezetője. A projektmenedzsment csapat többi tagja: Sp.ds. a projekt és a Közbeszerzési Sp. (Hungarian)
Property / summary: A projekt Płotyban található, a Koszalińska utcában, a szennyvíztisztító telep területén.A projekt a stratégiai beavatkozás (SSW) területén valósul meg.A projekt célja egy 300,16 kW teljesítményű fotovoltaikus létesítmény és 60,10 kW teljesítményű hőszivattyúk építése.A fotovoltaikus cellák által termelt egyenáramú villamos energiát az inverterek 400 V feszültségű váltakozó árammá alakítják át, majd transzformátorhálózattal a kérelmező villamosenergia-hálózatához. A PROJEKT MEGVALÓSÍTÁSÁNAK SZAKASZAI: 1.A projektdokumentáció elkészítése, beleértve: térkép tervezési célokra, projektdokumentáció, megvalósíthatósági tanulmány (IV-V 2016); 2. fotovoltaikus létesítmény építése – építési és szerelési munkák, beleértve: Az építkezés helyszínének előkészítése, panelek támogató szerkezete; Modulok és inverterek; Vezetékek; Kapcsolóberendezések és elektromos védelem; Telemechanika és biztonság; Földelő és kompenzációs létesítmény; Helyszíni kerítés dátuma – III-IX 2017; 3. hőszivattyúk beépítése, beleértve: hőszivattyúk telepítése; radiátorok cseréje:III-IX 6/44 2017r. 4. Befektetői felügyelet és projektösztönzés, beleértve: befektetői felügyelet, tájékoztatási és promóciós költségek (tájékoztató és emléktáblák beszerzése és összeszerelése) időpontja: III-IX 2017r. A projektet Płoty önkormányzata hajtja végre, amely egyidejűleg irányítja a projektet. A projektet közvetlenül a projektmenedzser hajtja végre, aki jelenleg a Gazdaságfejlesztési és Helyi Önkormányzati Beruházási Főosztály vezetője. A projektmenedzsment csapat többi tagja: Sp.ds. a projekt és a Közbeszerzési Sp. (Hungarian) / rank
 
Normal rank
Property / summary: A projekt Płotyban található, a Koszalińska utcában, a szennyvíztisztító telep területén.A projekt a stratégiai beavatkozás (SSW) területén valósul meg.A projekt célja egy 300,16 kW teljesítményű fotovoltaikus létesítmény és 60,10 kW teljesítményű hőszivattyúk építése.A fotovoltaikus cellák által termelt egyenáramú villamos energiát az inverterek 400 V feszültségű váltakozó árammá alakítják át, majd transzformátorhálózattal a kérelmező villamosenergia-hálózatához. A PROJEKT MEGVALÓSÍTÁSÁNAK SZAKASZAI: 1.A projektdokumentáció elkészítése, beleértve: térkép tervezési célokra, projektdokumentáció, megvalósíthatósági tanulmány (IV-V 2016); 2. fotovoltaikus létesítmény építése – építési és szerelési munkák, beleértve: Az építkezés helyszínének előkészítése, panelek támogató szerkezete; Modulok és inverterek; Vezetékek; Kapcsolóberendezések és elektromos védelem; Telemechanika és biztonság; Földelő és kompenzációs létesítmény; Helyszíni kerítés dátuma – III-IX 2017; 3. hőszivattyúk beépítése, beleértve: hőszivattyúk telepítése; radiátorok cseréje:III-IX 6/44 2017r. 4. Befektetői felügyelet és projektösztönzés, beleértve: befektetői felügyelet, tájékoztatási és promóciós költségek (tájékoztató és emléktáblák beszerzése és összeszerelése) időpontja: III-IX 2017r. A projektet Płoty önkormányzata hajtja végre, amely egyidejűleg irányítja a projektet. A projektet közvetlenül a projektmenedzser hajtja végre, aki jelenleg a Gazdaságfejlesztési és Helyi Önkormányzati Beruházási Főosztály vezetője. A projektmenedzsment csapat többi tagja: Sp.ds. a projekt és a Közbeszerzési Sp. (Hungarian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Tá an tionscadal suite i Płoty, ag Sráid Koszalińska, i réimse an ghléasra cóireála fuíolluisce.Cuirfear an tionscadal i bhfeidhm i réimse na hIdirghabhála Straitéisí (SSW).Is é cuspóir an tionscadail suiteáil fhótavoltach a thógáil le cumhacht 300.16 kW agus teaschaidéil le cumhacht 60.10 kW.Déanfaidh inverters fuinneamh leictreach i bhfoirm srutha dhírigh arna dtáirgeadh ag cealla fótavoltacha a thiontú ina sruth ailtéarnach le voltas 400V, ansin trí líonra claochladáin chuig líonra leictreachais an iarratasóra. CÉIMEANNA CHUR CHUN FEIDHME AN TIONSCADAIL: 1. Ullmhú doiciméadú tionscadail lena n-áirítear: léarscáil chun críocha deartha, doiciméadacht tionscadail, staidéar féidearthachta (IV-V 2016); 2.Suiteáil fhótavoltach a thógáil — oibreacha tógála agus suiteála, lena n-áirítear: An láithreán a ullmhú le haghaidh tógála, Struchtúr tacaíochta do phainéil; Modúil agus inbhéartóirí; Sreangú; Lascthrealamh agus cosaint leictreach; Telemechanika agus slándáil; Suiteáil talún agus cúiteach; Dáta fálú an láithreáin — III-IX 2017; 3.Teaschaidéil a shuiteáil, lena náirítear: suiteáil teaschaidéal; téarma nua radaitheoirí:III-IX 6/44 2017r. 4.Maoirseacht ar infheisteoirí agus tionscadail a chur chun cinn, lena n-áirítear: costais mhaoirseachta, faisnéise agus cur chun cinn infheisteoirí (ceannach agus cóimeáil faisnéise agus boird chuimhneacháin) dáta: III-IX 2017r. Cuirfidh Bardas Płoty an tionscadal i bhfeidhm, a dhéanfaidh an tionscadal a bhainistiú ag an am céanna. Beidh an tionscadal á chur i bhfeidhm go díreach ag an mBainisteoir Tionscadail, ag feidhmiú faoi láthair mar Cheann na Roinne Forbartha Eacnamaíochta agus Infheistíochtaí Rialtais Áitiúil. Baill eile den fhoireann bainistíochta tionscadail: Sp.ds. socrú agus cur chun cinn an tionscadail agus an Sp Soláthair Phoiblí. (Irish)
Property / summary: Tá an tionscadal suite i Płoty, ag Sráid Koszalińska, i réimse an ghléasra cóireála fuíolluisce.Cuirfear an tionscadal i bhfeidhm i réimse na hIdirghabhála Straitéisí (SSW).Is é cuspóir an tionscadail suiteáil fhótavoltach a thógáil le cumhacht 300.16 kW agus teaschaidéil le cumhacht 60.10 kW.Déanfaidh inverters fuinneamh leictreach i bhfoirm srutha dhírigh arna dtáirgeadh ag cealla fótavoltacha a thiontú ina sruth ailtéarnach le voltas 400V, ansin trí líonra claochladáin chuig líonra leictreachais an iarratasóra. CÉIMEANNA CHUR CHUN FEIDHME AN TIONSCADAIL: 1. Ullmhú doiciméadú tionscadail lena n-áirítear: léarscáil chun críocha deartha, doiciméadacht tionscadail, staidéar féidearthachta (IV-V 2016); 2.Suiteáil fhótavoltach a thógáil — oibreacha tógála agus suiteála, lena n-áirítear: An láithreán a ullmhú le haghaidh tógála, Struchtúr tacaíochta do phainéil; Modúil agus inbhéartóirí; Sreangú; Lascthrealamh agus cosaint leictreach; Telemechanika agus slándáil; Suiteáil talún agus cúiteach; Dáta fálú an láithreáin — III-IX 2017; 3.Teaschaidéil a shuiteáil, lena náirítear: suiteáil teaschaidéal; téarma nua radaitheoirí:III-IX 6/44 2017r. 4.Maoirseacht ar infheisteoirí agus tionscadail a chur chun cinn, lena n-áirítear: costais mhaoirseachta, faisnéise agus cur chun cinn infheisteoirí (ceannach agus cóimeáil faisnéise agus boird chuimhneacháin) dáta: III-IX 2017r. Cuirfidh Bardas Płoty an tionscadal i bhfeidhm, a dhéanfaidh an tionscadal a bhainistiú ag an am céanna. Beidh an tionscadal á chur i bhfeidhm go díreach ag an mBainisteoir Tionscadail, ag feidhmiú faoi láthair mar Cheann na Roinne Forbartha Eacnamaíochta agus Infheistíochtaí Rialtais Áitiúil. Baill eile den fhoireann bainistíochta tionscadail: Sp.ds. socrú agus cur chun cinn an tionscadail agus an Sp Soláthair Phoiblí. (Irish) / rank
 
