(10360.14072017.115000034) 03.18_3126_FERMI (Q2056957): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed an Item: Discontinued project)
 
(12 intermediate revisions by the same user not shown)
label / frlabel / fr
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / nllabel / nl
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / delabel / de
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / eslabel / es
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / dalabel / da
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / ellabel / el
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / hrlabel / hr
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / rolabel / ro
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / sklabel / sk
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / mtlabel / mt
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / ptlabel / pt
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / filabel / fi
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / pllabel / pl
 
(10360.14072017 115000034) 03.18_3126_FERMI
label / sllabel / sl
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / cslabel / cs
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / ltlabel / lt
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / lvlabel / lv
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / bglabel / bg
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / hulabel / hu
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / galabel / ga
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / svlabel / sv
 
(10360.14072017.115000034) 03.18_3126_FERMI
label / etlabel / et
 
(10360.14072017.115000034) 03.18_3126_FERMI
description / endescription / en
Project in Italy financed by DG Regio
Project Q2056957 in Italy
description / itdescription / it
Progetto in Italia finanziato da DG Regio
Progetto Q2056957 in Italia
description / bgdescription / bg
 
Проект Q2056957 в Италия
description / hrdescription / hr
 
Projekt Q2056957 u Italiji
description / hudescription / hu
 
Projekt Q2056957 Olaszországban
description / csdescription / cs
 
Projekt Q2056957 v Itálii
description / dadescription / da
 
Projekt Q2056957 i Italien
description / nldescription / nl
 
Project Q2056957 in Italië
description / etdescription / et
 
Projekt Q2056957 Itaalias
description / fidescription / fi
 
Projekti Q2056957 Italiassa
description / frdescription / fr
 
Projet Q2056957 en Italie
description / dedescription / de
 
Projekt Q2056957 in Italien
description / eldescription / el
 
Έργο Q2056957 στην Ιταλία
description / gadescription / ga
 
Tionscadal Q2056957 san Iodáil
description / lvdescription / lv
 
Projekts Q2056957 Itālijā
description / ltdescription / lt
 
Projektas Q2056957 Italijoje
description / mtdescription / mt
 
Proġett Q2056957 fl-Italja
description / pldescription / pl
 
Projekt Q2056957 we Włoszech
description / ptdescription / pt
 
Projeto Q2056957 na Itália
description / rodescription / ro
 
Proiectul Q2056957 în Italia
description / skdescription / sk
 
Projekt Q2056957 v Taliansku
description / sldescription / sl
 
Projekt Q2056957 v Italiji
description / esdescription / es
 
Proyecto Q2056957 en Italia
description / svdescription / sv
 
Projekt Q2056957 i Italien
Property / instance of: Kohesio project / rankProperty / instance of: Kohesio project / rank
Normal rank
Deprecated rank
Property / financed by
 
Property / financed by: Directorate-General for Regional and Urban Policy / rank
Normal rank
 
Property / EU contribution
198,387.92 Euro
Amount198,387.92 Euro
UnitEuro
 
Property / EU contribution: 198,387.92 Euro / rank
Normal rank
 
Property / budget
575,037.43 Euro
Amount575,037.43 Euro
UnitEuro
 
Property / budget: 575,037.43 Euro / rank
Normal rank
 
Property / co-financing rate
34.5 percent
Amount34.5 percent
Unitpercent
 
Property / co-financing rate: 34.5 percent / rank
Normal rank
 
Property / instance of
 
Property / instance of: Discontinued Kohesio Project / rank
 
Normal rank
Property / summary
 
AFIN D’ATTEINDRE LES OBJECTIFS D’EFFICACITÉ ÉNERGÉTIQUE DU BÂTIMENT CONSIDÉRÉ, OUI? A PRÉPARÉ UN PROJET SPÉCIFIQUE STRUCTURÉ SELON LES CONTENUTIES SUIVANTES: PRÉVOIT LA SUPPRESSION DE TOUS LES APPAREILS EXISTANTS QUI NE RÉPONDENT PAS AUX EXIGENCES DE PERFORMANCE ÉNONCÉES DANS LE DÉCRET 26/06/2015 RELATIF AUX PRESCRIPTIONS MINIMALES; EN PARALLÈLE, ALLONS-NOUS PROCÉDER? L’INSTALLATION DE NOUVEAUX CADRES EN ALUMINIUM, COUPE THERMIQUE, À FAIBLE ÉMISSION DE VERRE-CHAMBRE (BE), RÉPONDANT AUX EXIGENCES DE PERFORMANCE DU DÉCRET MINISTÉRIEL 16.02.2016 (COMPTE THERMIQUE 2.0) AVEC UW ELT; 1.67 W7MQ.K. L’INSTALLATION VA SE RÉALISER? AVEC UNE ATTENTION PARTICULIÈRE À LA CORRECTION DES PONTS THERMIQUES C.D.? IL PRÉVOIT DONC ÉGALEMENT LE REMPLACEMENT DES SEUILS ACTUELS PAR DE NOUVEAUX SEUILS DE COUPE THERMIQUE. LES FENÊTRES EN VERRE ORIENTÉES SUD-EST-SUD-SUD-SUD-SUD-OUEST SERONT ÉQUIPÉES D’UN REVÊTEMENT SÉLECTIF (VERRE CONTRÔLÉ SOLAIRE) AVEC FACTEUR SOLAIRE G, GL, N ELT; 0.35.- STRUCTURES HORIZONTALES ET VERTICALES D’ISOLATION THERMIQUE: LE LONG DE LA (French)
Property / summary: AFIN D’ATTEINDRE LES OBJECTIFS D’EFFICACITÉ ÉNERGÉTIQUE DU BÂTIMENT CONSIDÉRÉ, OUI? A PRÉPARÉ UN PROJET SPÉCIFIQUE STRUCTURÉ SELON LES CONTENUTIES SUIVANTES: PRÉVOIT LA SUPPRESSION DE TOUS LES APPAREILS EXISTANTS QUI NE RÉPONDENT PAS AUX EXIGENCES DE PERFORMANCE ÉNONCÉES DANS LE DÉCRET 26/06/2015 RELATIF AUX PRESCRIPTIONS MINIMALES; EN PARALLÈLE, ALLONS-NOUS PROCÉDER? L’INSTALLATION DE NOUVEAUX CADRES EN ALUMINIUM, COUPE THERMIQUE, À FAIBLE ÉMISSION DE VERRE-CHAMBRE (BE), RÉPONDANT AUX EXIGENCES DE PERFORMANCE DU DÉCRET MINISTÉRIEL 16.02.2016 (COMPTE THERMIQUE 2.0) AVEC UW ELT; 1.67 W7MQ.K. L’INSTALLATION VA SE RÉALISER? AVEC UNE ATTENTION PARTICULIÈRE À LA CORRECTION DES PONTS THERMIQUES C.D.? IL PRÉVOIT DONC ÉGALEMENT LE REMPLACEMENT DES SEUILS ACTUELS PAR DE NOUVEAUX SEUILS DE COUPE THERMIQUE. LES FENÊTRES EN VERRE ORIENTÉES SUD-EST-SUD-SUD-SUD-SUD-OUEST SERONT ÉQUIPÉES D’UN REVÊTEMENT SÉLECTIF (VERRE CONTRÔLÉ SOLAIRE) AVEC FACTEUR SOLAIRE G, GL, N ELT; 0.35.- STRUCTURES HORIZONTALES ET VERTICALES D’ISOLATION THERMIQUE: LE LONG DE LA (French) / rank
 
Normal rank
Property / summary: AFIN D’ATTEINDRE LES OBJECTIFS D’EFFICACITÉ ÉNERGÉTIQUE DU BÂTIMENT CONSIDÉRÉ, OUI? A PRÉPARÉ UN PROJET SPÉCIFIQUE STRUCTURÉ SELON LES CONTENUTIES SUIVANTES: PRÉVOIT LA SUPPRESSION DE TOUS LES APPAREILS EXISTANTS QUI NE RÉPONDENT PAS AUX EXIGENCES DE PERFORMANCE ÉNONCÉES DANS LE DÉCRET 26/06/2015 RELATIF AUX PRESCRIPTIONS MINIMALES; EN PARALLÈLE, ALLONS-NOUS PROCÉDER? L’INSTALLATION DE NOUVEAUX CADRES EN ALUMINIUM, COUPE THERMIQUE, À FAIBLE ÉMISSION DE VERRE-CHAMBRE (BE), RÉPONDANT AUX EXIGENCES DE PERFORMANCE DU DÉCRET MINISTÉRIEL 16.02.2016 (COMPTE THERMIQUE 2.0) AVEC UW ELT; 1.67 W7MQ.K. L’INSTALLATION VA SE RÉALISER? AVEC UNE ATTENTION PARTICULIÈRE À LA CORRECTION DES PONTS THERMIQUES C.D.? IL PRÉVOIT DONC ÉGALEMENT LE REMPLACEMENT DES SEUILS ACTUELS PAR DE NOUVEAUX SEUILS DE COUPE THERMIQUE. LES FENÊTRES EN VERRE ORIENTÉES SUD-EST-SUD-SUD-SUD-SUD-OUEST SERONT ÉQUIPÉES D’UN REVÊTEMENT SÉLECTIF (VERRE CONTRÔLÉ SOLAIRE) AVEC FACTEUR SOLAIRE G, GL, N ELT; 0.35.- STRUCTURES HORIZONTALES ET VERTICALES D’ISOLATION THERMIQUE: LE LONG DE LA (French) / qualifier
 
