CONSTRUCTION OF FVE – LACHMAN INTERIER DESIGN (Q16627): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: EU contribution (P835): 28,531.7928 euro)
(‎Changed label, description and/or aliases in pt)
 
(24 intermediate revisions by 2 users not shown)
label / enlabel / en
FVE CONSTRUCTION WORK — LACHMAN INTERER DESIGN
CONSTRUCTION OF FVE LACHMAN INTERIER DESIGN
label / frlabel / fr
 
CONSTRUCTION DE FVE — LACHMAN INTERIER DESIGN
label / delabel / de
 
BAU VON FVE – LACHMAN INTERIER DESIGN
label / nllabel / nl
 
BOUW VAN FVE — LACHMAN INTERIER DESIGN
label / itlabel / it
 
COSTRUZIONE DI FVE — LACHMAN INTERIER DESIGN
label / eslabel / es
 
CONSTRUCCIÓN DE FVE — LACHMAN INTERIER DESIGN
label / dalabel / da
 
KONSTRUKTION AF FVE — LACHMAN INTERIER DESIGN
label / ellabel / el
 
ΚΑΤΑΣΚΕΥΉ ΣΧΕΔΙΑΣΜΟΎ FVE — LACHMAN INTERIER
label / hrlabel / hr
 
IZGRADNJA FVE – LACHMAN INTERIER DIZAJN
label / rolabel / ro
 
CONSTRUCȚIA FVE – LACHMAN INTERIER DESIGN
label / sklabel / sk
 
KONŠTRUKCIA FVE – LACHMAN INTERIER DESIGN
label / mtlabel / mt
 
KOSTRUZZJONI TA’ FVE — DISINN TA’ INTERIER LACHMAN
label / ptlabel / pt
 
CONSTRUÇÃO DA FVE – CONCEÇÃO INTERIOR DE LACHMAN
label / filabel / fi
 
RAKENTAMINEN FVE – LACHMAN INTERIER SUUNNITTELU
label / pllabel / pl
 
BUDOWA FVE – LACHMAN INTERIER DESIGN
label / sllabel / sl
 
IZGRADNJA FVE – LACHMAN INTERIER DESIGN
label / ltlabel / lt
 
FVE STATYBA – LACHMAN INTERIER DIZAINAS
label / lvlabel / lv
 
FVE BŪVNIECĪBA — LACHMAN INTERIER DIZAINS
label / bglabel / bg
 
ИЗГРАЖДАНЕ НА FVE — ПРОЕКТИРАНЕ НА ЛАХМАН ИНТЕРИЕР
label / hulabel / hu
 
FVE ÉPÍTÉSE – LACHMAN INTERIER DESIGN
label / galabel / ga
 
TÓGÁIL FVE — DEARADH INTERIER LACHMAN
label / svlabel / sv
 
KONSTRUKTION AV FVE – LACHMAN INTERIER DESIGN
label / etlabel / et
 
FVE EHITUS – LACHMAN INTERIER PROJEKTEERIMINE
description / endescription / en
Project in Czech Republic financed by DG Regio
Project Q16627 in Czech Republic
description / csdescription / cs
Projekt v České republice financovaný DG Regio
Projekt Q16627 v České republice
description / bgdescription / bg
 