Normal rank
Property / summary: Tá an tionscadal suite i Płoty, ag Sráid Koszalińska, i réimse an ghléasra cóireála fuíolluisce.Cuirfear an tionscadal i bhfeidhm i réimse na hIdirghabhála Straitéisí (SSW).Is é cuspóir an tionscadail suiteáil fhótavoltach a thógáil le cumhacht 300.16 kW agus teaschaidéil le cumhacht 60.10 kW.Déanfaidh inverters fuinneamh leictreach i bhfoirm srutha dhírigh arna dtáirgeadh ag cealla fótavoltacha a thiontú ina sruth ailtéarnach le voltas 400V, ansin trí líonra claochladáin chuig líonra leictreachais an iarratasóra. CÉIMEANNA CHUR CHUN FEIDHME AN TIONSCADAIL: 1. Ullmhú doiciméadú tionscadail lena n-áirítear: léarscáil chun críocha deartha, doiciméadacht tionscadail, staidéar féidearthachta (IV-V 2016); 2.Suiteáil fhótavoltach a thógáil — oibreacha tógála agus suiteála, lena n-áirítear: An láithreán a ullmhú le haghaidh tógála, Struchtúr tacaíochta do phainéil; Modúil agus inbhéartóirí; Sreangú; Lascthrealamh agus cosaint leictreach; Telemechanika agus slándáil; Suiteáil talún agus cúiteach; Dáta fálú an láithreáin — III-IX 2017; 3.Teaschaidéil a shuiteáil, lena náirítear: suiteáil teaschaidéal; téarma nua radaitheoirí:III-IX 6/44 2017r. 4.Maoirseacht ar infheisteoirí agus tionscadail a chur chun cinn, lena n-áirítear: costais mhaoirseachta, faisnéise agus cur chun cinn infheisteoirí (ceannach agus cóimeáil faisnéise agus boird chuimhneacháin) dáta: III-IX 2017r. Cuirfidh Bardas Płoty an tionscadal i bhfeidhm, a dhéanfaidh an tionscadal a bhainistiú ag an am céanna. Beidh an tionscadal á chur i bhfeidhm go díreach ag an mBainisteoir Tionscadail, ag feidhmiú faoi láthair mar Cheann na Roinne Forbartha Eacnamaíochta agus Infheistíochtaí Rialtais Áitiúil. Baill eile den fhoireann bainistíochta tionscadail: Sp.ds. socrú agus cur chun cinn an tionscadail agus an Sp Soláthair Phoiblí. (Irish) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projektet är beläget i Płoty, vid Koszalińska gatan, inom området för avloppsreningsverk.Projektet kommer att genomföras inom området Strategisk intervention (SSW).Syftet med projektet är att bygga en solcellsanläggning med en effekt på 300,16 kW och värmepumpar med en effekt på 60,10 kW.Den elektriska energin i form av likström som produceras av fotovoltaiska celler kommer att omvandlas av växelriktare till växelström med en spänning på 400V, sedan med hjälp av ett transformatornät till sökandens elnät. ETAPPER I PROJEKTETS GENOMFÖRANDE: 1.Förberedelse av projektdokumentation inklusive: karta för utformningsändamål, projektdokumentation, genomförbarhetsstudie (IV-V 2016). 2.Konstruktion av en solcellsinstallation – byggnads- och installationsarbeten, inklusive: Förberedelse av byggplatsen, stödstruktur för paneler; Moduler och växelriktare. Ledningar; Ställverk och elektriskt skydd; Telemechanika och säkerhet; Anläggning för jordning och kompensation. Plats stängsel datum – III-IX 2017; 3.Installation av värmepumpar, inklusive: installation av värmepumpar; ersättning av radiatorer term: III-IX 6/44 2017r. 4.Investorsövervakning och främjande av projekt, inklusive: investerartillsyn, informations- och marknadsföringskostnader (inköp och sammanställning av information och minnesnämnder) datum: III-IX 2017r. Projektet kommer att genomföras av kommunen Płoty, som samtidigt kommer att leda projektet. Projektet kommer att genomföras direkt av projektledaren, som för närvarande är chef för avdelningen för ekonomisk utveckling och lokala investeringar. Övriga medlemmar i projektledningsgruppen: Sp.ds. uppgörelse och främjande av projektet och offentlig upphandling Sp. (Swedish)
Property / summary: Projektet är beläget i Płoty, vid Koszalińska gatan, inom området för avloppsreningsverk.Projektet kommer att genomföras inom området Strategisk intervention (SSW).Syftet med projektet är att bygga en solcellsanläggning med en effekt på 300,16 kW och värmepumpar med en effekt på 60,10 kW.Den elektriska energin i form av likström som produceras av fotovoltaiska celler kommer att omvandlas av växelriktare till växelström med en spänning på 400V, sedan med hjälp av ett transformatornät till sökandens elnät. ETAPPER I PROJEKTETS GENOMFÖRANDE: 1.Förberedelse av projektdokumentation inklusive: karta för utformningsändamål, projektdokumentation, genomförbarhetsstudie (IV-V 2016). 2.Konstruktion av en solcellsinstallation – byggnads- och installationsarbeten, inklusive: Förberedelse av byggplatsen, stödstruktur för paneler; Moduler och växelriktare. Ledningar; Ställverk och elektriskt skydd; Telemechanika och säkerhet; Anläggning för jordning och kompensation. Plats stängsel datum – III-IX 2017; 3.Installation av värmepumpar, inklusive: installation av värmepumpar; ersättning av radiatorer term: III-IX 6/44 2017r. 4.Investorsövervakning och främjande av projekt, inklusive: investerartillsyn, informations- och marknadsföringskostnader (inköp och sammanställning av information och minnesnämnder) datum: III-IX 2017r. Projektet kommer att genomföras av kommunen Płoty, som samtidigt kommer att leda projektet. Projektet kommer att genomföras direkt av projektledaren, som för närvarande är chef för avdelningen för ekonomisk utveckling och lokala investeringar. Övriga medlemmar i projektledningsgruppen: Sp.ds. uppgörelse och främjande av projektet och offentlig upphandling Sp. (Swedish) / rank
 
Normal rank
Property / summary: Projektet är beläget i Płoty, vid Koszalińska gatan, inom området för avloppsreningsverk.Projektet kommer att genomföras inom området Strategisk intervention (SSW).Syftet med projektet är att bygga en solcellsanläggning med en effekt på 300,16 kW och värmepumpar med en effekt på 60,10 kW.Den elektriska energin i form av likström som produceras av fotovoltaiska celler kommer att omvandlas av växelriktare till växelström med en spänning på 400V, sedan med hjälp av ett transformatornät till sökandens elnät. ETAPPER I PROJEKTETS GENOMFÖRANDE: 1.Förberedelse av projektdokumentation inklusive: karta för utformningsändamål, projektdokumentation, genomförbarhetsstudie (IV-V 2016). 2.Konstruktion av en solcellsinstallation – byggnads- och installationsarbeten, inklusive: Förberedelse av byggplatsen, stödstruktur för paneler; Moduler och växelriktare. Ledningar; Ställverk och elektriskt skydd; Telemechanika och säkerhet; Anläggning för jordning och kompensation. Plats stängsel datum – III-IX 2017; 3.Installation av värmepumpar, inklusive: installation av värmepumpar; ersättning av radiatorer term: III-IX 6/44 2017r. 4.Investorsövervakning och främjande av projekt, inklusive: investerartillsyn, informations- och marknadsföringskostnader (inköp och sammanställning av information och minnesnämnder) datum: III-IX 2017r. Projektet kommer att genomföras av kommunen Płoty, som samtidigt kommer att leda projektet. Projektet kommer att genomföras direkt av projektledaren, som för närvarande är chef för avdelningen för ekonomisk utveckling och lokala investeringar. Övriga medlemmar i projektledningsgruppen: Sp.ds. uppgörelse och främjande av projektet och offentlig upphandling Sp. (Swedish) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Projekt asub Płotys, Koszalińska tänaval reoveepuhasti piirkonnas.Projekt viiakse ellu strateegilise sekkumise (SSW) valdkonnas.Projekti objektiks on 300,16 kW võimsusega fotogalvaanilise seadme ja 60,10 kW võimsusega soojuspumpade ehitamine. PROJEKTI ELLUVIIMISE ETAPID: 1.Projekti dokumentatsiooni koostamine, sealhulgas: projekteerimisel kasutatav kaart, projekti dokumentatsioon, teostatavusuuring (IV-V 2016); Fotogalvaanilise paigalduse ehitamine – ehitus- ja paigaldustööd, sealhulgas: Ehitusplatsi ettevalmistamine, paneelide tugistruktuur; Moodulid ja inverterid; Juhtmestik; Jaotusseadmed ja elektrikaitse; Telemechanika ja turvalisus; Maandus- ja kompenseeriv paigaldus; Koht tara kuupäev – III-IX 2017; Soojuspumpade paigaldamine, sealhulgas: soojuspumpade paigaldamine; radiaatorite asendamine:III-IX 6/44 2017r. 4.Investorite järelevalve ja projektide edendamine, sealhulgas: investorite järelevalve, teavitamis- ja müügiedenduskulud (teabe ostmine ja kokkupanek ning mälestuskogud) kuupäev: III-IX 2017r. Projekti viib ellu Płoty omavalitsus, kes haldab samaaegselt projekti. Projekti viib ellu otse projektijuht, kes on praegu majandusarengu ja kohalike omavalitsuste investeeringute osakonna juhataja. Projektijuhtimise meeskonna teised liikmed: Projekti ja riigihangete Sp.ds. lahendamine ja edendamine (Estonian)
Property / summary: Projekt asub Płotys, Koszalińska tänaval reoveepuhasti piirkonnas.Projekt viiakse ellu strateegilise sekkumise (SSW) valdkonnas.Projekti objektiks on 300,16 kW võimsusega fotogalvaanilise seadme ja 60,10 kW võimsusega soojuspumpade ehitamine. PROJEKTI ELLUVIIMISE ETAPID: 1.Projekti dokumentatsiooni koostamine, sealhulgas: projekteerimisel kasutatav kaart, projekti dokumentatsioon, teostatavusuuring (IV-V 2016); Fotogalvaanilise paigalduse ehitamine – ehitus- ja paigaldustööd, sealhulgas: Ehitusplatsi ettevalmistamine, paneelide tugistruktuur; Moodulid ja inverterid; Juhtmestik; Jaotusseadmed ja elektrikaitse; Telemechanika ja turvalisus; Maandus- ja kompenseeriv paigaldus; Koht tara kuupäev – III-IX 2017; Soojuspumpade paigaldamine, sealhulgas: soojuspumpade paigaldamine; radiaatorite asendamine:III-IX 6/44 2017r. 4.Investorite järelevalve ja projektide edendamine, sealhulgas: investorite järelevalve, teavitamis- ja müügiedenduskulud (teabe ostmine ja kokkupanek ning mälestuskogud) kuupäev: III-IX 2017r. Projekti viib ellu Płoty omavalitsus, kes haldab samaaegselt projekti. Projekti viib ellu otse projektijuht, kes on praegu majandusarengu ja kohalike omavalitsuste investeeringute osakonna juhataja. Projektijuhtimise meeskonna teised liikmed: Projekti ja riigihangete Sp.ds. lahendamine ja edendamine (Estonian) / rank
 