point in time: 16 December 2021
Timestamp+2021-12-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
OM DE ENERGIE-EFFICIËNTIEDOELSTELLINGEN VAN HET BETROKKEN GEBOUW TE BEREIKEN, JA? EEN SPECIFIEK PROJECT VOORBEREID DAT GESTRUCTUREERD IS VOLGENS DE VOLGENDE CONTENUTIES.- ARMATUREN: VOORZIEN IN DE VERWIJDERING VAN ALLE BESTAANDE ARMATUREN DIE NIET VOLDOEN AAN DE PRESTATIEVEREISTEN VAN HET MINIMUMEISENDE BESLUIT 26/06/2015; PARALLEL, ZULLEN WE VERDER GAAN? DE INSTALLATIE VAN NIEUWE ALUMINIUM FRAMES, THERMISCH GESLEPEN, MET EMISSIEARME GLASKAMER (BE), DIE VOLDOEN AAN DE PRESTATIEVEREISTEN VAN MINISTERIEEL BESLUIT 16.02.2016 (THERMISCHE REKENING 2.0) MET UW ELT; 1.67 W7MQ.K. DE INSTALLATIE ZAL UITKOMEN? MET BIJZONDERE AANDACHT VOOR DE CORRECTIE VAN C.D.? THERMISCHE BRUGGEN? ZIJ VOORZIET DAAROM OOK IN DE VERVANGING VAN DE HUIDIGE DREMPELS DOOR NIEUWE THERMISCHE REDUCTIEDREMPELS. GLAS RAMEN MET ZUID-OOST-ZUID-ZUID-WEST ORIËNTATIE ZAL WORDEN UITGERUST MET SELECTIEVE COATING (ZONNEGESTUURD GLAS) MET ZONNEFACTOR G, GL, N ELT; 0.35.- THERMISCHE ISOLATIE HORIZONTALE EN VERTICALE CONSTRUCTIES: LANGS DE (Dutch)
Property / summary: OM DE ENERGIE-EFFICIËNTIEDOELSTELLINGEN VAN HET BETROKKEN GEBOUW TE BEREIKEN, JA? EEN SPECIFIEK PROJECT VOORBEREID DAT GESTRUCTUREERD IS VOLGENS DE VOLGENDE CONTENUTIES.- ARMATUREN: VOORZIEN IN DE VERWIJDERING VAN ALLE BESTAANDE ARMATUREN DIE NIET VOLDOEN AAN DE PRESTATIEVEREISTEN VAN HET MINIMUMEISENDE BESLUIT 26/06/2015; PARALLEL, ZULLEN WE VERDER GAAN? DE INSTALLATIE VAN NIEUWE ALUMINIUM FRAMES, THERMISCH GESLEPEN, MET EMISSIEARME GLASKAMER (BE), DIE VOLDOEN AAN DE PRESTATIEVEREISTEN VAN MINISTERIEEL BESLUIT 16.02.2016 (THERMISCHE REKENING 2.0) MET UW ELT; 1.67 W7MQ.K. DE INSTALLATIE ZAL UITKOMEN? MET BIJZONDERE AANDACHT VOOR DE CORRECTIE VAN C.D.? THERMISCHE BRUGGEN? ZIJ VOORZIET DAAROM OOK IN DE VERVANGING VAN DE HUIDIGE DREMPELS DOOR NIEUWE THERMISCHE REDUCTIEDREMPELS. GLAS RAMEN MET ZUID-OOST-ZUID-ZUID-WEST ORIËNTATIE ZAL WORDEN UITGERUST MET SELECTIEVE COATING (ZONNEGESTUURD GLAS) MET ZONNEFACTOR G, GL, N ELT; 0.35.- THERMISCHE ISOLATIE HORIZONTALE EN VERTICALE CONSTRUCTIES: LANGS DE (Dutch) / rank
 
Normal rank
Property / summary: OM DE ENERGIE-EFFICIËNTIEDOELSTELLINGEN VAN HET BETROKKEN GEBOUW TE BEREIKEN, JA? EEN SPECIFIEK PROJECT VOORBEREID DAT GESTRUCTUREERD IS VOLGENS DE VOLGENDE CONTENUTIES.- ARMATUREN: VOORZIEN IN DE VERWIJDERING VAN ALLE BESTAANDE ARMATUREN DIE NIET VOLDOEN AAN DE PRESTATIEVEREISTEN VAN HET MINIMUMEISENDE BESLUIT 26/06/2015; PARALLEL, ZULLEN WE VERDER GAAN? DE INSTALLATIE VAN NIEUWE ALUMINIUM FRAMES, THERMISCH GESLEPEN, MET EMISSIEARME GLASKAMER (BE), DIE VOLDOEN AAN DE PRESTATIEVEREISTEN VAN MINISTERIEEL BESLUIT 16.02.2016 (THERMISCHE REKENING 2.0) MET UW ELT; 1.67 W7MQ.K. DE INSTALLATIE ZAL UITKOMEN? MET BIJZONDERE AANDACHT VOOR DE CORRECTIE VAN C.D.? THERMISCHE BRUGGEN? ZIJ VOORZIET DAAROM OOK IN DE VERVANGING VAN DE HUIDIGE DREMPELS DOOR NIEUWE THERMISCHE REDUCTIEDREMPELS. GLAS RAMEN MET ZUID-OOST-ZUID-ZUID-WEST ORIËNTATIE ZAL WORDEN UITGERUST MET SELECTIEVE COATING (ZONNEGESTUURD GLAS) MET ZONNEFACTOR G, GL, N ELT; 0.35.- THERMISCHE ISOLATIE HORIZONTALE EN VERTICALE CONSTRUCTIES: LANGS DE (Dutch) / qualifier
 
point in time: 23 December 2021
Timestamp+2021-12-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
UM DIE ENERGIEEFFIZIENZZIELE DES BETREFFENDEN GEBÄUDES ZU ERREICHEN, JA? ERSTELLTE EIN SPEZIFISCHES PROJEKT, DAS NACH FOLGENDEN CONTENUTIES.- VORRICHTUNGEN STRUKTURIERT IST: VORGESEHEN IST, DASS ALLE VORHANDENEN EINRICHTUNGEN ENTFERNT WERDEN, DIE DIE LEISTUNGSANFORDERUNGEN DES DEKRETS 26/06/2015 NICHT ERFÜLLEN; WERDEN WIR PARALLEL WEITERMACHEN? DIE INSTALLATION NEUER ALUMINIUMRAHMEN, THERMISCHER SCHNITT, MIT EMISSIONSARMEM GLAS-KAMMER (BE), DIE DEN LEISTUNGSANFORDERUNGEN DES MINISTERIALDEKRETS 16.02.2016 (THERMAL ACCOUNT 2.0) MIT UW ELT ENTSPRECHEN; 1.67 W7MQ.K. DIE INSTALLATION WIRD WAHR WERDEN? MIT BESONDEREM AUGENMERK AUF DIE KORREKTUR VON C.D.? WÄRMEBRÜCKEN? SIE SIEHT DAHER AUCH DIE ERSETZUNG DER DERZEITIGEN SCHWELLENWERTE DURCH NEUE THERMISCHE KÜRZUNGSSCHWELLEN VOR. GLASFENSTER MIT SÜD-SÜD-SÜD-WEST-AUSRICHTUNG WERDEN MIT SELEKTIVER BESCHICHTUNG (SOLARGESTEUERTES GLAS) MIT SOLARFAKTOR G, GL,N ELT AUSGESTATTET; 0,35.- WÄRMEDÄMMUNG HORIZONTALE UND VERTIKALE STRUKTUREN: ENTLANG DER (German)
Property / summary: UM DIE ENERGIEEFFIZIENZZIELE DES BETREFFENDEN GEBÄUDES ZU ERREICHEN, JA? ERSTELLTE EIN SPEZIFISCHES PROJEKT, DAS NACH FOLGENDEN CONTENUTIES.- VORRICHTUNGEN STRUKTURIERT IST: VORGESEHEN IST, DASS ALLE VORHANDENEN EINRICHTUNGEN ENTFERNT WERDEN, DIE DIE LEISTUNGSANFORDERUNGEN DES DEKRETS 26/06/2015 NICHT ERFÜLLEN; WERDEN WIR PARALLEL WEITERMACHEN? DIE INSTALLATION NEUER ALUMINIUMRAHMEN, THERMISCHER SCHNITT, MIT EMISSIONSARMEM GLAS-KAMMER (BE), DIE DEN LEISTUNGSANFORDERUNGEN DES MINISTERIALDEKRETS 16.02.2016 (THERMAL ACCOUNT 2.0) MIT UW ELT ENTSPRECHEN; 1.67 W7MQ.K. DIE INSTALLATION WIRD WAHR WERDEN? MIT BESONDEREM AUGENMERK AUF DIE KORREKTUR VON C.D.? WÄRMEBRÜCKEN? SIE SIEHT DAHER AUCH DIE ERSETZUNG DER DERZEITIGEN SCHWELLENWERTE DURCH NEUE THERMISCHE KÜRZUNGSSCHWELLEN VOR. GLASFENSTER MIT SÜD-SÜD-SÜD-WEST-AUSRICHTUNG WERDEN MIT SELEKTIVER BESCHICHTUNG (SOLARGESTEUERTES GLAS) MIT SOLARFAKTOR G, GL,N ELT AUSGESTATTET; 0,35.- WÄRMEDÄMMUNG HORIZONTALE UND VERTIKALE STRUKTUREN: ENTLANG DER (German) / rank
 