Проект Q16627 в Чехия
description / hrdescription / hr
 
Projekt Q16627 u Češkoj
description / hudescription / hu
 
Projekt Q16627 Csehországban
description / dadescription / da
 
Projekt Q16627 i Tjekkiet
description / nldescription / nl
 
Project Q16627 in Tsjechië
description / etdescription / et
 
Projekt Q16627 Tšehhi Vabariigis
description / fidescription / fi
 
Projekti Q16627 Tšekin tasavallassa
description / frdescription / fr
 
Projet Q16627 en République tchèque
description / dedescription / de
 
Projekt Q16627 in Tschechien
description / eldescription / el
 
Έργο Q16627 στην Τσεχία
description / gadescription / ga
 
Tionscadal Q16627 i bPoblacht na Seice
description / itdescription / it
 
Progetto Q16627 in Repubblica Ceca
description / lvdescription / lv
 
Projekts Q16627 Čehijā
description / ltdescription / lt
 
Projektas Q16627 Čekijoje
description / mtdescription / mt
 
Proġett Q16627 fir-Repubblika Ċeka
description / pldescription / pl
 
Projekt Q16627 w Czechach
description / ptdescription / pt
 
Projeto Q16627 na República Tcheca
description / rodescription / ro
 
Proiectul Q16627 în Republica Cehă
description / skdescription / sk
 
Projekt Q16627 v Českej republike
description / sldescription / sl
 
Projekt Q16627 na Češkem
description / esdescription / es
 
Proyecto Q16627 en República Checa
description / svdescription / sv
 
Projekt Q16627 i Tjeckien
Property / summary
The implementation of the present project consists of the installation of the FVE with an installed capacity of 41,18kWp located on the roof of the site. (English)
 
Property / summary: The implementation of the present project consists of the installation of the FVE with an installed capacity of 41,18kWp located on the roof of the site. (English) / rank
Normal rank
 
Property / coordinate location: 49°28'13.51"N, 17°6'36.79"E / qualifier
 
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 
Property / budget
40,759.704 Euro
Amount40,759.704 Euro
UnitEuro
 
Property / budget: 40,759.704 Euro / rank
Preferred rank
 
Property / budget: 40,759.704 Euro / qualifier
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
 
Property / budget: 40,759.704 Euro / qualifier
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / contained in NUTSProperty / contained in NUTS
Property / contained in NUTS: Olomouc Region / qualifier
 
Property / contained in Local Administrative Unit
 
Property / contained in Local Administrative Unit: Prostějov / rank
 
Normal rank
Property / contained in Local Administrative Unit: Prostějov / qualifier
 
Property / summary
 
Implementation of the submitted project consists of installing the FVE with installed power of 41,18kWp, located on the roof of the designed building. a. (English)
Property / summary: Implementation of the submitted project consists of installing the FVE with installed power of 41,18kWp, located on the roof of the designed building. a. (English) / rank
 
Normal rank
Property / summary: Implementation of the submitted project consists of installing the FVE with installed power of 41,18kWp, located on the roof of the designed building. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary: Implementation of the submitted project consists of installing the FVE with installed power of 41,18kWp, located on the roof of the designed building. a. (English) / qualifier
 
readability score: 0.0019105251191814
Amount0.0019105251191814
Unit1
Property / summary
 
La mise en œuvre du projet présenté consiste en l’installation de FVE avec une puissance installée de 41,18kWp, placée sur le toit du bâtiment conçu. (French)
Property / summary: La mise en œuvre du projet présenté consiste en l’installation de FVE avec une puissance installée de 41,18kWp, placée sur le toit du bâtiment conçu. (French) / rank
 
Normal rank
Property / summary: La mise en œuvre du projet présenté consiste en l’installation de FVE avec une puissance installée de 41,18kWp, placée sur le toit du bâtiment conçu. (French) / qualifier
 
point in time: 28 November 2021
Timestamp+2021-11-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Die Umsetzung des vorgestellten Projekts besteht in der Installation von FVE mit installierter Leistung 41,18kWp, die auf dem Dach des entworfenen Gebäudes platziert ist. (German)
Property / summary: Die Umsetzung des vorgestellten Projekts besteht in der Installation von FVE mit installierter Leistung 41,18kWp, die auf dem Dach des entworfenen Gebäudes platziert ist. (German) / rank
 
Normal rank
Property / summary: Die Umsetzung des vorgestellten Projekts besteht in der Installation von FVE mit installierter Leistung 41,18kWp, die auf dem Dach des entworfenen Gebäudes platziert ist. (German) / qualifier
 
point in time: 2 December 2021
Timestamp+2021-12-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
De uitvoering van het voorgestelde project bestaat uit de installatie van FVE met geïnstalleerd vermogen 41,18kWp, geplaatst op het dak van het ontworpen gebouw. (Dutch)
Property / summary: De uitvoering van het voorgestelde project bestaat uit de installatie van FVE met geïnstalleerd vermogen 41,18kWp, geplaatst op het dak van het ontworpen gebouw. (Dutch) / rank
 