Normal rank
Property / summary: Projekt asub Płotys, Koszalińska tänaval reoveepuhasti piirkonnas.Projekt viiakse ellu strateegilise sekkumise (SSW) valdkonnas.Projekti objektiks on 300,16 kW võimsusega fotogalvaanilise seadme ja 60,10 kW võimsusega soojuspumpade ehitamine. PROJEKTI ELLUVIIMISE ETAPID: 1.Projekti dokumentatsiooni koostamine, sealhulgas: projekteerimisel kasutatav kaart, projekti dokumentatsioon, teostatavusuuring (IV-V 2016); Fotogalvaanilise paigalduse ehitamine – ehitus- ja paigaldustööd, sealhulgas: Ehitusplatsi ettevalmistamine, paneelide tugistruktuur; Moodulid ja inverterid; Juhtmestik; Jaotusseadmed ja elektrikaitse; Telemechanika ja turvalisus; Maandus- ja kompenseeriv paigaldus; Koht tara kuupäev – III-IX 2017; Soojuspumpade paigaldamine, sealhulgas: soojuspumpade paigaldamine; radiaatorite asendamine:III-IX 6/44 2017r. 4.Investorite järelevalve ja projektide edendamine, sealhulgas: investorite järelevalve, teavitamis- ja müügiedenduskulud (teabe ostmine ja kokkupanek ning mälestuskogud) kuupäev: III-IX 2017r. Projekti viib ellu Płoty omavalitsus, kes haldab samaaegselt projekti. Projekti viib ellu otse projektijuht, kes on praegu majandusarengu ja kohalike omavalitsuste investeeringute osakonna juhataja. Projektijuhtimise meeskonna teised liikmed: Projekti ja riigihangete Sp.ds. lahendamine ja edendamine (Estonian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / location (string)
 
WOJ.: ZACHODNIOPOMORSKIE, POW.: gryficki
Property / location (string): WOJ.: ZACHODNIOPOMORSKIE, POW.: gryficki / rank
 
Normal rank
Property / priority axis
 
Property / priority axis: LOW-CARBON ECONOMY / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank
Property / coordinate location
 
53°56'35.30"N, 15°15'35.57"E
Latitude53.94314005
Longitude15.259880486631
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 53°56'35.30"N, 15°15'35.57"E / rank
 
Normal rank
Property / coordinate location: 53°56'35.30"N, 15°15'35.57"E / qualifier
 
Property / contained in NUTS
 
Property / contained in NUTS: Szczeciński / rank
 
Normal rank
Property / contained in NUTS: Szczeciński / qualifier
 
Property / end time
 
28 June 2019
Timestamp+2019-06-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / end time: 28 June 2019 / rank
 
Normal rank
Property / thematic objective
 
Property / thematic objective: Multiple Thematic Objective / rank
 
Normal rank
Property / thematic objective: Multiple Thematic Objective / qualifier
 
Property / thematic objective
 
Property / thematic objective: Low-carbon economy / rank
 
Normal rank
Property / date of last update
 
13 December 2023
Timestamp+2023-12-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / date of last update: 13 December 2023 / rank
 
Normal rank

Latest revision as of 05:46, 10 October 2024

Project Q137686 in Poland
Language Label Description Also known as
English
Construction of photovoltaic installations and heat pumps on waste water treatment plant in Płoty
Project Q137686 in Poland

    Statements

    0 references
    2,027,561.44 zloty
    0 references
    450,726.91 Euro
    13 January 2020
    0 references
    2,385,366.48 zloty
    0 references
    530,266.97 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    13 April 2016
    0 references
    28 June 2019
    0 references
    GMINA PŁOTY
    0 references
    0 references