Normal rank
Property / summary: UM DIE ENERGIEEFFIZIENZZIELE DES BETREFFENDEN GEBÄUDES ZU ERREICHEN, JA? ERSTELLTE EIN SPEZIFISCHES PROJEKT, DAS NACH FOLGENDEN CONTENUTIES.- VORRICHTUNGEN STRUKTURIERT IST: VORGESEHEN IST, DASS ALLE VORHANDENEN EINRICHTUNGEN ENTFERNT WERDEN, DIE DIE LEISTUNGSANFORDERUNGEN DES DEKRETS 26/06/2015 NICHT ERFÜLLEN; WERDEN WIR PARALLEL WEITERMACHEN? DIE INSTALLATION NEUER ALUMINIUMRAHMEN, THERMISCHER SCHNITT, MIT EMISSIONSARMEM GLAS-KAMMER (BE), DIE DEN LEISTUNGSANFORDERUNGEN DES MINISTERIALDEKRETS 16.02.2016 (THERMAL ACCOUNT 2.0) MIT UW ELT ENTSPRECHEN; 1.67 W7MQ.K. DIE INSTALLATION WIRD WAHR WERDEN? MIT BESONDEREM AUGENMERK AUF DIE KORREKTUR VON C.D.? WÄRMEBRÜCKEN? SIE SIEHT DAHER AUCH DIE ERSETZUNG DER DERZEITIGEN SCHWELLENWERTE DURCH NEUE THERMISCHE KÜRZUNGSSCHWELLEN VOR. GLASFENSTER MIT SÜD-SÜD-SÜD-WEST-AUSRICHTUNG WERDEN MIT SELEKTIVER BESCHICHTUNG (SOLARGESTEUERTES GLAS) MIT SOLARFAKTOR G, GL,N ELT AUSGESTATTET; 0,35.- WÄRMEDÄMMUNG HORIZONTALE UND VERTIKALE STRUKTUREN: ENTLANG DER (German) / qualifier
 
point in time: 24 December 2021
Timestamp+2021-12-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PARA ALCANZAR LOS OBJETIVOS DE EFICIENCIA ENERGÉTICA DEL EDIFICIO EN CUESTIÓN, ¿SÍ? PREPARÓ UN PROYECTO ESPECÍFICO QUE SE ESTRUCTURA DE ACUERDO CON LAS SIGUIENTES CONTENUTIES.- ACCESORIOS: SE PREVÉ LA ELIMINACIÓN DE TODOS LOS ACCESORIOS EXISTENTES QUE NO CUMPLAN LOS REQUISITOS DE RENDIMIENTO ESTABLECIDOS EN LOS REQUISITOS MÍNIMOS DEL DECRETO 26/06/2015; PARALELAMENTE, ¿VAMOS A PROCEDER? LA INSTALACIÓN DE NUEVOS BASTIDORES DE ALUMINIO, DE CORTE TÉRMICO, CON CÁMARA DE VIDRIO DE BAJA EMISIÓN (BE), CUMPLIENDO LOS REQUISITOS DE RENDIMIENTO DEL DECRETO MINISTERIAL 16.02.2016 (CUENTA TÉRMICA 2.0) CON UW ELT; 1.67 W7MQ.K. LA INSTALACIÓN SE HARÁ REALIDAD? CON ESPECIAL ATENCIÓN A LA CORRECCIÓN DE LOS PUENTES TÉRMICOS DE C.D.? POR LO TANTO, TAMBIÉN PREVÉ LA SUSTITUCIÓN DE LOS UMBRALES ACTUALES POR NUEVOS UMBRALES DE CORTE TÉRMICO. LAS VENTANAS DE VIDRIO CON ORIENTACIÓN SURESTE-SUR-SUR-SUR-OESTE ESTARÁN EQUIPADAS CON REVESTIMIENTO SELECTIVO (VIDRIO CONTROLADO SOLAR) CON FACTOR SOLAR G, GL, N ELT; 0.35.- ESTRUCTURAS HORIZONTALES Y VERTICALES DE AISLAMIENTO TÉRMICO: A LO LARGO DE LA (Spanish)
Property / summary: PARA ALCANZAR LOS OBJETIVOS DE EFICIENCIA ENERGÉTICA DEL EDIFICIO EN CUESTIÓN, ¿SÍ? PREPARÓ UN PROYECTO ESPECÍFICO QUE SE ESTRUCTURA DE ACUERDO CON LAS SIGUIENTES CONTENUTIES.- ACCESORIOS: SE PREVÉ LA ELIMINACIÓN DE TODOS LOS ACCESORIOS EXISTENTES QUE NO CUMPLAN LOS REQUISITOS DE RENDIMIENTO ESTABLECIDOS EN LOS REQUISITOS MÍNIMOS DEL DECRETO 26/06/2015; PARALELAMENTE, ¿VAMOS A PROCEDER? LA INSTALACIÓN DE NUEVOS BASTIDORES DE ALUMINIO, DE CORTE TÉRMICO, CON CÁMARA DE VIDRIO DE BAJA EMISIÓN (BE), CUMPLIENDO LOS REQUISITOS DE RENDIMIENTO DEL DECRETO MINISTERIAL 16.02.2016 (CUENTA TÉRMICA 2.0) CON UW ELT; 1.67 W7MQ.K. LA INSTALACIÓN SE HARÁ REALIDAD? CON ESPECIAL ATENCIÓN A LA CORRECCIÓN DE LOS PUENTES TÉRMICOS DE C.D.? POR LO TANTO, TAMBIÉN PREVÉ LA SUSTITUCIÓN DE LOS UMBRALES ACTUALES POR NUEVOS UMBRALES DE CORTE TÉRMICO. LAS VENTANAS DE VIDRIO CON ORIENTACIÓN SURESTE-SUR-SUR-SUR-OESTE ESTARÁN EQUIPADAS CON REVESTIMIENTO SELECTIVO (VIDRIO CONTROLADO SOLAR) CON FACTOR SOLAR G, GL, N ELT; 0.35.- ESTRUCTURAS HORIZONTALES Y VERTICALES DE AISLAMIENTO TÉRMICO: A LO LARGO DE LA (Spanish) / rank
 
Normal rank
Property / summary: PARA ALCANZAR LOS OBJETIVOS DE EFICIENCIA ENERGÉTICA DEL EDIFICIO EN CUESTIÓN, ¿SÍ? PREPARÓ UN PROYECTO ESPECÍFICO QUE SE ESTRUCTURA DE ACUERDO CON LAS SIGUIENTES CONTENUTIES.- ACCESORIOS: SE PREVÉ LA ELIMINACIÓN DE TODOS LOS ACCESORIOS EXISTENTES QUE NO CUMPLAN LOS REQUISITOS DE RENDIMIENTO ESTABLECIDOS EN LOS REQUISITOS MÍNIMOS DEL DECRETO 26/06/2015; PARALELAMENTE, ¿VAMOS A PROCEDER? LA INSTALACIÓN DE NUEVOS BASTIDORES DE ALUMINIO, DE CORTE TÉRMICO, CON CÁMARA DE VIDRIO DE BAJA EMISIÓN (BE), CUMPLIENDO LOS REQUISITOS DE RENDIMIENTO DEL DECRETO MINISTERIAL 16.02.2016 (CUENTA TÉRMICA 2.0) CON UW ELT; 1.67 W7MQ.K. LA INSTALACIÓN SE HARÁ REALIDAD? CON ESPECIAL ATENCIÓN A LA CORRECCIÓN DE LOS PUENTES TÉRMICOS DE C.D.? POR LO TANTO, TAMBIÉN PREVÉ LA SUSTITUCIÓN DE LOS UMBRALES ACTUALES POR NUEVOS UMBRALES DE CORTE TÉRMICO. LAS VENTANAS DE VIDRIO CON ORIENTACIÓN SURESTE-SUR-SUR-SUR-OESTE ESTARÁN EQUIPADAS CON REVESTIMIENTO SELECTIVO (VIDRIO CONTROLADO SOLAR) CON FACTOR SOLAR G, GL, N ELT; 0.35.- ESTRUCTURAS HORIZONTALES Y VERTICALES DE AISLAMIENTO TÉRMICO: A LO LARGO DE LA (Spanish) / qualifier
 