Normal rank
Property / summary: De uitvoering van het voorgestelde project bestaat uit de installatie van FVE met geïnstalleerd vermogen 41,18kWp, geplaatst op het dak van het ontworpen gebouw. (Dutch) / qualifier
 
point in time: 13 December 2021
Timestamp+2021-12-13T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
L'attuazione del progetto presentato consiste nell'installazione di FVE con potenza installata 41,18kWp, posta sul tetto dell'edificio progettato. (Italian)
Property / summary: L'attuazione del progetto presentato consiste nell'installazione di FVE con potenza installata 41,18kWp, posta sul tetto dell'edificio progettato. (Italian) / rank
 
Normal rank
Property / summary: L'attuazione del progetto presentato consiste nell'installazione di FVE con potenza installata 41,18kWp, posta sul tetto dell'edificio progettato. (Italian) / qualifier
 
point in time: 14 January 2022
Timestamp+2022-01-14T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
La ejecución del proyecto presentado consiste en la instalación de FVE con potencia instalada 41,18kWp, colocada en el techo del edificio diseñado. (Spanish)
Property / summary: La ejecución del proyecto presentado consiste en la instalación de FVE con potencia instalada 41,18kWp, colocada en el techo del edificio diseñado. (Spanish) / rank
 
Normal rank
Property / summary: La ejecución del proyecto presentado consiste en la instalación de FVE con potencia instalada 41,18kWp, colocada en el techo del edificio diseñado. (Spanish) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Gennemførelsen af det indsendte projekt består i at installere FVE med installeret effekt på 41,18kWp, placeret på taget af den designede bygning. a. (Danish)
Property / summary: Gennemførelsen af det indsendte projekt består i at installere FVE med installeret effekt på 41,18kWp, placeret på taget af den designede bygning. a. (Danish) / rank
 
Normal rank
Property / summary: Gennemførelsen af det indsendte projekt består i at installere FVE med installeret effekt på 41,18kWp, placeret på taget af den designede bygning. a. (Danish) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Η υλοποίηση του υποβληθέντος έργου συνίσταται στην εγκατάσταση του FVE με εγκατεστημένη ισχύ 41,18kWp, που βρίσκεται στην οροφή του σχεδιασμένου κτιρίου. α. (Greek)
Property / summary: Η υλοποίηση του υποβληθέντος έργου συνίσταται στην εγκατάσταση του FVE με εγκατεστημένη ισχύ 41,18kWp, που βρίσκεται στην οροφή του σχεδιασμένου κτιρίου. α. (Greek) / rank
 
Normal rank
Property / summary: Η υλοποίηση του υποβληθέντος έργου συνίσταται στην εγκατάσταση του FVE με εγκατεστημένη ισχύ 41,18kWp, που βρίσκεται στην οροφή του σχεδιασμένου κτιρίου. α. (Greek) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Provedba dostavljenog projekta sastoji se od ugradnje FVE-a s instaliranom snagom od 41.18kWp, smještenog na krovu projektirane zgrade. (Croatian)
Property / summary: Provedba dostavljenog projekta sastoji se od ugradnje FVE-a s instaliranom snagom od 41.18kWp, smještenog na krovu projektirane zgrade. (Croatian) / rank
 
Normal rank
Property / summary: Provedba dostavljenog projekta sastoji se od ugradnje FVE-a s instaliranom snagom od 41.18kWp, smještenog na krovu projektirane zgrade. (Croatian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Implementarea proiectului prezentat constă în instalarea FVE cu putere instalată de 41,18kWp, situat pe acoperișul clădirii proiectate. a. (Romanian)
Property / summary: Implementarea proiectului prezentat constă în instalarea FVE cu putere instalată de 41,18kWp, situat pe acoperișul clădirii proiectate. a. (Romanian) / rank
 