    53°56'35.30"N, 15°15'35.57"E
    0 references
    Projekt ma charakter stacjonarny.Teren przeznaczony pod zabudowę zlokalizowany jest w m. Płoty,przy ulicy Koszalińskiej,na terenie oczyszczalni ścieków.Projekt realizowany będzie na obszarze Strategicznej Interwencji (SSW ).Przedmiotem projektu jest budowa instalacji fotowoltaicznej o mocy 300,16 kW oraz pomp ciepła o mocy 60,10 kW.Energia elektryczna w postaci prądu stałego produkowana przez ogniwa fotowoltaiczne będzie przekształcana przez falowniki na prąd zmienny o napięciu 400V,następnie za pomocą sieci transformatorowej do sieci elektroenergetycznej Wnioskodawcy.Przewiduje się budowę instalacji fotowoltaicznej montowanej na wolnostojącej konstrukcji stalowej,na stopach żelbetowych. ETAPY REALIZACJI PROJEKTU: 1.Przygotowanie dokumentacji projektu w tym: mapa do celów projektowych, dokumentacja projektowo-przetargowa, opracowanie studium wykonalności (IV-V 2016r); 2.Budowa instalacji fotowoltaicznej - prace budowlano-instalacyjne, w tym: Przygotowanie terenu pod budowę, Konstrukcja wsporcza pod panele; Moduły i inwertery; Okablowanie; Rozdzielnice i zabezpieczenia elektryczne; Telemechanika i zabezpieczenie; Instalacja uziemiająca i wyrównawcza; Ogrodzenie terenu termin - III-IX 2017; 3.Instalacja pomp ciepła, w tym: instalacja pomp ciepła; wymiana grzejników termin:III-IX 6 / 44 2017r. 4.Nadzór inwestorski i promocja projektu, w tym: nadzór inwestorski, koszty informacji i promocji (zakup i montaż tablic informacyjnej i pamiątkowej) termin:III-IX 2017r. Za realizację projektu odpowiedzialna będzie Gmina Płoty która jednocześnie będzie zarządzała projektem. Do wdrażanie projektu zaangażowany zostanie bezpośrednio Kierownik projektu pełniący obecnie funkcję kierownika Referatu Rozwoju Gospodarczego i Inwestycji Samorządowych. Pozostali członkowie zespołu zarządzającego proj.: Sp.ds. rozliczenia i promocji projektu oraz Sp. ds. zamówień publicznych.Obsługa księgowa projektu prowadzona będzie przez Skarbnika Gminy który współpraco (Polish)
    0 references
    The project will be implemented in the area of Strategic Intervention (SSW).The object of the project is the construction of a photovoltaic installation with a power of 300.16 kW and the heat pumps with a power of 60.10 kW.The electrical energy in the form of direct current produced by photovoltaic cells will be transformed by the inverter by the inverter on the alternating current. STAGES OF PROJECT IMPLEMENTATION: 1.Preparation of project documentation including: map for design purposes, design and tender documentation, feasibility study (IV-V 2016r); 2.Construction of photovoltaic installation – construction and installation works, including: Preparation of the site for construction, support structure for panels; Modules and inverters; Wiring; Switchgears and electrical protections; Telemechanics and security; Grounding and compensatory installation; Fence of the site term – III-IX 2017; 3.Installation of heat pumps, including: installation of heat pumps; exchange of radiators term:III-IX 6/44 2017r. 4.Investment supervision and project promotion, including: investor supervision, costs of information and promotion (purchase and installation of information and commemorative boards) deadline:III-IX 2017 The project will be carried out by the Municipality of Płota, which will simultaneously manage the project. The project manager, currently acting as Head of the Department of Economic Development and Local Government Investments, will be directly involved in the implementation of the project. Other members of the project management team: Sp.ds. settlement and promotion of the project and Sp. for public procurement.The accounting service of the project will be carried out by the Treasury of the Municipality who cooperates (English)
    21 October 2020
    0.5257713372285575
    0 references
    Le projet est situé à Płoty, rue Koszalińska, dans le secteur de la station d’épuration des eaux usées.Le projet sera mis en œuvre dans le domaine de l’intervention stratégique (SSW). Le projet a pour objet la construction d’une installation photovoltaïque d’une puissance de 300,16 kW et de pompes à chaleur d’une puissance de 60,10 kW.L’énergie électrique sous forme de courant continu produite par des cellules photovoltaïques sera convertie par des onduleurs en courant alternatif avec une tension de 400 V, puis au moyen d’un réseau de transformateurs vers le réseau électrique de la requérante. ÉTAPES DE LA MISE EN ŒUVRE DU PROJET: 1.Préparation de la documentation du projet, y compris: carte à des fins de conception, documentation de projet, étude de faisabilité (IV-V 2016); 2.Construction d’une installation photovoltaïque — travaux de construction et d’installation, y compris: Préparation du chantier pour la construction, Structure de support pour panneaux; Modules et onduleurs; Câblage; Appareillage de commutation et protection électrique; Telemechanika et sécurité; Mise à la terre et installation compensatoire; Date de clôture du site — III-IX 2017; 3.Installation des pompes à chaleur, y compris: installation de pompes à chaleur; remplacement du terme des radiateurs:III-IX 6/44 2017r. 4.La supervision des investisseurs et la promotion de projets, y compris: frais de supervision des investisseurs, d’information et de promotion (achat et assemblage de conseils d’information et de commémoration) date: III-IX 2017r. Le projet sera mis en œuvre par la municipalité de Płoty, qui gérera simultanément le projet. Le projet sera mis en œuvre directement par le gestionnaire de projet, actuellement chef du département du développement économique et des investissements des administrations locales. Autres membres de l’équipe de gestion du projet: Sp.ds. règlement et promotion du projet et de la Public Procurement Sp. (French)
    2 December 2021
    0 references
    Das Projekt befindet sich in Płoty, in der Straße Koszalińska, im Bereich der Abwasserbehandlungsanlage.Das Projekt wird im Bereich Strategische Intervention (SSW) durchgeführt.Ziel des Projekts ist der Bau einer Photovoltaikanlage mit einer Leistung von 300,16 kW und Wärmepumpen mit einer Leistung von 60,10 kW.Die elektrische Energie in Form von Gleichstrom aus Photovoltaik-Zellen wird von Wechselrichtern in Wechselstrom mit einer Spannung von 400 V, dann über ein Transformatornetz zum Stromnetz des Antragstellers umgewandelt. PHASEN DER PROJEKTDURCHFÜHRUNG: 1. Vorbereitung der Projektdokumentation einschließlich: Karte für Planungszwecke, Projektdokumentation, Machbarkeitsstudie (IV-V 2016); 2.Bau einer Photovoltaikanlage – Bau- und Installationsarbeiten, einschließlich: Vorbereitung der Baustelle für den Bau, Stützstruktur für Paneele; Module und Wechselrichter; Verdrahtung; Schaltanlagen und elektrischer Schutz; Telemechanika und Sicherheit; Erdungs- und Ausgleichsanlagen; Standort Zaun Datum – III-IX 2017; 3. Installation von Wärmepumpen, einschließlich: Installation von Wärmepumpen; Ersatz des Heizkörperbegriffs:III-IX 6/44 2017r. 4.Investor-Überwachung und Projektförderung, einschließlich: Anlegeraufsicht, Informations- und Werbekosten (Kauf und Montage von Informations- und Gedenktafeln) Datum: III-IX 2017r. Das Projekt wird von der Gemeinde Płoty durchgeführt, die das Projekt gleichzeitig verwaltet. Das Projekt wird direkt vom Projektmanager durchgeführt, der derzeit als Leiter der Abteilung für wirtschaftliche Entwicklung und Investitionen der lokalen Gebietskörperschaften fungiert. Weitere Mitglieder des Projektmanagement-Teams: Sp.ds. Abwicklung und Förderung des Projekts und der Public Procurement Sp. (German)
    13 December 2021
    0 references
