INTEGRATED INTERVENTIONS FOR THE COMPLETION OF THE COASTAL DEFENCE WORKS (BETWEEN THE MOUTH FIUMARA SANTCÂ BECOMES Â OF THE ZONE) (Q2013150): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Added qualifier: readability score (P590521): 0.0142294870748164)
(‎Changed label, description and/or aliases in pt)
 
(One intermediate revision by the same user not shown)
label / ptlabel / pt
INTERVENÇÕES INTEGRADAS PARA A CONCLUSÃO DAS OBRAS DE DEFESA COSTEIRA (ENTRE A FOZ FIUMARA SANTC TORNA-SE DA ZONA)
INTERVENÇÕES INTEGRADAS PARA A CONCLUSÃO DOS TRABALHOS DE DEFESA COSTEIRA (Entre O SANTO DE FIUMARA MOUTH E A ZONA)
Property / summaryProperty / summary
INTERVENÇÕES INTEGRADAS PARA A CONCLUSÃO DAS OBRAS DE DEFESA COSTEIRA (ENTRE A FOZ FIUMARA SANTC TORNA-SE DA ZONA) (Portuguese)
INTERVENÇÕES INTEGRADAS PARA A CONCLUSÃO DOS TRABALHOS DE DEFESA COSTEIRA (Entre O SANTO DE FIUMARA MOUTH E A ZONA) (Portuguese)

Latest revision as of 17:00, 10 October 2024

Project Q2013150 in Italy
Language Label Description Also known as
English
INTEGRATED INTERVENTIONS FOR THE COMPLETION OF THE COASTAL DEFENCE WORKS (BETWEEN THE MOUTH FIUMARA SANTCÂ BECOMES Â OF THE ZONE)
Project Q2013150 in Italy

    Statements

    0 references
    1,350,000.0 Euro
    0 references
    1,800,000.0 Euro
    0 references
    75.0 percent
    0 references
    30 June 2017
    0 references
    31 December 2021
    0 references
    REGIONE CALABRIA
    0 references
    0 references