Normal rank
Property / summary: Implementarea proiectului prezentat constă în instalarea FVE cu putere instalată de 41,18kWp, situat pe acoperișul clădirii proiectate. a. (Romanian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Realizácia predloženého projektu spočíva v inštalácii FVE s inštalovaným výkonom 41,18kWp, ktorý sa nachádza na streche projektovanej budovy. a. (Slovak)
Property / summary: Realizácia predloženého projektu spočíva v inštalácii FVE s inštalovaným výkonom 41,18kWp, ktorý sa nachádza na streche projektovanej budovy. a. (Slovak) / rank
 
Normal rank
Property / summary: Realizácia predloženého projektu spočíva v inštalácii FVE s inštalovaným výkonom 41,18kWp, ktorý sa nachádza na streche projektovanej budovy. a. (Slovak) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
L-implimentazzjoni tal-proġett ippreżentat tikkonsisti fl-installazzjoni tal-FVE b’enerġija installata ta’ 41,18kWp, li tinsab fuq is-saqaf tal-bini ddisinjat. a. (Maltese)
Property / summary: L-implimentazzjoni tal-proġett ippreżentat tikkonsisti fl-installazzjoni tal-FVE b’enerġija installata ta’ 41,18kWp, li tinsab fuq is-saqaf tal-bini ddisinjat. a. (Maltese) / rank
 
Normal rank
Property / summary: L-implimentazzjoni tal-proġett ippreżentat tikkonsisti fl-installazzjoni tal-FVE b’enerġija installata ta’ 41,18kWp, li tinsab fuq is-saqaf tal-bini ddisinjat. a. (Maltese) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A implementação do projecto apresentado consiste na instalação do FVE com potência instalada de 41,18kWp, localizado na cobertura do edifício projectado. (Portuguese)
Property / summary: A implementação do projecto apresentado consiste na instalação do FVE com potência instalada de 41,18kWp, localizado na cobertura do edifício projectado. (Portuguese) / rank
 
Normal rank
Property / summary: A implementação do projecto apresentado consiste na instalação do FVE com potência instalada de 41,18kWp, localizado na cobertura do edifício projectado. (Portuguese) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Hankkeen toteuttaminen koostuu FVE:n asentamisesta 41,18kWp:n asennetulla teholla, joka sijaitsee suunnitellun rakennuksen katolla. a. (Finnish)
Property / summary: Hankkeen toteuttaminen koostuu FVE:n asentamisesta 41,18kWp:n asennetulla teholla, joka sijaitsee suunnitellun rakennuksen katolla. a. (Finnish) / rank
 
Normal rank
Property / summary: Hankkeen toteuttaminen koostuu FVE:n asentamisesta 41,18kWp:n asennetulla teholla, joka sijaitsee suunnitellun rakennuksen katolla. a. (Finnish) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Realizacja zgłoszonego projektu polega na zainstalowaniu FVE o zainstalowanej mocy 41,18kWp, znajdującej się na dachu projektowanego budynku. a. (Polish)
Property / summary: Realizacja zgłoszonego projektu polega na zainstalowaniu FVE o zainstalowanej mocy 41,18kWp, znajdującej się na dachu projektowanego budynku. a. (Polish) / rank
 
Normal rank
Property / summary: Realizacja zgłoszonego projektu polega na zainstalowaniu FVE o zainstalowanej mocy 41,18kWp, znajdującej się na dachu projektowanego budynku. a. (Polish) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Izvedba predloženega projekta vključuje namestitev FVE z nameščeno močjo 41,18 kWp, ki se nahaja na strehi načrtovane stavbe. (Slovenian)
Property / summary: Izvedba predloženega projekta vključuje namestitev FVE z nameščeno močjo 41,18 kWp, ki se nahaja na strehi načrtovane stavbe. (Slovenian) / rank
 