    Het project bevindt zich in Płoty, aan de straat Koszalińska, op het gebied van afvalwaterzuiveringsinstallatie.Het project zal worden uitgevoerd op het gebied van Strategische Interventie (SSW).Het doel van het project is de bouw van een fotovoltaïsche installatie met een vermogen van 300,16 kW en warmtepompen met een vermogen van 60,10 kW.De elektrische energie in de vorm van gelijkstroom geproduceerd door fotovoltaïsche cellen zal door omvormers worden omgezet in wisselstroom met een spanning van 400V, vervolgens door middel van een transformatornetwerk naar het elektriciteitsnetwerk van verzoekster. FASEN VAN DE UITVOERING VAN HET PROJECT: 1.Voorbereiding van projectdocumentatie met inbegrip van: kaart voor ontwerpdoeleinden, projectdocumentatie, haalbaarheidsstudie (IV-V 2016); 2.Bouw van een fotovoltaïsche installatie — bouw- en installatiewerkzaamheden, waaronder: Voorbereiding van de bouwplaats, Steunstructuur voor panelen; Modules en omvormers; Bedrading; Schakelinrichtingen en elektrische bescherming; Telemechanika en beveiliging; Aardings- en compenserende installatie; Site hekdatum — III-IX 2017; 3.Installation van warmtepompen, met inbegrip van: installatie van warmtepompen; vervanging van radiatoren term:III-IX 6/44 2017r. 4.Investor supervisie en project promotie, met inbegrip van: beleggerstoezicht, informatie- en promotiekosten (aankoop en montage van informatie- en herdenkingsborden) datum: III-IX 2017r. Het project zal worden uitgevoerd door de gemeente Płoty, die het project tegelijkertijd zal beheren. Het project zal rechtstreeks worden uitgevoerd door de projectmanager, die momenteel optreedt als hoofd van de afdeling Economische Ontwikkeling en Investeringen van lokale overheden. Andere leden van het projectmanagementteam: Sp.ds. afwikkeling en promotie van het project en de overheidsopdrachten Sp. (Dutch)
    17 December 2021
    0 references
    Il progetto si trova a Płoty, in via Koszalińska, nell'area dell'impianto di trattamento delle acque reflue.Il progetto sarà attuato nell'area di intervento strategico (SSW).L'obiettivo del progetto è la costruzione di un impianto fotovoltaico con una potenza di 300,16 kW e pompe di calore con una potenza di 60,10 kW.L'energia elettrica sotto forma di corrente continua prodotta da celle fotovoltaiche sarà convertita da inverter in corrente alternata con una tensione di 400V, quindi mediante una rete di trasformatori alla rete elettrica del richiedente. FASI DI ATTUAZIONE DEL PROGETTO: 1.Preparazione della documentazione del progetto, tra cui: mappa per finalità progettuali, documentazione progettuale, studio di fattibilità (IV-V 2016); 2.Costruzione di un impianto fotovoltaico — lavori di costruzione e installazione, tra cui: Preparazione del cantiere per la costruzione, Struttura di supporto per pannelli; Moduli e inverter; Cablaggio; Quadri elettrici e protezione elettrica; Telemechanika e sicurezza; Messa a terra e installazione compensativa; Data di recinzione del sito — III-IX 2017; 3.Installazione di pompe di calore, tra cui: installazione di pompe di calore; sostituzione dei radiatori termine:III-IX 6/44 2017r. Supervisione 4.Investor e promozione del progetto, tra cui: supervisione degli investitori, costi di informazione e promozione (acquisto e assemblaggio di informazioni e commissioni commemorative) data: III-IX 2017r. Il progetto sarà attuato dal Comune di Płoty, che contemporaneamente gestirà il progetto. Il progetto sarà attuato direttamente dal Project Manager, attualmente in qualità di Responsabile del Dipartimento per lo Sviluppo Economico e gli Investimenti Locali. Altri membri del team di gestione del progetto: Sp.ds. liquidazione e promozione del progetto e del Public Procurement Sp. (Italian)
    15 January 2022
    0 references
    El proyecto se encuentra en Płoty, en la calle Koszalińska, en el área de la planta de tratamiento de aguas residuales.El proyecto se implementará en el área de Intervención Estratégica (SSW).El objetivo del proyecto es la construcción de una instalación fotovoltaica con una potencia de 300,16 kW y bombas de calor con una potencia de 60,10 kW. La energía eléctrica en forma de corriente directa producida por las células fotovoltaicas se convertirá por inversores en corriente alterna con una tensión de 400 V, luego mediante una red de transformadores a la red eléctrica del solicitante. ETAPAS DE EJECUCIÓN DEL PROYECTO: 1.Preparación de la documentación del proyecto, que incluye: mapa para fines de diseño, documentación del proyecto, estudio de viabilidad (IV-V 2016); 2.Construcción de una instalación fotovoltaica — obras de construcción e instalación, incluyendo: Preparación del sitio para la construcción, Estructura de apoyo para paneles; Módulos e inversores; Cableado; Equipos de conmutación y protección eléctrica; Telemechanika y seguridad; Puesta a tierra e instalación compensatoria; Fecha de la valla del sitio — III-IX 2017; 3. Instalación de bombas de calor, incluyendo: instalación de bombas de calor; sustitución del término de los radiadores:III-IX 6/44 2017r. 4.Inversor supervisión y promoción de proyectos, incluyendo: supervisión del inversor, información y costes de promoción (compra y ensamblaje de información y juntas conmemorativas) fecha: III-IX 2017r. El proyecto será ejecutado por el Municipio de Płoty, que gestionará simultáneamente el proyecto. El proyecto será ejecutado directamente por el Gerente del Proyecto, que actualmente actúa como Jefe del Departamento de Desarrollo Económico e Inversiones de Gobierno Local. Otros miembros del equipo de gestión del proyecto: Sp.ds. liquidación y promoción del proyecto y de la contratación pública Sp. (Spanish)
    19 January 2022
    0 references
    Projektet er beliggende i Płoty, på Koszalińska Street, i området spildevandsrensningsanlæg.Projektet vil blive gennemført inden for strategisk intervention (SSW).Formålet med projektet er opførelse af et solcelleanlæg med en effekt på 300,16 kW og varmepumper med en effekt på 60,10 kW.Den elektriske energi i form af direkte strøm produceret af solceller vil blive omdannet af omformere til vekselstrøm med en spænding på 400 V, derefter ved hjælp af et transformernetværk til ansøgerens elnet. FASER AF PROJEKTGENNEMFØRELSEN: 1.Udarbejdelse af projektdokumentation, herunder: kort til designformål, projektdokumentation, gennemførlighedsundersøgelse (IV-V 2016) 2.Opførelse af et solcelleanlæg — bygge- og anlægsarbejde, herunder: Forberedelse af byggepladsen, støttestruktur til paneler; Moduler og invertere; Ledninger; Koblingsudstyr og elektrisk beskyttelse; Telemechanika og sikkerhed Jordforbindelse og kompenserende installation Dato for indhegning af arealet — III-IX 2017; 3. Installation af varmepumper, herunder: installation af varmepumper; udskiftning af radiatorer sigt:III-IX 6/44 2017r. 4.Investortilsyn og projektfremme, herunder: udgifter til tilsyn med investorer, oplysningskampagner og salgsfremstød (køb og samling af informations- og erindringstavler) dato: III-IX 2017r. Projektet vil blive gennemført af kommunen Płoty, som samtidig skal forvalte projektet. Projektet vil blive gennemført direkte af projektlederen, der i øjeblikket fungerer som leder af Institut for Økonomisk Udvikling og Lokale Offentlige Investeringer. Andre medlemmer af projektledelsen: Sp.ds. afvikling og fremme af projektet og offentlige indkøb Sp. (Danish)
    3 July 2022
    0 references
    Το έργο βρίσκεται στο Płoty, στην οδό Koszalińska, στην περιοχή του σταθμού επεξεργασίας λυμάτων.Το έργο θα υλοποιηθεί στον τομέα της Στρατηγικής Παρέμβασης (SSW).Στόχος του έργου είναι η κατασκευή φωτοβολταϊκής εγκατάστασης ισχύος 300,16 kW και αντλιών θερμότητας ισχύος 60,10 kW.Η ηλεκτρική ενέργεια υπό μορφή συνεχούς ρεύματος που παράγεται από φωτοβολταϊκές κυψέλες θα μετατραπεί από μετατροπείς σε εναλλασσόμενο ρεύμα με τάση 400V, στη συνέχεια μέσω δικτύου μετασχηματιστών στο δίκτυο ηλεκτρικής ενέργειας του αιτούντος. ΣΤΆΔΙΑ ΥΛΟΠΟΊΗΣΗΣ ΤΟΥ ΈΡΓΟΥ: 1.Προετοιμασία της τεκμηρίωσης του έργου που περιλαμβάνει: Χάρτης για σκοπούς σχεδιασμού, τεκμηρίωση του έργου, μελέτη σκοπιμότητας (IV-V 2016)· 2.Κατασκευή φωτοβολταϊκής εγκατάστασης — εργασίες κατασκευής και εγκατάστασης, συμπεριλαμβανομένων: Προετοιμασία του εργοταξίου για την κατασκευή, Δομή υποστήριξης για πάνελ? Δομοστοιχεία και μετατροπείς· Καλωδίωση; Εξοπλισμός μεταγωγής και ηλεκτρική προστασία· Telemechanika και ασφάλεια· Γείωση και αντισταθμιστική εγκατάσταση? Ημερομηνία περίφραξης τοποθεσίας — III-IX 2017; 3.Εγκατάσταση αντλιών θερμότητας, συμπεριλαμβανομένων: εγκατάσταση αντλιών θερμότητας· αντικατάσταση του όρου θερμαντικών σωμάτων:III-IX 6/44 2017r. 4. Εποπτεία επενδυτών και προώθηση έργων, συμπεριλαμβανομένων: τα έξοδα εποπτείας, ενημέρωσης και προώθησης των επενδυτών (αγορά και συγκέντρωση ενημερωτικών και αναμνηστικών συμβουλίων) ημερομηνία: III-IX 2017r. Το έργο θα υλοποιηθεί από τον Δήμο Płoty, ο οποίος θα διαχειρίζεται ταυτόχρονα το έργο. Το έργο θα υλοποιηθεί απευθείας από τον Υπεύθυνο Συντονιστή, ο οποίος επί του παρόντος ενεργεί ως Προϊστάμενος του Τμήματος Οικονομικής Ανάπτυξης και Επενδύσεων Τοπικής Αυτοδιοίκησης. Άλλα μέλη της ομάδας διαχείρισης του έργου: Sp.ds. διευθέτηση και προώθηση του έργου και της Δημόσιων Συμβάσεων Sp. (Greek)
    3 July 2022
    0 references