point in time: 25 January 2022
Timestamp+2022-01-25T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
MED HENBLIK PÅ AT FORFØLGE MÅLENE OM AT FORBEDRE ENERGIEFFEKTIVITETEN I DEN PÅGÆLDENDE BYGNING? OPRETTE ET SPECIFIKT PROJEKT BASERET PÅ FØLGENDE INDHOLD AF INVENTARET: DER ER FASTSAT BESTEMMELSER OM FJERNELSE AF EKSISTERENDE VINDUESRAMMER, SOM IKKE OPFYLDER YDEEVNEKRAVENE I MINDSTEKRAVENE 26.6.2015 PARALLELT, FORTSÆTTER DU? INSTALLATION AF NYE VARMEAFSKÅRNE VINDUER AF ALUMINIUM MED VETRO-KAMERA BASO-LAVEMISSION (BE), DER OPFYLDER PRÆSTATIONSKRAVENE I MINISTERIELT DEKRET NR. 16.02.2016 (TERMISK REGNSKAB 2.0) MED HEW ELT 1,67 W7M.K. AVTRR INSTALLATION? MED SÆRLIG OPMÆRKSOMHED PÅ KORREKTIONEN AF C.D.? TIL TERMISKE BROER? DET INDEHOLDER DERFOR OGSÅ BESTEMMELSER OM UDSKIFTNING AF EKSISTERENDE TÆRSKLER MED NYE VARMEAFBRYDELSESTÆRSKLER. SUD-EXD-SUD-OVEST-RUDER VIL VÆRE UDSTYRET MED EN SELEKTIV BELÆGNING (SOLSTYRET GLAS) AF GLAS G, GL, N ELT; 0,35-TERMISK ISOLERING AF VANDRETTE OG LODRETTE KONSTRUKTIONER: LANG (Danish)
Property / summary: MED HENBLIK PÅ AT FORFØLGE MÅLENE OM AT FORBEDRE ENERGIEFFEKTIVITETEN I DEN PÅGÆLDENDE BYGNING? OPRETTE ET SPECIFIKT PROJEKT BASERET PÅ FØLGENDE INDHOLD AF INVENTARET: DER ER FASTSAT BESTEMMELSER OM FJERNELSE AF EKSISTERENDE VINDUESRAMMER, SOM IKKE OPFYLDER YDEEVNEKRAVENE I MINDSTEKRAVENE 26.6.2015 PARALLELT, FORTSÆTTER DU? INSTALLATION AF NYE VARMEAFSKÅRNE VINDUER AF ALUMINIUM MED VETRO-KAMERA BASO-LAVEMISSION (BE), DER OPFYLDER PRÆSTATIONSKRAVENE I MINISTERIELT DEKRET NR. 16.02.2016 (TERMISK REGNSKAB 2.0) MED HEW ELT 1,67 W7M.K. AVTRR INSTALLATION? MED SÆRLIG OPMÆRKSOMHED PÅ KORREKTIONEN AF C.D.? TIL TERMISKE BROER? DET INDEHOLDER DERFOR OGSÅ BESTEMMELSER OM UDSKIFTNING AF EKSISTERENDE TÆRSKLER MED NYE VARMEAFBRYDELSESTÆRSKLER. SUD-EXD-SUD-OVEST-RUDER VIL VÆRE UDSTYRET MED EN SELEKTIV BELÆGNING (SOLSTYRET GLAS) AF GLAS G, GL, N ELT; 0,35-TERMISK ISOLERING AF VANDRETTE OG LODRETTE KONSTRUKTIONER: LANG (Danish) / rank
 
Normal rank
Property / summary: MED HENBLIK PÅ AT FORFØLGE MÅLENE OM AT FORBEDRE ENERGIEFFEKTIVITETEN I DEN PÅGÆLDENDE BYGNING? OPRETTE ET SPECIFIKT PROJEKT BASERET PÅ FØLGENDE INDHOLD AF INVENTARET: DER ER FASTSAT BESTEMMELSER OM FJERNELSE AF EKSISTERENDE VINDUESRAMMER, SOM IKKE OPFYLDER YDEEVNEKRAVENE I MINDSTEKRAVENE 26.6.2015 PARALLELT, FORTSÆTTER DU? INSTALLATION AF NYE VARMEAFSKÅRNE VINDUER AF ALUMINIUM MED VETRO-KAMERA BASO-LAVEMISSION (BE), DER OPFYLDER PRÆSTATIONSKRAVENE I MINISTERIELT DEKRET NR. 16.02.2016 (TERMISK REGNSKAB 2.0) MED HEW ELT 1,67 W7M.K. AVTRR INSTALLATION? MED SÆRLIG OPMÆRKSOMHED PÅ KORREKTIONEN AF C.D.? TIL TERMISKE BROER? DET INDEHOLDER DERFOR OGSÅ BESTEMMELSER OM UDSKIFTNING AF EKSISTERENDE TÆRSKLER MED NYE VARMEAFBRYDELSESTÆRSKLER. SUD-EXD-SUD-OVEST-RUDER VIL VÆRE UDSTYRET MED EN SELEKTIV BELÆGNING (SOLSTYRET GLAS) AF GLAS G, GL, N ELT; 0,35-TERMISK ISOLERING AF VANDRETTE OG LODRETTE KONSTRUKTIONER: LANG (Danish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
ΠΡΟΚΕΙΜΈΝΟΥ ΝΑ ΕΠΙΤΕΥΧΘΟΎΝ ΟΙ ΣΤΌΧΟΙ ΤΗΣ ΒΕΛΤΊΩΣΗΣ ΤΗΣ ΕΝΕΡΓΕΙΑΚΉΣ ΑΠΌΔΟΣΗΣ ΤΟΥ ΕΝ ΛΌΓΩ ΚΤΙΡΊΟΥ; ΔΗΜΙΟΥΡΓΊΑ ΕΙΔΙΚΟΎ ΣΧΕΔΊΟΥ ΜΕ ΒΆΣΗ ΤΟ ΑΚΌΛΟΥΘΟ ΠΕΡΙΕΧΌΜΕΝΟ ΤΩΝ ΦΩΤΙΣΤΙΚΏΝ: ΠΡΟΒΛΈΠΕΤΑΙ Η ΑΦΑΊΡΕΣΗ ΤΥΧΌΝ ΥΦΙΣΤΆΜΕΝΩΝ ΠΛΑΙΣΊΩΝ ΠΑΡΑΘΎΡΩΝ ΠΟΥ ΔΕΝ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΕΠΙΔΌΣΕΩΝ ΠΟΥ ΟΡΊΖΟΝΤΑΙ ΣΤΙΣ ΕΛΆΧΙΣΤΕΣ ΑΠΑΙΤΉΣΕΙΣ 26/06/2015· ΠΑΡΆΛΛΗΛΑ, ΠΡΟΧΩΡΆΤΕ; ΤΗΝ ΕΓΚΑΤΆΣΤΑΣΗ ΝΈΟΥ ΑΛΟΥΜΙΝΊΟΥ, ΘΕΡΜΟΚΟΠΤΏΝ ΠΑΡΑΘΎΡΩΝ, ΜΕ VETRO-CAMERA BASO-LOW-EMISSION (BE), ΠΟΥ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΑΠΌΔΟΣΗΣ ΤΗΣ ΥΠΟΥΡΓΙΚΉΣ ΑΠΌΦΑΣΗΣ ΑΡΙΘ. 16.02.2016 (ΘΕΡΜΙΚΌΣ ΛΟΓΑΡΙΑΣΜΌΣ 2.0) ΜΕ ELT. 1,67 W7M.K. Η ΕΓΚΑΤΆΣΤΑΣΗ AVTRR; ΜΕ ΙΔΙΑΊΤΕΡΗ ΠΡΟΣΟΧΉ ΣΤΗ ΔΙΌΡΘΩΣΗ ΤΟΥ C.D.; ΓΙΑ ΘΕΡΜΙΚΈΣ ΓΈΦΥΡΕΣ; ΩΣ ΕΚ ΤΟΎΤΟΥ, ΠΡΟΒΛΈΠΕΙ ΕΠΊΣΗΣ ΤΗΝ ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΤΩΝ ΥΦΙΣΤΆΜΕΝΩΝ ΚΑΤΏΤΑΤΩΝ ΟΡΊΩΝ ΑΠΌ ΝΈΑ ΚΑΤΏΤΑΤΑ ΌΡΙΑ ΜΕΊΩΣΗΣ ΤΗΣ ΘΕΡΜΌΤΗΤΑΣ. ΟΙ ΥΑΛΟΠΊΝΑΚΕΣ SUD-EXD-SUD-OVEST ΘΑ ΕΊΝΑΙ ΕΞΟΠΛΙΣΜΈΝΟΙ ΜΕ ΕΠΙΛΕΚΤΙΚΉ ΕΠΙΚΆΛΥΨΗ (ΗΛΙΑΚΌΣ ΥΑΛΟΠΊΝΑΚΑΣ) ΑΠΌ ΓΥΑΛΊ G, GL, N ELT· 0,35-ΘΕΡΜΙΚΉ ΜΌΝΩΣΗ ΟΡΙΖΌΝΤΙΩΝ ΚΑΙ ΚΑΤΑΚΌΡΥΦΩΝ ΔΟΜΏΝ: ΜΑΚΡΎΣ (Greek)
Property / summary: ΠΡΟΚΕΙΜΈΝΟΥ ΝΑ ΕΠΙΤΕΥΧΘΟΎΝ ΟΙ ΣΤΌΧΟΙ ΤΗΣ ΒΕΛΤΊΩΣΗΣ ΤΗΣ ΕΝΕΡΓΕΙΑΚΉΣ ΑΠΌΔΟΣΗΣ ΤΟΥ ΕΝ ΛΌΓΩ ΚΤΙΡΊΟΥ; ΔΗΜΙΟΥΡΓΊΑ ΕΙΔΙΚΟΎ ΣΧΕΔΊΟΥ ΜΕ ΒΆΣΗ ΤΟ ΑΚΌΛΟΥΘΟ ΠΕΡΙΕΧΌΜΕΝΟ ΤΩΝ ΦΩΤΙΣΤΙΚΏΝ: ΠΡΟΒΛΈΠΕΤΑΙ Η ΑΦΑΊΡΕΣΗ ΤΥΧΌΝ ΥΦΙΣΤΆΜΕΝΩΝ ΠΛΑΙΣΊΩΝ ΠΑΡΑΘΎΡΩΝ ΠΟΥ ΔΕΝ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΕΠΙΔΌΣΕΩΝ ΠΟΥ ΟΡΊΖΟΝΤΑΙ ΣΤΙΣ ΕΛΆΧΙΣΤΕΣ ΑΠΑΙΤΉΣΕΙΣ 26/06/2015· ΠΑΡΆΛΛΗΛΑ, ΠΡΟΧΩΡΆΤΕ; ΤΗΝ ΕΓΚΑΤΆΣΤΑΣΗ ΝΈΟΥ ΑΛΟΥΜΙΝΊΟΥ, ΘΕΡΜΟΚΟΠΤΏΝ ΠΑΡΑΘΎΡΩΝ, ΜΕ VETRO-CAMERA BASO-LOW-EMISSION (BE), ΠΟΥ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΑΠΌΔΟΣΗΣ ΤΗΣ ΥΠΟΥΡΓΙΚΉΣ ΑΠΌΦΑΣΗΣ ΑΡΙΘ. 16.02.2016 (ΘΕΡΜΙΚΌΣ ΛΟΓΑΡΙΑΣΜΌΣ 2.0) ΜΕ ELT. 1,67 W7M.K. Η ΕΓΚΑΤΆΣΤΑΣΗ AVTRR; ΜΕ ΙΔΙΑΊΤΕΡΗ ΠΡΟΣΟΧΉ ΣΤΗ ΔΙΌΡΘΩΣΗ ΤΟΥ C.D.; ΓΙΑ ΘΕΡΜΙΚΈΣ ΓΈΦΥΡΕΣ; ΩΣ ΕΚ ΤΟΎΤΟΥ, ΠΡΟΒΛΈΠΕΙ ΕΠΊΣΗΣ ΤΗΝ ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΤΩΝ ΥΦΙΣΤΆΜΕΝΩΝ ΚΑΤΏΤΑΤΩΝ ΟΡΊΩΝ ΑΠΌ ΝΈΑ ΚΑΤΏΤΑΤΑ ΌΡΙΑ ΜΕΊΩΣΗΣ ΤΗΣ ΘΕΡΜΌΤΗΤΑΣ. ΟΙ ΥΑΛΟΠΊΝΑΚΕΣ SUD-EXD-SUD-OVEST ΘΑ ΕΊΝΑΙ ΕΞΟΠΛΙΣΜΈΝΟΙ ΜΕ ΕΠΙΛΕΚΤΙΚΉ ΕΠΙΚΆΛΥΨΗ (ΗΛΙΑΚΌΣ ΥΑΛΟΠΊΝΑΚΑΣ) ΑΠΌ ΓΥΑΛΊ G, GL, N ELT· 0,35-ΘΕΡΜΙΚΉ ΜΌΝΩΣΗ ΟΡΙΖΌΝΤΙΩΝ ΚΑΙ ΚΑΤΑΚΌΡΥΦΩΝ ΔΟΜΏΝ: ΜΑΚΡΎΣ (Greek) / rank
 