Normal rank
Property / summary: Izvedba predloženega projekta vključuje namestitev FVE z nameščeno močjo 41,18 kWp, ki se nahaja na strehi načrtovane stavbe. (Slovenian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Pateikto projekto įgyvendinimą sudaro FVE su įdiegta galia 41,18kWp, esantis ant suprojektuoto pastato stogo. a. (Lithuanian)
Property / summary: Pateikto projekto įgyvendinimą sudaro FVE su įdiegta galia 41,18kWp, esantis ant suprojektuoto pastato stogo. a. (Lithuanian) / rank
 
Normal rank
Property / summary: Pateikto projekto įgyvendinimą sudaro FVE su įdiegta galia 41,18kWp, esantis ant suprojektuoto pastato stogo. a. (Lithuanian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Iesniegtā projekta īstenošana sastāv no FVE uzstādīšanas ar uzstādīto jaudu 41,18kWp, kas atrodas uz projektētās ēkas jumta. a. (Latvian)
Property / summary: Iesniegtā projekta īstenošana sastāv no FVE uzstādīšanas ar uzstādīto jaudu 41,18kWp, kas atrodas uz projektētās ēkas jumta. a. (Latvian) / rank
 
Normal rank
Property / summary: Iesniegtā projekta īstenošana sastāv no FVE uzstādīšanas ar uzstādīto jaudu 41,18kWp, kas atrodas uz projektētās ēkas jumta. a. (Latvian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Изпълнението на представения проект се състои в инсталиране на FVE с инсталирана мощност от 41,18kWp, разположена на покрива на проектната сграда. (Bulgarian)
Property / summary: Изпълнението на представения проект се състои в инсталиране на FVE с инсталирана мощност от 41,18kWp, разположена на покрива на проектната сграда. (Bulgarian) / rank
 
Normal rank
Property / summary: Изпълнението на представения проект се състои в инсталиране на FVE с инсталирана мощност от 41,18kWp, разположена на покрива на проектната сграда. (Bulgarian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A benyújtott projekt megvalósítása az FVE telepítéséből áll, 41,18kWp beépített teljesítménnyel, amely a tervezett épület tetején helyezkedik el. a. (Hungarian)
Property / summary: A benyújtott projekt megvalósítása az FVE telepítéséből áll, 41,18kWp beépített teljesítménnyel, amely a tervezett épület tetején helyezkedik el. a. (Hungarian) / rank
 
Normal rank
Property / summary: A benyújtott projekt megvalósítása az FVE telepítéséből áll, 41,18kWp beépített teljesítménnyel, amely a tervezett épület tetején helyezkedik el. a. (Hungarian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Is éard atá i gcur i bhfeidhm an tionscadail a cuireadh isteach ná an FVE a shuiteáil le cumhacht suiteáilte 41,18kWp, atá suite ar dhíon an fhoirgnimh deartha. (Irish)
Property / summary: Is éard atá i gcur i bhfeidhm an tionscadail a cuireadh isteach ná an FVE a shuiteáil le cumhacht suiteáilte 41,18kWp, atá suite ar dhíon an fhoirgnimh deartha. (Irish) / rank
 
Normal rank
Property / summary: Is éard atá i gcur i bhfeidhm an tionscadail a cuireadh isteach ná an FVE a shuiteáil le cumhacht suiteáilte 41,18kWp, atá suite ar dhíon an fhoirgnimh deartha. (Irish) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Genomförandet av det inlämnade projektet består i att installera FVE med installerad effekt på 41,18kWp, belägen på taket av den planerade byggnaden. a. (Swedish)
Property / summary: Genomförandet av det inlämnade projektet består i att installera FVE med installerad effekt på 41,18kWp, belägen på taket av den planerade byggnaden. a. (Swedish) / rank
 