    Projekt se nalazi u Płotyu, u Koszalińskoj ulici, na području postrojenja za pročišćavanje otpadnih voda.Projekt će se provoditi na području Strateške intervencije (SSW). Cilj projekta je izgradnja fotonaponske instalacije snage 300,16 kW i dizalice topline snage 60,10 kW.Električna energija u obliku istosmjerne struje koju proizvode fotonaponske ćelije pretvarat će se pretvaračima u izmjeničnu struju napona od 400 V, a zatim pomoću mreže transformatora do tužiteljeve elektroenergetske mreže. FAZE PROVEDBE PROJEKTA: 1.Priprema projektne dokumentacije uključujući: karta za potrebe projektiranja, projektna dokumentacija, studija izvedivosti (IV-V 2016); 2.Izgradnja fotonaponske instalacije – građevinski i instalacijski radovi, uključujući: Priprema gradilišta, potporna struktura za ploče; Moduli i pretvarači; Ožičenje; Rasklopna postrojenja i električna zaštita; Telemechanika i sigurnost; Uzemljenje i kompenzacijska instalacija; Datum ograde lokacije – III.-IX. 2017.; 3.Ugradnja toplinskih crpki, uključujući: ugradnja toplinskih crpki; zamjena radijatora naziv: III-IX 6/44 2017r. 4.Nadzor ulagača i promicanje projekata, uključujući: nadzor ulagatelja, troškovi informiranja i promocije (kupnja i sastavljanje informacija i komemorativni odbori) datum: III – IX 2017r. Projekt će provoditi Općina Płoty, koja će istodobno upravljati projektom. Projekt će izravno provoditi voditelj projekta, koji trenutačno djeluje kao voditelj Odjela za gospodarski razvoj i ulaganja lokalne uprave. Ostali članovi tima za upravljanje projektima: Nagodba i promocija projekta i javne nabave Sp. (Croatian)
    3 July 2022
    0 references
    Proiectul este situat în Płoty, pe strada Koszalińska, în zona stației de epurare a apelor uzate.Proiectul va fi implementat în domeniul intervenției strategice (SSW). Obiectivul proiectului este construirea unei instalații fotovoltaice cu o putere de 300,16 kW și pompe de căldură cu o putere de 60,10 kW. Energia electrică sub formă de curent continuu produsă de celulele fotovoltaice va fi transformată prin invertoare în curent alternativ cu o tensiune de 400V, apoi prin intermediul unei rețele de transformatoare la rețeaua de energie electrică a solicitantului. ETAPELE DE IMPLEMENTARE A PROIECTULUI: 1.Pregătirea documentației proiectului, inclusiv: harta în scopuri de proiectare, documentația proiectului, studiul de fezabilitate (IV-V 2016); 2.Construirea unei instalații fotovoltaice – lucrări de construcție și instalare, inclusiv: Pregătirea șantierului pentru construcții, Structura suport pentru panouri; Module și invertoare; Cabluri; Dispozitive de comutație și protecție electrică; Telemechanika și securitate; Instalații de împământare și de compensare; Data gardului – III-IX 2017; 3.Instalarea pompelor de căldură, inclusiv: instalarea pompelor de căldură; termenul de înlocuire a radiatoarelor:III-IX 6/44 2017r. 4. Supravegherea investitorilor și promovarea proiectelor, inclusiv: costurile de supraveghere, informare și promovare a investitorilor (achiziționarea și asamblarea de informații și consilii comemorative) data: III-IX 2017r. Proiectul va fi implementat de municipalitatea Płoty, care va gestiona simultan proiectul. Proiectul va fi implementat direct de către managerul de proiect, în prezent în calitate de șef al Departamentului de Dezvoltare Economică și Investiții Guvernamentale Locale. Alți membri ai echipei de management de proiect: Soluționarea și promovarea proiectului și a Achizițiilor Publice Sp. (Romanian)
    3 July 2022
    0 references
    Projekt sa nachádza v Płoty, na Koszalińskej ulici, v oblasti čistiarne odpadových vôd.Projekt bude realizovaný v oblasti strategickej intervencie (SSW). Cieľom projektu je výstavba fotovoltickej inštalácie s výkonom 300,16 kW a tepelných čerpadiel s výkonom 60,10 kW.Elektrická energia vo forme jednosmerného prúdu vyrábaného fotovoltaickými článkami bude premenená meničmi na striedavý prúd s napätím 400V, potom prostredníctvom transformačnej siete do elektrickej siete žiadateľa. FÁZY REALIZÁCIE PROJEKTU: 1.Príprava projektovej dokumentácie vrátane: mapa na účely návrhu, projektová dokumentácia, štúdia uskutočniteľnosti (IV-V 2016); 2.Výstavba fotovoltaickej inštalácie – stavebné a inštalačné práce vrátane: Príprava areálu na výstavbu, podporná konštrukcia pre panely; Moduly a meniče; Elektroinštalácia; Rozvádzače a elektrická ochrana; Telemechanika a bezpečnosť; Uzemnenie a kompenzačné zariadenie; Dátum plotu – III-IX 2017; 3.Inštalácia tepelných čerpadiel, vrátane: inštalácia tepelných čerpadiel; nahradenie radiátorov termín:III-IX 6/44 2017r. 4.Investor dohľad a propagácia projektu, vrátane: dohľad investorov, náklady na informácie a propagáciu (nákup a montáž informácií a pamätných rád) dátum: III-IX 2017r. Projekt bude realizovať obec Płoty, ktorá bude zároveň riadiť projekt. Projekt bude realizovaný priamo projektovým manažérom, ktorý v súčasnosti pôsobí ako vedúci oddelenia pre hospodársky rozvoj a investície miestnej samosprávy. Ďalší členovia tímu projektového manažmentu: Sp.ds. vyrovnanie a propagácia projektu a verejného obstarávania Sp. (Slovak)
    3 July 2022
    0 references
    Il-proġett jinsab fi Płoty, fi Triq Koszalińska, fiż-żona tal-impjant tat-trattament tal-ilma mormi. Il-proġett se jiġi implimentat fil-qasam tal-Intervent Strateġiku (SSW). L-għan tal-proġett huwa l-kostruzzjoni ta’ installazzjoni fotovoltajka b’enerġija ta’ 300.16 kW u pompi tas-sħana b’enerġija ta’ 60.10 kW. L-enerġija elettrika fil-forma ta’ kurrent dirett prodotta minn ċelloli fotovoltajċi se tiġi kkonvertita minn invertituri f’kurrent alternanti b’vultaġġ ta’ 400V, imbagħad permezz ta’ netwerk ta’ transformer għan-netwerk tal-elettriku tal-applikant. STADJI TAL-IMPLIMENTAZZJONI TAL-PROĠETT: 1.Preparazzjoni tad-dokumentazzjoni tal-proġett inkluż: mappa għal skopijiet ta’ disinn, dokumentazzjoni tal-proġett, studju ta’ fattibbiltà (IV-V 2016); 2.Kostruzzjoni ta’ installazzjoni fotovoltajka — xogħlijiet ta’ kostruzzjoni u installazzjoni, inklużi: Tħejjija tas-sit għall-kostruzzjoni, Struttura ta’ appoġġ għall-pannelli; Moduli u invertituri; Sistemi ta’ wajers; Switchgear u protezzjoni elettrika; It-Telemechanika u s-sigurtà; Ertjar u installazzjoni kompensatorja; Data taċ-ċint tas-sit — III-IX 2017; 3.Installazzjoni ta’ pompi tas-sħana, inklużi: installazzjoni ta’ pompi tas-sħana; sostituzzjoni tat-terminu tar-radjaturi:III-IX 6/44 2017r. 4.Is-superviżjoni tal-investituri u l-promozzjoni tal-proġett, inklużi: is-superviżjoni tal-investituri, l-ispejjeż tal-informazzjoni u tal-promozzjoni (ix-xiri u l-assemblaġġ tal-informazzjoni u l-bordijiet kommemorattivi): III-IX 2017r. Il-proġett ser jiġi implimentat mill-Muniċipalità ta’ Płoty, li fl-istess ħin ser tmexxi l-proġett. Il-proġett se jiġi implimentat direttament mill-Maniġer tal-Proġett, li bħalissa qed jaġixxi bħala Kap tad-Dipartiment tal-Iżvilupp Ekonomiku u l-Investimenti tal-Gvern Lokali. Membri oħra tat-tim tal-ġestjoni tal-proġett: Is-soluzzjoni ta’ Sp.ds. u l-promozzjoni tal-proġett u l-Isp. tal-Akkwist Pubbliku (Maltese)
    3 July 2022
    0 references
    O projecto será implementado na área de Intervenção Estratégica (SSW).O objecto do projecto é a construção de uma instalação fotovoltaica com uma potência de 300,16 kW e as bombas de calor com uma potência de 60,10 kW.A energia eléctrica sob a forma de corrente contínua produzida por células fotovoltaicas será transformada pelo inversor pelo inversor na corrente alternada. ETAPAS DE EXECUÇÃO DO PROJETO: 1.Preparação da documentação do projeto, incluindo: mapa para efeitos de conceção, conceção e documentação do concurso, estudo de viabilidade (IV-V 2016r); 2.Construção de instalações fotovoltaicas – trabalhos de construção e instalação, incluindo: Preparação do local para a construção, estrutura de apoio para painéis; Módulos e inversores; Fiação; Mecanismos de comutação e proteções elétricas; Telemecânica e segurança; Instalação de ligação à terra e de compensação; Vedação do termo do sítio – III-IX 2017; 3.Instalação de bombas de calor, incluindo: instalação de bombas de calor; troca de termos de radiadores:III-IX 6/44 2017r. 4.Supervisão do investimento e promoção de projetos, incluindo: supervisão dos investidores, custos de informação e promoção (compra e instalação de quadros informativos e comemorativos) prazo:III-IX 2017 O projeto será realizado pelo município de Płota, que gerirá simultaneamente o projeto. O gestor do projeto, que atua atualmente como chefe do Departamento de Desenvolvimento Económico e Investimentos da Administração Local, estará diretamente envolvido na execução do projeto. Outros membros da equipa de gestão do projeto: Sp.ds. liquidação e promoção do projeto e Sp. para contratos públicos. O serviço de contabilidade do projeto será realizado pelo Tesouro do Município, que coopera (Portuguese)