    39°3'23.76"N, 16°31'29.96"E
    0 references
    INTERVENTI INTEGRATI PER IL COMPLETAMENTO DELLE OPERE DI DIFESA COSTIERA (TRA FOCE FIUMARA SANT¿ANNà ¿ FAVAZZINA) (Italian)
    0 references
    INTEGRATED INTERVENTIONS FOR THE COMPLETION OF THE COASTAL DEFENCE WORKS (BETWEEN THE MOUTH FIUMARA SANTCÂ BECOMES Â OF THE ZONE) (English)
    0.0142294870748164
    0 references
    INTERVENTIONS INTÉGRÉES POUR L’ACHÈVEMENT DES TRAVAUX DE DÉFENSE CÔTIÈRE (ENTRE L’EMBOUCHURE DE FIUMARA SANTÂ’ANNÃ"FAVAZZINA) (French)
    14 December 2021
    0 references
    GEÏNTEGREERDE INTERVENTIES VOOR DE VOLTOOIING VAN KUSTVERDEDIGINGSWERKEN (TUSSEN DE MONDING VAN FIUMARA SANTÂ’ANNÃ Â’FAVAZZINA) (Dutch)
    22 December 2021
    0 references
    INTEGRIERTE INTERVENTIONEN ZUR FERTIGSTELLUNG DER KÜSTENSCHUTZARBEITEN (ZWISCHEN DER MÜNDUNG VON FIUMARA SANT¿ANNà ¿FAVAZZINA) (German)
    24 December 2021
    0 references
    INTERVENCIONES INTEGRADAS PARA LA REALIZACIÓN DE OBRAS DE DEFENSA COSTERA (ENTRE LA DESEMBOCADURA DE FIUMARA SANT¿ANNÀ?FAVAZZINA) (Spanish)
    24 January 2022
    0 references
    INTEGREREDE INTERVENTIONER TIL FÆRDIGGØRELSE AF KYSTFORSVARSARBEJDET (MELLEM FIUMARA SANTCS MUNDING BLIVER ZONEN) (Danish)
    4 July 2022
    0 references
    ΟΛΟΚΛΗΡΩΜΈΝΕΣ ΕΠΕΜΒΆΣΕΙΣ ΓΙΑ ΤΗΝ ΟΛΟΚΛΉΡΩΣΗ ΤΩΝ ΠΑΡΆΚΤΙΩΝ ΑΜΥΝΤΙΚΏΝ ΕΡΓΑΣΙΏΝ (ΜΕΤΑΞΎ ΤΟΥ ΣΤΌΜΑΤΟΣ FIUMARA SANTC ΓΊΝΕΤΑΙ ΤΗΣ ΖΏΝΗΣ) (Greek)
    4 July 2022
    0 references
    INTEGRIRANE INTERVENCIJE ZA DOVRŠETAK OBALNIH OBRAMBENIH RADOVA (IZMEĐU UŠĆA FIUMARA SANTC POSTAJE ZONA) (Croatian)
    4 July 2022
    0 references
    INTERVENȚII INTEGRATE PENTRU FINALIZAREA LUCRĂRILOR DE APĂRARE COSTIERĂ (ÎNTRE GURA FIUMARA SANTC DEVINE ZONA) (Romanian)
    4 July 2022
    0 references
    INTEGROVANÉ ZÁSAHY NA DOKONČENIE POBREŽNÝCH OBRANNÝCH PRÁC (MEDZI ÚSTÍM FIUMARA SANTC SA STÁVA ZÓNA) (Slovak)
    4 July 2022
    0 references
    INTERVENTI INTEGRATI GĦAT-TLESTIJA TAX-XOGĦLIJIET TA’ DIFIŻA KOSTALI (BEJN IL-ĦALQ FIUMARA SANTC ISIR TAŻ-ŻONA) (Maltese)
    4 July 2022
    0 references
    INTERVENÇÕES INTEGRADAS PARA A CONCLUSÃO DOS TRABALHOS DE DEFESA COSTEIRA (Entre O SANTO DE FIUMARA MOUTH E A ZONA) (Portuguese)
    4 July 2022
    0 references
    RANNIKKOALUEIDEN PUOLUSTUSTÖIDEN LOPPUUNSAATTAMISEEN TÄHTÄÄVÄT INTEGROIDUT TOIMET (SUUN VÄLISSÄ FIUMARA SANTC TULEE VYÖHYKKEELTÄ) (Finnish)
    4 July 2022
    0 references
    ZINTEGROWANE INTERWENCJE NA ZAKOŃCZENIE PRAC W ZAKRESIE OBRONY WYBRZEŻA (POMIĘDZY UJŚCIEM FIUMARA SANTC STAJE SIĘ STREFĄ) (Polish)
    4 July 2022
    0 references
    INTEGRIRANI POSEGI ZA DOKONČANJE OBALNIH OBRAMBNIH DEL (MED USTJEM FIUMARA SANTC POSTANE OBMOČJE) (Slovenian)
    4 July 2022
    0 references
    INTEGROVANÉ ZÁSAHY PRO DOKONČENÍ POBŘEŽNÍCH OBRANNÝCH PRACÍ (MEZI ÚSTÍM FIUMARA SANTC SE STÁVÁ ZÓNA) (Czech)
    4 July 2022
    0 references
    INTEGRUOTOS INTERVENCIJOS, SKIRTOS PAKRANČIŲ GYNYBOS DARBAMS UŽBAIGTI (TARP ŽIOČIŲ FIUMARA SANTC TAMPA ZONOS) (Lithuanian)
    4 July 2022
    0 references
    INTEGRĒTA IEJAUKŠANĀS PIEKRASTES AIZSARDZĪBAS DARBU PABEIGŠANAI (STARP IETEKU FIUMARA SANTC KĻŪST PAR ZONU) (Latvian)
    4 July 2022
    0 references
    ИНТЕГРИРАНИ ИНТЕРВЕНЦИИ ЗА ЗАВЪРШВАНЕ НА ДЕЙНОСТИТЕ ПО КРАЙБРЕЖНАТА ОТБРАНА (МЕЖДУ УСТИЕТО FIUMARA SANTC СЕ ПРЕВРЪЩА В ЗОНА) (Bulgarian)
    4 July 2022
    0 references
    INTEGRÁLT BEAVATKOZÁSOK A PARTVÉDELMI MUNKÁLATOK BEFEJEZÉSÉHEZ (A FIUMARA SANTC SZÁJA KÖZÖTT A ZÓNA RÉSZÉVÉ VÁLIK) (Hungarian)
    4 July 2022
    0 references
    IDIRGHABHÁLACHA COMHTHÁITE CHUN NA HOIBREACHA COSANTA CÓSTA A CHUR I GCRÍCH (IDIR BÉAL FIUMARA SANTC A THIOCFAIDH CHUN BHEITH SA CHRIOS) (Irish)
    4 July 2022
    0 references
    INTEGRERADE INSATSER FÖR SLUTFÖRANDET AV KUSTFÖRSVARET (MELLAN MYNNINGEN FIUMARA SANTC BLIR AV ZONEN) (Swedish)
    4 July 2022
    0 references
    INTEGREERITUD SEKKUMISED RANNIKUKAITSETÖÖDE LÕPULEVIIMISEKS (SUU VAHEL FIUMARA SANTC MUUTUB TSOONIST) (Estonian)
    4 July 2022
    0 references
    24 April 2023
    0 references
    CALABRIA
    0 references

    Identifiers

    J65B17000330006
    0 references