Construction of the Ostrów Wielkopolskie and Jarocin bypasses within the S11 (Q85928): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Set a claim value: summary (P836): A construção de Ostrów Wielkopolski e Jarocin contorna a S11 com um comprimento total de 26,15 km.)
(‎Changed label, description and/or aliases in pt)
 
label / ptlabel / pt
Construção das passagens de Ostrów Wielkopolski e Jarocina dentro do S11
Construção dos desvios de Ostrów Wielkopolskie e Jarocin no interior da S11

Latest revision as of 22:24, 12 October 2024

Project Q85928 in Poland
Language Label Description Also known as
English
Construction of the Ostrów Wielkopolskie and Jarocin bypasses within the S11
Project Q85928 in Poland

    Statements

    0 references
    333,035,520.0 zloty
    0 references
    79,928,520.0 Euro
    0 references
    391,806,500.0 zloty
    0 references
    94,033,560.0 Euro
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 March 2018
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    52°0'42.8"N, 18°28'52.0"E
    0 references

    52°23'49.2"N, 17°12'54.4"E
    0 references
    Budowa obwodnic Ostrowa Wielkopolskiego i Jarocina w ciągu S11 o łącznej długości 26,15 km. (Polish)
    0 references
    Construction of Ostrów Wielkopolski and Jarocin bypasses within the S11 with a total length of 26.15 km. (English)
    14 October 2020
    0.004316012104442
    0 references
    Construction de contournements d’Ostrów Wielkopolski et de Jarocin sur la route S11 d’une longueur totale de 26,15 km. (French)
    30 November 2021
    0 references
    Bau von Umgehungen von Ostrów Wielkopolski und Jarocin auf der Strecke S11 mit einer Gesamtlänge von 26,15 km. (German)
    7 December 2021
    0 references
    Aanleg van omwegen van Ostrów Wielkopolski en Jarocin in de S11-route met een totale lengte van 26,15 km. (Dutch)
    16 December 2021
    0 references
    Costruzione di bypass di Ostrów Wielkopolski e Jarocin nel percorso S11 per una lunghezza totale di 26,15 km. (Italian)
    16 January 2022
    0 references
    Construcción de circunvalaciones de Ostrów Wielkopolski y Jarocin en la ruta S11 con una longitud total de 26,15 km. (Spanish)
    19 January 2022
    0 references
    Ostrów Wielkopolski ja Jarocini ümbersõidutee ehitamine S11 liinil kogupikkusega 26,15 km. (Estonian)
    13 August 2022
    0 references
    Ostrów Wielkopolski ir Jarocin aplinkkelių tiesimas S11 maršrute, kurio bendras ilgis 26,15 km. (Lithuanian)
    13 August 2022
    0 references
    Izgradnja obilaznica Ostrów Wielkopolski i Jarocin na ruti S11 ukupne duljine 26,15 km. (Croatian)
    13 August 2022
    0 references
    Κατασκευή παρακάμψεων Ostrów Wielkopolski και Jarocin στη διαδρομή S11 συνολικού μήκους 26,15 km. (Greek)
    13 August 2022
    0 references
    Výstavba obchvatov Ostrów Wielkopolski a Jarocin na trase S11 s celkovou dĺžkou 26,15 km. (Slovak)
    13 August 2022
    0 references
    Ostrów Wielkopolskin ja Jarocinin ohikulkutien rakentaminen S11-reitille, jonka kokonaispituus on 26,15 km. (Finnish)
    13 August 2022
    0 references
    Ostrów Wielkopolski és Jarocin elkerülőútjainak építése az S11-es útvonalon, összesen 26,15 km hosszúsággal. (Hungarian)
    13 August 2022
    0 references
    Výstavba obchvatů Ostrów Wielkopolski a Jarocin na trase S11 o celkové délce 26,15 km. (Czech)
    13 August 2022
    0 references
    Ostrów Wielkopolski un Jarocin apvedceļu būvniecība maršrutā S11 ar kopējo garumu 26,15 km. (Latvian)
    13 August 2022
    0 references
    Tógáil seachbhealaí Ostrów Wielkopolski agus Jarocin sa bhealach S11 le fad iomlán 26.15 km. (Irish)
    13 August 2022
    0 references
    Gradnja obvoznic Ostrów Wielkopolski in Jarocin na poti S11 v skupni dolžini 26,15 km. (Slovenian)
    13 August 2022
    0 references
    Изграждане на обходни пътища на Ostrów Wielkopolski и Jarocin по трасето S11 с обща дължина 26,15 км. (Bulgarian)
    13 August 2022
    0 references
    Kostruzzjoni ta’ bypasses ta’ Ostrów Wielkopolski u Jarocin fuq ir-rotta S11 b’tul totali ta’ 26.15 km. (Maltese)
    13 August 2022
    0 references
    A construção de Ostrów Wielkopolski e Jarocin contorna a S11 com um comprimento total de 26,15 km. (Portuguese)
    13 August 2022
    0 references
    Anlæg af omfartsveje Ostrów Wielkopolski og Jarocin i S11-ruten med en samlet længde på 26,15 km. (Danish)
    13 August 2022
    0 references
    Construcția șoselelor Ostrów Wielkopolski și Jarocin pe traseul S11 cu o lungime totală de 26,15 km. (Romanian)
    13 August 2022
    0 references
    Byggandet av förbifarterna Ostrów Wielkopolski och Jarocin i S11-rutten med en total längd på 26,15 km. (Swedish)
    13 August 2022
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: kaliski
    0 references
    WOJ.: WIELKOPOLSKIE, POW.: poznański
    0 references
    13 December 2023
    0 references

    Identifiers

    POIS.04.01.00-00-0002/16
    0 references