    3 July 2022
    0 references
    Hanke sijaitsee Płotyssa, Koszalińska-kadulla, jätevedenpuhdistamon alueella.Hanke toteutetaan strategisen intervention (SSW) alueella.Hankkeen tavoitteena on rakentaa aurinkosähkölaitos, jonka teho on 300,16 kW, ja lämpöpumput, joiden teho on 60,10 kW.Valtosähkökennojen tuottama sähköenergia muunnetaan vaihtovirraksi 400 V:n jännitteellä ja sitten kantajan sähköverkkoon muuntajaverkolla. HANKKEEN TOTEUTUKSEN VAIHEET: 1. Hankeasiakirjojen valmistelu, mukaan lukien: kartta suunnittelua varten, hankedokumentaatio, toteutettavuustutkimus (IV-V 2016); 2. Aurinkosähkölaitteiston rakentaminen – rakennus- ja asennustyöt, mukaan lukien: Rakennuspaikan valmistelu, paneelien tukirakenne; Moduulit ja invertterit; Johdotus; Kytkinlaitteet ja sähkösuojaus; Telemechanika ja turvallisuus; Maadoitus ja korvaava asennus; Sivuston aita päivämäärä – III-IX 2017; 3. Lämpöpumppujen asennus, mukaan lukien: lämpöpumppujen asennus; lämpöpatterien korvaaminen termi:III-IX 6/44 2017r. 4.Investorin valvonta ja hankkeiden edistäminen, mukaan lukien: sijoittajan valvonta-, tiedotus- ja menekinedistämiskustannukset (tiedon hankinta ja kokoaminen sekä muistolautakunnat) päivämäärä: III-IX 2017r. Hankkeen toteuttaa Płotyn kunta, joka hallinnoi hanketta samanaikaisesti. Hankkeen toteuttaa suoraan projektipäällikkö, joka toimii tällä hetkellä taloudellisen kehityksen ja paikallishallinnon investointien osaston päällikkönä. Muut projektinjohtoryhmän jäsenet: Sp.ds. selvitys ja edistäminen hankkeen ja julkisten hankintojen Sp. (Finnish)
    3 July 2022
    0 references
    Projekt se nahaja v Płotyju, na Koszaliński ulici, na področju čistilne naprave za odpadne vode.Projekt se bo izvajal na področju strateškega posredovanja (SSW). Cilj projekta je gradnja fotonapetostne naprave z močjo 300,16 kW in toplotnih črpalk z močjo 60,10 kW.Električna energija v obliki enosmernega toka, ki ga proizvajajo fotovoltaične celice, bodo pretvorniki pretvorili v izmenični tok z napetostjo 400V, nato pa s transformatorskim omrežjem v električno omrežje vlagatelja. FAZE IZVAJANJA PROJEKTA: 1.Priprava projektne dokumentacije, vključno z: zemljevid za namene načrtovanja, projektna dokumentacija, študija izvedljivosti (IV-V 2016); 2.Izgradnja fotonapetostne instalacije – gradbena in inštalacijska dela, vključno z: Priprava gradbišča za gradnjo, podporna konstrukcija za plošče; Moduli in inverterji; Ožičenje; Stikalne naprave in električna zaščita; Telemechanika in varnost; Ozemljitev in kompenzacijska namestitev; Datum ograje mesta – III-IX 2017; 3. Vgradnja toplotnih črpalk, vključno z: namestitev toplotnih črpalk; zamenjava izraza radiatorjev:III-IX 6/44 2017r. 4.nadzor investitorjev in promocija projektov, vključno z: nadzor vlagateljev, stroški informiranja in promocije (nakup in montaža informativnih in spominskih desk) datum: III-IX 2017r. Projekt bo izvajala občina Płoty, ki bo projekt hkrati upravljala. Projekt bo neposredno izvajal vodja projekta, ki trenutno deluje kot vodja oddelka za gospodarski razvoj in naložbe lokalne uprave. Drugi člani projektne ekipe: Sp.ds. poravnava in promocija projekta in javnega naročanja Sp. (Slovenian)
    3 July 2022
    0 references
    Projekt se nachází v Płoty, v ulici Koszalińska, v oblasti čistírny odpadních vod.Projekt bude realizován v oblasti strategické intervence (SSW).Cílem projektu je výstavba fotovoltaického zařízení o výkonu 300,16 kW a tepelných čerpadel o výkonu 60,10 kW.Elektrická energie ve formě stejnosměrného proudu vyráběného fotovoltaickými články bude přeměněna měniči na střídavý proud s napětím 400V, poté prostřednictvím transformátorové sítě do elektrické sítě žalobkyně. FÁZE REALIZACE PROJEKTU: 1.Příprava projektové dokumentace včetně: mapa pro účely návrhu, projektová dokumentace, studie proveditelnosti (IV-V 2016); 2.Výstavba fotovoltaické instalace – stavební a instalační práce, včetně: Příprava lokality pro výstavbu, Podpůrná konstrukce pro panely; Moduly a měniče; Elektroinstalace; Rozvaděče a elektrická ochrana; Telemechanika a bezpečnost; Uzemnění a kompenzační zařízení; Datum oplocení pozemku – III-IX 2017; 3.Instalace tepelných čerpadel, včetně: instalace tepelných čerpadel; termín nahrazení radiátorů:III-IX 6/44 2017r. 4. Investorský dohled a propagace projektů, včetně: dohled investorů, náklady na informace a propagaci (nákup a montáž informačních a pamětních rad) datum: III-IX 2017r. Projekt bude realizován obcí Płoty, která bude projekt současně řídit. Projekt bude realizován přímo projektovým manažerem, který v současné době působí jako vedoucí odboru hospodářského rozvoje a místních vládních investic. Další členové týmu projektového managementu: Sp.ds. vypořádání a propagace projektu a veřejných zakázek Sp. (Czech)
    3 July 2022
    0 references
    Projektas vykdomas Płoty, Koszalińska gatvėje, nuotekų valymo įrenginio srityje.Projektas bus įgyvendinamas Strateginės intervencijos (SSW) srityje.Projekto objektas – 300,16 kW galios fotoelektros įrenginio ir 60,10 kW galios šilumos siurblių statyba.Elektros energija fotovoltinių elementų gaminamos nuolatinės srovės forma bus konvertuojama inverteriais į kintamąją 400V įtampos srovę, tada pareiškėjo elektros tinklui transformuojant transformatorių tinklą. PROJEKTO ĮGYVENDINIMO ETAPAI: 1.Projekto dokumentų rengimas, įskaitant: projektavimo tikslų žemėlapis, projekto dokumentacija, galimybių studija (IV-V 2016); 2. Fotoelektros instaliacijos statyba – statybos ir montavimo darbai, įskaitant: Statybvietės paruošimas statybai, plokščių atraminė konstrukcija; Moduliai ir inverteriai; Elektros instaliacijos; Skirstomieji įrenginiai ir elektros apsauga; Telemechanika ir saugumas; Įžeminimo ir kompensacinių įrenginių; Aikštelės tvoros data – 2017 m. III-IX; 3. Šilumos siurblių įrengimas, įskaitant: šilumos siurblių įrengimas; radiatorių keitimas: III-IX 6/44 2017r. 4.Investuotojų priežiūra ir projektų skatinimas, įskaitant: investuotojų priežiūros, informavimo ir skatinimo išlaidos (informacijos ir atminimo lentų pirkimas ir surinkimas) data: III-IX 2017r. Projektą įgyvendins Płoty savivaldybė, kuri tuo pačiu metu valdys projektą. Projektą tiesiogiai įgyvendins projektų vadovas, šiuo metu einantis Ekonominės plėtros ir vietos valdžios investicijų departamento vadovo pareigas. Kiti projekto valdymo grupės nariai: Sp.ds. atsiskaitymas už projektą ir jo skatinimas bei Viešieji pirkimai Sp. (Lithuanian)
    3 July 2022
    0 references
    Projekts atrodas Płoty, Koszalińska ielā, notekūdeņu attīrīšanas iekārtas teritorijā.Projekts tiks īstenots stratēģiskās iejaukšanās (SSW) jomā.Projekta objekts ir fotoelementu iekārtas ar jaudu 300,16 kW un siltumsūkņu ar jaudu 60,10 kW būvniecība.Elektroenerģiju līdzstrāvas veidā, ko ražo fotoelementi, invertori pārveidos maiņstrāvā ar spriegumu 400 V, pēc tam ar transformatoru tīklu prasītājas elektrotīklā. PROJEKTA ĪSTENOŠANAS POSMI: 1.Projekta dokumentācijas sagatavošana, tostarp: karte projektēšanas vajadzībām, projekta dokumentācija, priekšizpēte (IV-V 2016); 2.Būvelementu instalācijas būvniecība — celtniecības un uzstādīšanas darbi, tai skaitā: Būvlaukuma sagatavošana būvniecībai, paneļu atbalsta struktūra; Moduļi un invertori; Elektroinstalācija; Sadales iekārtas un elektriskā aizsardzība; Telemechanika un drošība; Zemējuma un kompensācijas uzstādīšana; Teritorijas nožogojuma datums — III-IX 2017; 3.siltumsūkņu uzstādīšana, tai skaitā: siltumsūkņu uzstādīšana; radiatoru termina nomaiņa:III-IX 6/44 2017r. 4.Ieguldītāju uzraudzība un projektu veicināšana, tostarp: investoru uzraudzības, informācijas un veicināšanas izmaksas (informācijas un piemiņas padomju iegāde un montāža) datums: III-IX 2017r. Projektu īstenos Płoty pašvaldība, kas vienlaikus pārvaldīs projektu. Projektu īstenos tieši projekta vadītājs, kas pašlaik darbojas kā Ekonomikas attīstības un pašvaldību investīciju departamenta vadītājs. Citi projekta vadības komandas locekļi: Sp.ds. projekta nokārtošana un veicināšana un publiskais iepirkums Sp. (Latvian)
    3 July 2022
    0 references