Normal rank
Property / summary: ΠΡΟΚΕΙΜΈΝΟΥ ΝΑ ΕΠΙΤΕΥΧΘΟΎΝ ΟΙ ΣΤΌΧΟΙ ΤΗΣ ΒΕΛΤΊΩΣΗΣ ΤΗΣ ΕΝΕΡΓΕΙΑΚΉΣ ΑΠΌΔΟΣΗΣ ΤΟΥ ΕΝ ΛΌΓΩ ΚΤΙΡΊΟΥ; ΔΗΜΙΟΥΡΓΊΑ ΕΙΔΙΚΟΎ ΣΧΕΔΊΟΥ ΜΕ ΒΆΣΗ ΤΟ ΑΚΌΛΟΥΘΟ ΠΕΡΙΕΧΌΜΕΝΟ ΤΩΝ ΦΩΤΙΣΤΙΚΏΝ: ΠΡΟΒΛΈΠΕΤΑΙ Η ΑΦΑΊΡΕΣΗ ΤΥΧΌΝ ΥΦΙΣΤΆΜΕΝΩΝ ΠΛΑΙΣΊΩΝ ΠΑΡΑΘΎΡΩΝ ΠΟΥ ΔΕΝ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΕΠΙΔΌΣΕΩΝ ΠΟΥ ΟΡΊΖΟΝΤΑΙ ΣΤΙΣ ΕΛΆΧΙΣΤΕΣ ΑΠΑΙΤΉΣΕΙΣ 26/06/2015· ΠΑΡΆΛΛΗΛΑ, ΠΡΟΧΩΡΆΤΕ; ΤΗΝ ΕΓΚΑΤΆΣΤΑΣΗ ΝΈΟΥ ΑΛΟΥΜΙΝΊΟΥ, ΘΕΡΜΟΚΟΠΤΏΝ ΠΑΡΑΘΎΡΩΝ, ΜΕ VETRO-CAMERA BASO-LOW-EMISSION (BE), ΠΟΥ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΑΠΌΔΟΣΗΣ ΤΗΣ ΥΠΟΥΡΓΙΚΉΣ ΑΠΌΦΑΣΗΣ ΑΡΙΘ. 16.02.2016 (ΘΕΡΜΙΚΌΣ ΛΟΓΑΡΙΑΣΜΌΣ 2.0) ΜΕ ELT. 1,67 W7M.K. Η ΕΓΚΑΤΆΣΤΑΣΗ AVTRR; ΜΕ ΙΔΙΑΊΤΕΡΗ ΠΡΟΣΟΧΉ ΣΤΗ ΔΙΌΡΘΩΣΗ ΤΟΥ C.D.; ΓΙΑ ΘΕΡΜΙΚΈΣ ΓΈΦΥΡΕΣ; ΩΣ ΕΚ ΤΟΎΤΟΥ, ΠΡΟΒΛΈΠΕΙ ΕΠΊΣΗΣ ΤΗΝ ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΤΩΝ ΥΦΙΣΤΆΜΕΝΩΝ ΚΑΤΏΤΑΤΩΝ ΟΡΊΩΝ ΑΠΌ ΝΈΑ ΚΑΤΏΤΑΤΑ ΌΡΙΑ ΜΕΊΩΣΗΣ ΤΗΣ ΘΕΡΜΌΤΗΤΑΣ. ΟΙ ΥΑΛΟΠΊΝΑΚΕΣ SUD-EXD-SUD-OVEST ΘΑ ΕΊΝΑΙ ΕΞΟΠΛΙΣΜΈΝΟΙ ΜΕ ΕΠΙΛΕΚΤΙΚΉ ΕΠΙΚΆΛΥΨΗ (ΗΛΙΑΚΌΣ ΥΑΛΟΠΊΝΑΚΑΣ) ΑΠΌ ΓΥΑΛΊ G, GL, N ELT· 0,35-ΘΕΡΜΙΚΉ ΜΌΝΩΣΗ ΟΡΙΖΌΝΤΙΩΝ ΚΑΙ ΚΑΤΑΚΌΡΥΦΩΝ ΔΟΜΏΝ: ΜΑΚΡΎΣ (Greek) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
KAKO BI SE OSTVARILI CILJEVI POBOLJŠANJA ENERGETSKE UČINKOVITOSTI PREDMETNE ZGRADE? USPOSTAVITI ODREĐENI PROJEKT KOJI SE TEMELJI NA SLJEDEĆEM SADRŽAJU ČVORA: PREDVIĐENO JE UKLANJANJE SVIH POSTOJEĆIH OKVIRA PROZORA KOJI NE ISPUNJAVAJU ZAHTJEVE U POGLEDU UČINKOVITOSTI UTVRĐENE U MINIMALNIM ZAHTJEVIMA OD 26. LIPNJA 2015.; PARALELNO, NASTAVLJAŠ LI? UGRADNJA NOVIH ALUMINIJSKIH, TOPLINSKI REZNIH PROZORA, S VETRO-KAMEROM BASO-NISKA EMISIJA (BE), KOJA ISPUNJAVA ZAHTJEVE U POGLEDU UČINKOVITOSTI MINISTARSKE UREDBE BR. 16.02.2016 (TOPLINSKI RAČUN 2.0) S HEW ELT-OM; 1,67 W7M.K. AVTRR INSTALACIJA? S POSEBNIM NAGLASKOM NA KOREKCIJU C.D.? ZA TOPLINSKE MOSTOVE? STOGA SE PREDVIĐA I ZAMJENA POSTOJEĆIH PRAGOVA NOVIM PRAGOVIMA ZA SMANJENJE TOPLINE. SUD-EXD-SUD-OVEST STAKLA BIT ĆE OPREMLJENA SELEKTIVNIM PREMAZOM (SOLARNIM KONTROLIRANIM STAKLOM) OD STAKLA G, GL, N ELT; 0,35-TOPLINSKA IZOLACIJA VODORAVNIH I VERTIKALNIH KONSTRUKCIJA: DUGO (Croatian)
Property / summary: KAKO BI SE OSTVARILI CILJEVI POBOLJŠANJA ENERGETSKE UČINKOVITOSTI PREDMETNE ZGRADE? USPOSTAVITI ODREĐENI PROJEKT KOJI SE TEMELJI NA SLJEDEĆEM SADRŽAJU ČVORA: PREDVIĐENO JE UKLANJANJE SVIH POSTOJEĆIH OKVIRA PROZORA KOJI NE ISPUNJAVAJU ZAHTJEVE U POGLEDU UČINKOVITOSTI UTVRĐENE U MINIMALNIM ZAHTJEVIMA OD 26. LIPNJA 2015.; PARALELNO, NASTAVLJAŠ LI? UGRADNJA NOVIH ALUMINIJSKIH, TOPLINSKI REZNIH PROZORA, S VETRO-KAMEROM BASO-NISKA EMISIJA (BE), KOJA ISPUNJAVA ZAHTJEVE U POGLEDU UČINKOVITOSTI MINISTARSKE UREDBE BR. 16.02.2016 (TOPLINSKI RAČUN 2.0) S HEW ELT-OM; 1,67 W7M.K. AVTRR INSTALACIJA? S POSEBNIM NAGLASKOM NA KOREKCIJU C.D.? ZA TOPLINSKE MOSTOVE? STOGA SE PREDVIĐA I ZAMJENA POSTOJEĆIH PRAGOVA NOVIM PRAGOVIMA ZA SMANJENJE TOPLINE. SUD-EXD-SUD-OVEST STAKLA BIT ĆE OPREMLJENA SELEKTIVNIM PREMAZOM (SOLARNIM KONTROLIRANIM STAKLOM) OD STAKLA G, GL, N ELT; 0,35-TOPLINSKA IZOLACIJA VODORAVNIH I VERTIKALNIH KONSTRUKCIJA: DUGO (Croatian) / rank
 