Normal rank
Property / summary: Genomförandet av det inlämnade projektet består i att installera FVE med installerad effekt på 41,18kWp, belägen på taket av den planerade byggnaden. a. (Swedish) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
Esitatud projekti rakendamine seisneb hoone katusel paikneva 41,18 kWp võimsusega FVE paigaldamises. a. (Estonian)
Property / summary: Esitatud projekti rakendamine seisneb hoone katusel paikneva 41,18 kWp võimsusega FVE paigaldamises. a. (Estonian) / rank
 
Normal rank
Property / summary: Esitatud projekti rakendamine seisneb hoone katusel paikneva 41,18 kWp võimsusega FVE paigaldamises. a. (Estonian) / qualifier
 
point in time: 3 July 2022
Timestamp+2022-07-03T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / EU contribution
 
28,531.79 Euro
Amount28,531.79 Euro
UnitEuro
Property / EU contribution: 28,531.79 Euro / rank
 
Preferred rank
Property / EU contribution: 28,531.79 Euro / qualifier
 
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
Property / EU contribution: 28,531.79 Euro / qualifier
 
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / budget
 
40,759.70 Euro
Amount40,759.70 Euro
UnitEuro
Property / budget: 40,759.70 Euro / rank
 
Preferred rank
Property / budget: 40,759.70 Euro / qualifier
 
exchange rate to Euro: 0.04 Euro
Amount0.04 Euro
UnitEuro
Property / budget: 40,759.70 Euro / qualifier
 
point in time: 10 January 2020
Timestamp+2020-01-10T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / priority axis
 
Property / priority axis: Efficient energy management, development of energy infrastructure and renewable energy sources, support for the deployment of new technologies in the field of energy management and secondary raw materials / rank
 
Normal rank
Property / thematic objective
 
Property / thematic objective: Multiple Thematic Objective / rank
 
Normal rank
Property / start time
 
27 May 2019
Timestamp+2019-05-27T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / start time: 27 May 2019 / rank
 
Normal rank
Property / end time
 
12 December 2019
Timestamp+2019-12-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / end time: 12 December 2019 / rank
 
Normal rank

Latest revision as of 15:53, 7 October 2024

Project Q16627 in Czech Republic
Language Label Description Also known as
English
CONSTRUCTION OF FVE – LACHMAN INTERIER DESIGN
Project Q16627 in Czech Republic

    Statements

    0 references
    713,294.82 Czech koruna
    0 references
    28,531.79 Euro
    10 January 2020
    0 references
    1,018,992.6 Czech koruna
    0 references
    40,759.70 Euro
    10 January 2020
    0 references
    70 percent
    0 references
    27 May 2019
    0 references
    12 December 2019
    0 references
    31 December 2019
    0 references
    LACHMAN INTERIER DESIGN, s.r.o.
    0 references
    0 references