    Проектът се намира в Płoty, на улица Koszalińska, в областта на пречиствателната станция за отпадъчни води.Проектът ще бъде изпълнен в областта на стратегическата интервенция (SSW). Целта на проекта е изграждането на фотоволтаична инсталация с мощност 300,16 kW и термопомпи с мощност 60,10 kW.Електрическата енергия под формата на постоянен ток, произвеждан от фотоволтаични клетки, ще бъде преобразувана от инвертори в променлив ток с напрежение 400V, а след това чрез трансформаторна мрежа към електрическата мрежа на заявителя. ЕТАПИ НА ИЗПЪЛНЕНИЕ НА ПРОЕКТА: 1.Изготвяне на проектна документация, включваща: карта за проектни цели, проектна документация, проучване за осъществимост (IV-V 2016 г.); 2.Изграждане на фотоволтаична инсталация — строителни и монтажни работи, включително: Подготовка на площадката за строителство, Поддръжка на панели; Модули и инвертори; Окабеляване; Комутационна апаратура и електрическа защита; Телемеханика и охрана; Заземяване и компенсаторна инсталация; Дата на оградата на обекта — III-IX 2017 г.; 3.Инсталиране на термопомпи, включително: монтаж на термопомпи; подмяна на радиатори термин:III-IX 6/44 2017r. 4.Наблюдение на инвеститорите и популяризиране на проекти, включително: инвеститорски надзор, разходи за информиране и насърчаване (закупуване и сглобяване на информация и възпоменателни табла) дата: III-IX 2017r. Проектът ще се изпълнява от Община Плоти, която едновременно ще управлява проекта. Проектът ще се изпълнява пряко от ръководителя на проекта, понастоящем като ръководител на отдел „Икономическо развитие и инвестиции на местното самоуправление“. Други членове на екипа за управление на проекта: Sp.ds. уреждане и популяризиране на проекта и обществените поръчки Сп. (Bulgarian)
    3 July 2022
    0 references
    A projekt Płotyban található, a Koszalińska utcában, a szennyvíztisztító telep területén.A projekt a stratégiai beavatkozás (SSW) területén valósul meg.A projekt célja egy 300,16 kW teljesítményű fotovoltaikus létesítmény és 60,10 kW teljesítményű hőszivattyúk építése.A fotovoltaikus cellák által termelt egyenáramú villamos energiát az inverterek 400 V feszültségű váltakozó árammá alakítják át, majd transzformátorhálózattal a kérelmező villamosenergia-hálózatához. A PROJEKT MEGVALÓSÍTÁSÁNAK SZAKASZAI: 1.A projektdokumentáció elkészítése, beleértve: térkép tervezési célokra, projektdokumentáció, megvalósíthatósági tanulmány (IV-V 2016); 2. fotovoltaikus létesítmény építése – építési és szerelési munkák, beleértve: Az építkezés helyszínének előkészítése, panelek támogató szerkezete; Modulok és inverterek; Vezetékek; Kapcsolóberendezések és elektromos védelem; Telemechanika és biztonság; Földelő és kompenzációs létesítmény; Helyszíni kerítés dátuma – III-IX 2017; 3. hőszivattyúk beépítése, beleértve: hőszivattyúk telepítése; radiátorok cseréje:III-IX 6/44 2017r. 4. Befektetői felügyelet és projektösztönzés, beleértve: befektetői felügyelet, tájékoztatási és promóciós költségek (tájékoztató és emléktáblák beszerzése és összeszerelése) időpontja: III-IX 2017r. A projektet Płoty önkormányzata hajtja végre, amely egyidejűleg irányítja a projektet. A projektet közvetlenül a projektmenedzser hajtja végre, aki jelenleg a Gazdaságfejlesztési és Helyi Önkormányzati Beruházási Főosztály vezetője. A projektmenedzsment csapat többi tagja: Sp.ds. a projekt és a Közbeszerzési Sp. (Hungarian)
    3 July 2022
    0 references
    Tá an tionscadal suite i Płoty, ag Sráid Koszalińska, i réimse an ghléasra cóireála fuíolluisce.Cuirfear an tionscadal i bhfeidhm i réimse na hIdirghabhála Straitéisí (SSW).Is é cuspóir an tionscadail suiteáil fhótavoltach a thógáil le cumhacht 300.16 kW agus teaschaidéil le cumhacht 60.10 kW.Déanfaidh inverters fuinneamh leictreach i bhfoirm srutha dhírigh arna dtáirgeadh ag cealla fótavoltacha a thiontú ina sruth ailtéarnach le voltas 400V, ansin trí líonra claochladáin chuig líonra leictreachais an iarratasóra. CÉIMEANNA CHUR CHUN FEIDHME AN TIONSCADAIL: 1. Ullmhú doiciméadú tionscadail lena n-áirítear: léarscáil chun críocha deartha, doiciméadacht tionscadail, staidéar féidearthachta (IV-V 2016); 2.Suiteáil fhótavoltach a thógáil — oibreacha tógála agus suiteála, lena n-áirítear: An láithreán a ullmhú le haghaidh tógála, Struchtúr tacaíochta do phainéil; Modúil agus inbhéartóirí; Sreangú; Lascthrealamh agus cosaint leictreach; Telemechanika agus slándáil; Suiteáil talún agus cúiteach; Dáta fálú an láithreáin — III-IX 2017; 3.Teaschaidéil a shuiteáil, lena náirítear: suiteáil teaschaidéal; téarma nua radaitheoirí:III-IX 6/44 2017r. 4.Maoirseacht ar infheisteoirí agus tionscadail a chur chun cinn, lena n-áirítear: costais mhaoirseachta, faisnéise agus cur chun cinn infheisteoirí (ceannach agus cóimeáil faisnéise agus boird chuimhneacháin) dáta: III-IX 2017r. Cuirfidh Bardas Płoty an tionscadal i bhfeidhm, a dhéanfaidh an tionscadal a bhainistiú ag an am céanna. Beidh an tionscadal á chur i bhfeidhm go díreach ag an mBainisteoir Tionscadail, ag feidhmiú faoi láthair mar Cheann na Roinne Forbartha Eacnamaíochta agus Infheistíochtaí Rialtais Áitiúil. Baill eile den fhoireann bainistíochta tionscadail: Sp.ds. socrú agus cur chun cinn an tionscadail agus an Sp Soláthair Phoiblí. (Irish)
    3 July 2022
    0 references
    Projektet är beläget i Płoty, vid Koszalińska gatan, inom området för avloppsreningsverk.Projektet kommer att genomföras inom området Strategisk intervention (SSW).Syftet med projektet är att bygga en solcellsanläggning med en effekt på 300,16 kW och värmepumpar med en effekt på 60,10 kW.Den elektriska energin i form av likström som produceras av fotovoltaiska celler kommer att omvandlas av växelriktare till växelström med en spänning på 400V, sedan med hjälp av ett transformatornät till sökandens elnät. ETAPPER I PROJEKTETS GENOMFÖRANDE: 1.Förberedelse av projektdokumentation inklusive: karta för utformningsändamål, projektdokumentation, genomförbarhetsstudie (IV-V 2016). 2.Konstruktion av en solcellsinstallation – byggnads- och installationsarbeten, inklusive: Förberedelse av byggplatsen, stödstruktur för paneler; Moduler och växelriktare. Ledningar; Ställverk och elektriskt skydd; Telemechanika och säkerhet; Anläggning för jordning och kompensation. Plats stängsel datum – III-IX 2017; 3.Installation av värmepumpar, inklusive: installation av värmepumpar; ersättning av radiatorer term: III-IX 6/44 2017r. 4.Investorsövervakning och främjande av projekt, inklusive: investerartillsyn, informations- och marknadsföringskostnader (inköp och sammanställning av information och minnesnämnder) datum: III-IX 2017r. Projektet kommer att genomföras av kommunen Płoty, som samtidigt kommer att leda projektet. Projektet kommer att genomföras direkt av projektledaren, som för närvarande är chef för avdelningen för ekonomisk utveckling och lokala investeringar. Övriga medlemmar i projektledningsgruppen: Sp.ds. uppgörelse och främjande av projektet och offentlig upphandling Sp. (Swedish)
    3 July 2022
    0 references
    Projekt asub Płotys, Koszalińska tänaval reoveepuhasti piirkonnas.Projekt viiakse ellu strateegilise sekkumise (SSW) valdkonnas.Projekti objektiks on 300,16 kW võimsusega fotogalvaanilise seadme ja 60,10 kW võimsusega soojuspumpade ehitamine. PROJEKTI ELLUVIIMISE ETAPID: 1.Projekti dokumentatsiooni koostamine, sealhulgas: projekteerimisel kasutatav kaart, projekti dokumentatsioon, teostatavusuuring (IV-V 2016); Fotogalvaanilise paigalduse ehitamine – ehitus- ja paigaldustööd, sealhulgas: Ehitusplatsi ettevalmistamine, paneelide tugistruktuur; Moodulid ja inverterid; Juhtmestik; Jaotusseadmed ja elektrikaitse; Telemechanika ja turvalisus; Maandus- ja kompenseeriv paigaldus; Koht tara kuupäev – III-IX 2017; Soojuspumpade paigaldamine, sealhulgas: soojuspumpade paigaldamine; radiaatorite asendamine:III-IX 6/44 2017r. 4.Investorite järelevalve ja projektide edendamine, sealhulgas: investorite järelevalve, teavitamis- ja müügiedenduskulud (teabe ostmine ja kokkupanek ning mälestuskogud) kuupäev: III-IX 2017r. Projekti viib ellu Płoty omavalitsus, kes haldab samaaegselt projekti. Projekti viib ellu otse projektijuht, kes on praegu majandusarengu ja kohalike omavalitsuste investeeringute osakonna juhataja. Projektijuhtimise meeskonna teised liikmed: Projekti ja riigihangete Sp.ds. lahendamine ja edendamine (Estonian)
    3 July 2022
    0 references
    WOJ.: ZACHODNIOPOMORSKIE, POW.: gryficki
    0 references
    13 December 2023
    0 references

    Identifiers

    RPZP.02.10.00-32-A033/16
    0 references