Normal rank
Property / summary: KAKO BI SE OSTVARILI CILJEVI POBOLJŠANJA ENERGETSKE UČINKOVITOSTI PREDMETNE ZGRADE? USPOSTAVITI ODREĐENI PROJEKT KOJI SE TEMELJI NA SLJEDEĆEM SADRŽAJU ČVORA: PREDVIĐENO JE UKLANJANJE SVIH POSTOJEĆIH OKVIRA PROZORA KOJI NE ISPUNJAVAJU ZAHTJEVE U POGLEDU UČINKOVITOSTI UTVRĐENE U MINIMALNIM ZAHTJEVIMA OD 26. LIPNJA 2015.; PARALELNO, NASTAVLJAŠ LI? UGRADNJA NOVIH ALUMINIJSKIH, TOPLINSKI REZNIH PROZORA, S VETRO-KAMEROM BASO-NISKA EMISIJA (BE), KOJA ISPUNJAVA ZAHTJEVE U POGLEDU UČINKOVITOSTI MINISTARSKE UREDBE BR. 16.02.2016 (TOPLINSKI RAČUN 2.0) S HEW ELT-OM; 1,67 W7M.K. AVTRR INSTALACIJA? S POSEBNIM NAGLASKOM NA KOREKCIJU C.D.? ZA TOPLINSKE MOSTOVE? STOGA SE PREDVIĐA I ZAMJENA POSTOJEĆIH PRAGOVA NOVIM PRAGOVIMA ZA SMANJENJE TOPLINE. SUD-EXD-SUD-OVEST STAKLA BIT ĆE OPREMLJENA SELEKTIVNIM PREMAZOM (SOLARNIM KONTROLIRANIM STAKLOM) OD STAKLA G, GL, N ELT; 0,35-TOPLINSKA IZOLACIJA VODORAVNIH I VERTIKALNIH KONSTRUKCIJA: DUGO (Croatian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
PENTRU A URMĂRI OBIECTIVELE DE ÎMBUNĂTĂȚIRE A EFICIENȚEI ENERGETICE A CLĂDIRII ÎN CAUZĂ? REALIZAREA UNUI PROIECT SPECIFIC PE BAZA URMĂTORULUI CONȚINUT AL CORPURILOR: SE PREVEDE ÎNDEPĂRTAREA CADRELOR DE FERESTRE EXISTENTE CARE NU ÎNDEPLINESC CERINȚELE DE PERFORMANȚĂ PREVĂZUTE ÎN CERINȚELE MINIME DIN 26.6.2015; ÎN PARALEL, CONTINUAȚI? INSTALAREA DE FERESTRE NOI DIN ALUMINIU, TĂIATE TERMIC, CU CAMERĂ VETRO-CAMERA BASO CU EMISII SCĂZUTE (BE), ÎNDEPLININD CERINȚELE DE PERFORMANȚĂ DIN DECRETUL MINISTERIAL NR. 16.02.2016 (CONT TERMIC 2.0) CU ELT; 1,67 W7MK INSTALAȚIA AVTRR? CU O ATENȚIE DEOSEBITĂ LA CORECTAREA C.D.? PENTRU PODURI TERMICE? PRIN URMARE, ACESTA PREVEDE, DE ASEMENEA, ÎNLOCUIREA PRAGURILOR EXISTENTE CU NOI PRAGURI DE REDUCERE A CĂLDURII. GEAMURILE SUD-EXD-SUD-OVEST VOR FI ECHIPATE CU UN STRAT SELECTIV (STICLĂ CONTROLATĂ SOLAR) DIN STICLĂ G, GL, N ELT; 0,35-IZOLAREA TERMICĂ A STRUCTURILOR ORIZONTALE ȘI VERTICALE: LUNGĂ (Romanian)
Property / summary: PENTRU A URMĂRI OBIECTIVELE DE ÎMBUNĂTĂȚIRE A EFICIENȚEI ENERGETICE A CLĂDIRII ÎN CAUZĂ? REALIZAREA UNUI PROIECT SPECIFIC PE BAZA URMĂTORULUI CONȚINUT AL CORPURILOR: SE PREVEDE ÎNDEPĂRTAREA CADRELOR DE FERESTRE EXISTENTE CARE NU ÎNDEPLINESC CERINȚELE DE PERFORMANȚĂ PREVĂZUTE ÎN CERINȚELE MINIME DIN 26.6.2015; ÎN PARALEL, CONTINUAȚI? INSTALAREA DE FERESTRE NOI DIN ALUMINIU, TĂIATE TERMIC, CU CAMERĂ VETRO-CAMERA BASO CU EMISII SCĂZUTE (BE), ÎNDEPLININD CERINȚELE DE PERFORMANȚĂ DIN DECRETUL MINISTERIAL NR. 16.02.2016 (CONT TERMIC 2.0) CU ELT; 1,67 W7MK INSTALAȚIA AVTRR? CU O ATENȚIE DEOSEBITĂ LA CORECTAREA C.D.? PENTRU PODURI TERMICE? PRIN URMARE, ACESTA PREVEDE, DE ASEMENEA, ÎNLOCUIREA PRAGURILOR EXISTENTE CU NOI PRAGURI DE REDUCERE A CĂLDURII. GEAMURILE SUD-EXD-SUD-OVEST VOR FI ECHIPATE CU UN STRAT SELECTIV (STICLĂ CONTROLATĂ SOLAR) DIN STICLĂ G, GL, N ELT; 0,35-IZOLAREA TERMICĂ A STRUCTURILOR ORIZONTALE ȘI VERTICALE: LUNGĂ (Romanian) / rank
 