    49°28'13.51"N, 17°6'36.79"E
    0 references
    79601
    0 references
    Realizace předkládaného projektu spočívá v instalaci FVE o instalovaném výkonu 41,18kWp, umístěné na střeše řešeného objektu. a. (Czech)
    0 references
    Implementation of the submitted project consists of installing the FVE with installed power of 41,18kWp, located on the roof of the designed building. a. (English)
    22 October 2020
    0.0019105251191814
    0 references
    La mise en œuvre du projet présenté consiste en l’installation de FVE avec une puissance installée de 41,18kWp, placée sur le toit du bâtiment conçu. (French)
    28 November 2021
    0 references
    Die Umsetzung des vorgestellten Projekts besteht in der Installation von FVE mit installierter Leistung 41,18kWp, die auf dem Dach des entworfenen Gebäudes platziert ist. (German)
    2 December 2021
    0 references
    De uitvoering van het voorgestelde project bestaat uit de installatie van FVE met geïnstalleerd vermogen 41,18kWp, geplaatst op het dak van het ontworpen gebouw. (Dutch)
    13 December 2021
    0 references
    L'attuazione del progetto presentato consiste nell'installazione di FVE con potenza installata 41,18kWp, posta sul tetto dell'edificio progettato. (Italian)
    14 January 2022
    0 references
    La ejecución del proyecto presentado consiste en la instalación de FVE con potencia instalada 41,18kWp, colocada en el techo del edificio diseñado. (Spanish)
    15 January 2022
    0 references
    Gennemførelsen af det indsendte projekt består i at installere FVE med installeret effekt på 41,18kWp, placeret på taget af den designede bygning. a. (Danish)
    3 July 2022
    0 references
    Η υλοποίηση του υποβληθέντος έργου συνίσταται στην εγκατάσταση του FVE με εγκατεστημένη ισχύ 41,18kWp, που βρίσκεται στην οροφή του σχεδιασμένου κτιρίου. α. (Greek)
    3 July 2022
    0 references
    Provedba dostavljenog projekta sastoji se od ugradnje FVE-a s instaliranom snagom od 41.18kWp, smještenog na krovu projektirane zgrade. (Croatian)
    3 July 2022
    0 references
    Implementarea proiectului prezentat constă în instalarea FVE cu putere instalată de 41,18kWp, situat pe acoperișul clădirii proiectate. a. (Romanian)
    3 July 2022
    0 references
    Realizácia predloženého projektu spočíva v inštalácii FVE s inštalovaným výkonom 41,18kWp, ktorý sa nachádza na streche projektovanej budovy. a. (Slovak)
    3 July 2022
    0 references
    L-implimentazzjoni tal-proġett ippreżentat tikkonsisti fl-installazzjoni tal-FVE b’enerġija installata ta’ 41,18kWp, li tinsab fuq is-saqaf tal-bini ddisinjat. a. (Maltese)
    3 July 2022
    0 references
    A implementação do projecto apresentado consiste na instalação do FVE com potência instalada de 41,18kWp, localizado na cobertura do edifício projectado. (Portuguese)
    3 July 2022
    0 references
    Hankkeen toteuttaminen koostuu FVE:n asentamisesta 41,18kWp:n asennetulla teholla, joka sijaitsee suunnitellun rakennuksen katolla. a. (Finnish)
    3 July 2022
    0 references
    Realizacja zgłoszonego projektu polega na zainstalowaniu FVE o zainstalowanej mocy 41,18kWp, znajdującej się na dachu projektowanego budynku. a. (Polish)
    3 July 2022
    0 references
    Izvedba predloženega projekta vključuje namestitev FVE z nameščeno močjo 41,18 kWp, ki se nahaja na strehi načrtovane stavbe. (Slovenian)
    3 July 2022
    0 references
    Pateikto projekto įgyvendinimą sudaro FVE su įdiegta galia 41,18kWp, esantis ant suprojektuoto pastato stogo. a. (Lithuanian)
    3 July 2022
    0 references
    Iesniegtā projekta īstenošana sastāv no FVE uzstādīšanas ar uzstādīto jaudu 41,18kWp, kas atrodas uz projektētās ēkas jumta. a. (Latvian)
    3 July 2022
    0 references
    Изпълнението на представения проект се състои в инсталиране на FVE с инсталирана мощност от 41,18kWp, разположена на покрива на проектната сграда. (Bulgarian)
    3 July 2022
    0 references
    A benyújtott projekt megvalósítása az FVE telepítéséből áll, 41,18kWp beépített teljesítménnyel, amely a tervezett épület tetején helyezkedik el. a. (Hungarian)
    3 July 2022
    0 references
    Is éard atá i gcur i bhfeidhm an tionscadail a cuireadh isteach ná an FVE a shuiteáil le cumhacht suiteáilte 41,18kWp, atá suite ar dhíon an fhoirgnimh deartha. (Irish)
    3 July 2022
    0 references
    Genomförandet av det inlämnade projektet består i att installera FVE med installerad effekt på 41,18kWp, belägen på taket av den planerade byggnaden. a. (Swedish)
    3 July 2022
    0 references
    Esitatud projekti rakendamine seisneb hoone katusel paikneva 41,18 kWp võimsusega FVE paigaldamises. a. (Estonian)
    3 July 2022
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_138/0011606
    0 references