Normal rank
Property / summary: PENTRU A URMĂRI OBIECTIVELE DE ÎMBUNĂTĂȚIRE A EFICIENȚEI ENERGETICE A CLĂDIRII ÎN CAUZĂ? REALIZAREA UNUI PROIECT SPECIFIC PE BAZA URMĂTORULUI CONȚINUT AL CORPURILOR: SE PREVEDE ÎNDEPĂRTAREA CADRELOR DE FERESTRE EXISTENTE CARE NU ÎNDEPLINESC CERINȚELE DE PERFORMANȚĂ PREVĂZUTE ÎN CERINȚELE MINIME DIN 26.6.2015; ÎN PARALEL, CONTINUAȚI? INSTALAREA DE FERESTRE NOI DIN ALUMINIU, TĂIATE TERMIC, CU CAMERĂ VETRO-CAMERA BASO CU EMISII SCĂZUTE (BE), ÎNDEPLININD CERINȚELE DE PERFORMANȚĂ DIN DECRETUL MINISTERIAL NR. 16.02.2016 (CONT TERMIC 2.0) CU ELT; 1,67 W7MK INSTALAȚIA AVTRR? CU O ATENȚIE DEOSEBITĂ LA CORECTAREA C.D.? PENTRU PODURI TERMICE? PRIN URMARE, ACESTA PREVEDE, DE ASEMENEA, ÎNLOCUIREA PRAGURILOR EXISTENTE CU NOI PRAGURI DE REDUCERE A CĂLDURII. GEAMURILE SUD-EXD-SUD-OVEST VOR FI ECHIPATE CU UN STRAT SELECTIV (STICLĂ CONTROLATĂ SOLAR) DIN STICLĂ G, GL, N ELT; 0,35-IZOLAREA TERMICĂ A STRUCTURILOR ORIZONTALE ȘI VERTICALE: LUNGĂ (Romanian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
NA DOSIAHNUTIE CIEĽOV ZLEPŠENIA ENERGETICKEJ ÚČINNOSTI PREDMETNEJ BUDOVY? VYTVORIŤ KONKRÉTNY PROJEKT ZALOŽENÝ NA TOMTO OBSAHU PRÍPRAVKOV: PRIJALI SA OPATRENIA NA ODSTRÁNENIE AKÝCHKOĽVEK EXISTUJÚCICH OKENNÝCH RÁMOV, KTORÉ NESPĹŇAJÚ VÝKONNOSTNÉ POŽIADAVKY STANOVENÉ V MINIMÁLNYCH POŽIADAVKÁCH 26/06/2015; PARALELNE, POKRAČUJEŠ? INŠTALÁCIA NOVÝCH HLINÍKOVÝCH, TEPELNÝCH REZNÝCH OKIEN S VETRO-CAMERA BASO-NÍZKOEMISNÝMI (BE), SPĹŇAJÚCICH VÝKONNOSTNÉ POŽIADAVKY MINISTERSKEJ VYHLÁŠKY Č. 16.02.2016 (TEPELNÝ ÚČET 2.0) S HROTOM ELT; 1,67 W7M.K. INŠTALÁCIA AVTRR? S OSOBITNÝM DÔRAZOM NA KOREKCIU C.D.? PRE TEPELNÉ MOSTY? PRETO SA V ŇOM STANOVUJE AJ NAHRADENIE EXISTUJÚCICH PRAHOVÝCH HODNÔT NOVÝMI PRAHOVÝMI HODNOTAMI PRE ZNÍŽENIE TEPLA. ZASKLENIE SUD-EXD-SUD-OVEST BUDE VYBAVENÉ SELEKTÍVNYM POVLAKOM (SOLÁRNYM RIADENÝM SKLOM) ZO SKLA G, GL, N ELT; 0,35-TEPELNÁ IZOLÁCIA HORIZONTÁLNYCH A VERTIKÁLNYCH KONŠTRUKCIÍ: DLHÁ (Slovak)
Property / summary: NA DOSIAHNUTIE CIEĽOV ZLEPŠENIA ENERGETICKEJ ÚČINNOSTI PREDMETNEJ BUDOVY? VYTVORIŤ KONKRÉTNY PROJEKT ZALOŽENÝ NA TOMTO OBSAHU PRÍPRAVKOV: PRIJALI SA OPATRENIA NA ODSTRÁNENIE AKÝCHKOĽVEK EXISTUJÚCICH OKENNÝCH RÁMOV, KTORÉ NESPĹŇAJÚ VÝKONNOSTNÉ POŽIADAVKY STANOVENÉ V MINIMÁLNYCH POŽIADAVKÁCH 26/06/2015; PARALELNE, POKRAČUJEŠ? INŠTALÁCIA NOVÝCH HLINÍKOVÝCH, TEPELNÝCH REZNÝCH OKIEN S VETRO-CAMERA BASO-NÍZKOEMISNÝMI (BE), SPĹŇAJÚCICH VÝKONNOSTNÉ POŽIADAVKY MINISTERSKEJ VYHLÁŠKY Č. 16.02.2016 (TEPELNÝ ÚČET 2.0) S HROTOM ELT; 1,67 W7M.K. INŠTALÁCIA AVTRR? S OSOBITNÝM DÔRAZOM NA KOREKCIU C.D.? PRE TEPELNÉ MOSTY? PRETO SA V ŇOM STANOVUJE AJ NAHRADENIE EXISTUJÚCICH PRAHOVÝCH HODNÔT NOVÝMI PRAHOVÝMI HODNOTAMI PRE ZNÍŽENIE TEPLA. ZASKLENIE SUD-EXD-SUD-OVEST BUDE VYBAVENÉ SELEKTÍVNYM POVLAKOM (SOLÁRNYM RIADENÝM SKLOM) ZO SKLA G, GL, N ELT; 0,35-TEPELNÁ IZOLÁCIA HORIZONTÁLNYCH A VERTIKÁLNYCH KONŠTRUKCIÍ: DLHÁ (Slovak) / rank
 
Normal rank
Property / summary: NA DOSIAHNUTIE CIEĽOV ZLEPŠENIA ENERGETICKEJ ÚČINNOSTI PREDMETNEJ BUDOVY? VYTVORIŤ KONKRÉTNY PROJEKT ZALOŽENÝ NA TOMTO OBSAHU PRÍPRAVKOV: PRIJALI SA OPATRENIA NA ODSTRÁNENIE AKÝCHKOĽVEK EXISTUJÚCICH OKENNÝCH RÁMOV, KTORÉ NESPĹŇAJÚ VÝKONNOSTNÉ POŽIADAVKY STANOVENÉ V MINIMÁLNYCH POŽIADAVKÁCH 26/06/2015; PARALELNE, POKRAČUJEŠ? INŠTALÁCIA NOVÝCH HLINÍKOVÝCH, TEPELNÝCH REZNÝCH OKIEN S VETRO-CAMERA BASO-NÍZKOEMISNÝMI (BE), SPĹŇAJÚCICH VÝKONNOSTNÉ POŽIADAVKY MINISTERSKEJ VYHLÁŠKY Č. 16.02.2016 (TEPELNÝ ÚČET 2.0) S HROTOM ELT; 1,67 W7M.K. INŠTALÁCIA AVTRR? S OSOBITNÝM DÔRAZOM NA KOREKCIU C.D.? PRE TEPELNÉ MOSTY? PRETO SA V ŇOM STANOVUJE AJ NAHRADENIE EXISTUJÚCICH PRAHOVÝCH HODNÔT NOVÝMI PRAHOVÝMI HODNOTAMI PRE ZNÍŽENIE TEPLA. ZASKLENIE SUD-EXD-SUD-OVEST BUDE VYBAVENÉ SELEKTÍVNYM POVLAKOM (SOLÁRNYM RIADENÝM SKLOM) ZO SKLA G, GL, N ELT; 0,35-TEPELNÁ IZOLÁCIA HORIZONTÁLNYCH A VERTIKÁLNYCH KONŠTRUKCIÍ: DLHÁ (Slovak) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
SABIEX JINTLAĦQU L-GĦANIJIET TAT-TITJIB TAL-EFFIĊJENZA ENERĠETIKA TAL-BINI INKWISTJONI? TISTABBILIXXI PROĠETT SPEĊIFIKU BBAŻAT FUQ IL-KONTENUT LI ĠEJ TAL-ATTREZZATURI: ISSIR DISPOŻIZZJONI GĦAT-TNEĦĦIJA TA’ KWALUNKWE QAFAS TAT-TWIEQI EŻISTENTI LI MA JISSODISFAX IR-REKWIŻITI TAL-PRESTAZZJONI STIPULATI FIR-REKWIŻITI MINIMI 26/06/2015; B’MOD PARALLEL, TIPPROĊEDI INT? L-INSTALLAZZJONI TA’ ALUMINJU ĠDID, TWIEQI MAQTUGĦA TERMALI, B’VETRO-CAMERA BASO B’EMISSJONIJIET BAXXI (BE), LI JISSODISFAW IR-REKWIŻITI TAL-PRESTAZZJONI TAD-DIGRIET MINISTERJALI NRU 16.02.2016 (KONT TERMALI 2.0) MA’ HEW ELT; 1,67 W7M.K. L-INSTALLAZZJONI AVTRR? B’ATTENZJONI PARTIKOLARI GĦALL-KORREZZJONI TAS-C.D.? GĦAL PONTIJIET TERMALI? GĦALHEKK JIPPROVDI WKOLL GĦAS-SOSTITUZZJONI TAL-LIMITI EŻISTENTI B’LIMITI ĠODDA GĦALL-QTUGĦ TAS-SĦANA. IL-ĦĠIEĠ SUD-EXD-SUD-OVEST SE JKUN MGĦAMMAR B’KISJA SELETTIVA (ĦĠIEĠ IKKONTROLLAT MIX-XEMX) TA’ ĦĠIEĠ G, GL, N ELT; 0,35-INSULAZZJONI TERMALI TA’ STRUTTURI ORIZZONTALI U VERTIKALI: TUL TA’ ŻMIEN (Maltese)
Property / summary: SABIEX JINTLAĦQU L-GĦANIJIET TAT-TITJIB TAL-EFFIĊJENZA ENERĠETIKA TAL-BINI INKWISTJONI? TISTABBILIXXI PROĠETT SPEĊIFIKU BBAŻAT FUQ IL-KONTENUT LI ĠEJ TAL-ATTREZZATURI: ISSIR DISPOŻIZZJONI GĦAT-TNEĦĦIJA TA’ KWALUNKWE QAFAS TAT-TWIEQI EŻISTENTI LI MA JISSODISFAX IR-REKWIŻITI TAL-PRESTAZZJONI STIPULATI FIR-REKWIŻITI MINIMI 26/06/2015; B’MOD PARALLEL, TIPPROĊEDI INT? L-INSTALLAZZJONI TA’ ALUMINJU ĠDID, TWIEQI MAQTUGĦA TERMALI, B’VETRO-CAMERA BASO B’EMISSJONIJIET BAXXI (BE), LI JISSODISFAW IR-REKWIŻITI TAL-PRESTAZZJONI TAD-DIGRIET MINISTERJALI NRU 16.02.2016 (KONT TERMALI 2.0) MA’ HEW ELT; 1,67 W7M.K. L-INSTALLAZZJONI AVTRR? B’ATTENZJONI PARTIKOLARI GĦALL-KORREZZJONI TAS-C.D.? GĦAL PONTIJIET TERMALI? GĦALHEKK JIPPROVDI WKOLL GĦAS-SOSTITUZZJONI TAL-LIMITI EŻISTENTI B’LIMITI ĠODDA GĦALL-QTUGĦ TAS-SĦANA. IL-ĦĠIEĠ SUD-EXD-SUD-OVEST SE JKUN MGĦAMMAR B’KISJA SELETTIVA (ĦĠIEĠ IKKONTROLLAT MIX-XEMX) TA’ ĦĠIEĠ G, GL, N ELT; 0,35-INSULAZZJONI TERMALI TA’ STRUTTURI ORIZZONTALI U VERTIKALI: TUL TA’ ŻMIEN (Maltese) / rank
 
Normal rank
Property / summary: SABIEX JINTLAĦQU L-GĦANIJIET TAT-TITJIB TAL-EFFIĊJENZA ENERĠETIKA TAL-BINI INKWISTJONI? TISTABBILIXXI PROĠETT SPEĊIFIKU BBAŻAT FUQ IL-KONTENUT LI ĠEJ TAL-ATTREZZATURI: ISSIR DISPOŻIZZJONI GĦAT-TNEĦĦIJA TA’ KWALUNKWE QAFAS TAT-TWIEQI EŻISTENTI LI MA JISSODISFAX IR-REKWIŻITI TAL-PRESTAZZJONI STIPULATI FIR-REKWIŻITI MINIMI 26/06/2015; B’MOD PARALLEL, TIPPROĊEDI INT? L-INSTALLAZZJONI TA’ ALUMINJU ĠDID, TWIEQI MAQTUGĦA TERMALI, B’VETRO-CAMERA BASO B’EMISSJONIJIET BAXXI (BE), LI JISSODISFAW IR-REKWIŻITI TAL-PRESTAZZJONI TAD-DIGRIET MINISTERJALI NRU 16.02.2016 (KONT TERMALI 2.0) MA’ HEW ELT; 1,67 W7M.K. L-INSTALLAZZJONI AVTRR? B’ATTENZJONI PARTIKOLARI GĦALL-KORREZZJONI TAS-C.D.? GĦAL PONTIJIET TERMALI? GĦALHEKK JIPPROVDI WKOLL GĦAS-SOSTITUZZJONI TAL-LIMITI EŻISTENTI B’LIMITI ĠODDA GĦALL-QTUGĦ TAS-SĦANA. IL-ĦĠIEĠ SUD-EXD-SUD-OVEST SE JKUN MGĦAMMAR B’KISJA SELETTIVA (ĦĠIEĠ IKKONTROLLAT MIX-XEMX) TA’ ĦĠIEĠ G, GL, N ELT; 0,35-INSULAZZJONI TERMALI TA’ STRUTTURI ORIZZONTALI U VERTIKALI: TUL TA’ ŻMIEN (Maltese) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A FIM DE PROSSEGUIR OS OBJETIVOS DE MELHORIA DA EFICIÊNCIA ENERGÉTICA DO EDIFÍCIO EM QUESTÃO? CRIAR UM PROJETO ESPECÍFICO COM BASE NO SEGUINTE CONTEÚDO DOS DISPOSITIVOS: ESTÁ PREVISTA A REMOÇÃO DE QUAISQUER CAIXILHOS DE JANELAS EXISTENTES QUE NÃO CUMPRAM OS REQUISITOS DE DESEMPENHO ESTABELECIDOS NOS REQUISITOS MÍNIMOS 26/06/2015; EM PARALELO, CONTINUAS? A INSTALAÇÃO DE NOVAS JANELAS DE ALUMÍNIO, CORTE TÉRMICO, COM CÂMARA VETRO BASO-BAIXA EMISSÃO (BE), CUMPRINDO OS REQUISITOS DE DESEMPENHO DO DECRETO MINISTERIAL N.º 16.02.2016 (CONTA TÉRMICA 2.0) COM HEW ELT; 1,67 W7M.K. A INSTALAÇÃO AVTRR? COM ESPECIAL ATENÇÃO À CORREÇÃO DA D.C.? PARA PONTES TÉRMICAS? POR CONSEGUINTE, PREVÊ IGUALMENTE A SUBSTITUIÇÃO DOS LIMIARES EXISTENTES POR NOVOS LIMIARES DE REDUÇÃO DO CALOR. AS VIDRAÇAS SUD-EXD-SUD-OVEST SERÃO EQUIPADAS COM UM REVESTIMENTO SELETIVO (VIDRO SOLAR CONTROLADO) DE VIDRO G, GL, N ELT; 0,35-ISOLAMENTO TÉRMICO DE ESTRUTURAS HORIZONTAIS E VERTICAIS: LONGO (Portuguese)
Property / summary: A FIM DE PROSSEGUIR OS OBJETIVOS DE MELHORIA DA EFICIÊNCIA ENERGÉTICA DO EDIFÍCIO EM QUESTÃO? CRIAR UM PROJETO ESPECÍFICO COM BASE NO SEGUINTE CONTEÚDO DOS DISPOSITIVOS: ESTÁ PREVISTA A REMOÇÃO DE QUAISQUER CAIXILHOS DE JANELAS EXISTENTES QUE NÃO CUMPRAM OS REQUISITOS DE DESEMPENHO ESTABELECIDOS NOS REQUISITOS MÍNIMOS 26/06/2015; EM PARALELO, CONTINUAS? A INSTALAÇÃO DE NOVAS JANELAS DE ALUMÍNIO, CORTE TÉRMICO, COM CÂMARA VETRO BASO-BAIXA EMISSÃO (BE), CUMPRINDO OS REQUISITOS DE DESEMPENHO DO DECRETO MINISTERIAL N.º 16.02.2016 (CONTA TÉRMICA 2.0) COM HEW ELT; 1,67 W7M.K. A INSTALAÇÃO AVTRR? COM ESPECIAL ATENÇÃO À CORREÇÃO DA D.C.? PARA PONTES TÉRMICAS? POR CONSEGUINTE, PREVÊ IGUALMENTE A SUBSTITUIÇÃO DOS LIMIARES EXISTENTES POR NOVOS LIMIARES DE REDUÇÃO DO CALOR. AS VIDRAÇAS SUD-EXD-SUD-OVEST SERÃO EQUIPADAS COM UM REVESTIMENTO SELETIVO (VIDRO SOLAR CONTROLADO) DE VIDRO G, GL, N ELT; 0,35-ISOLAMENTO TÉRMICO DE ESTRUTURAS HORIZONTAIS E VERTICAIS: LONGO (Portuguese) / rank
 
Normal rank
Property / summary: A FIM DE PROSSEGUIR OS OBJETIVOS DE MELHORIA DA EFICIÊNCIA ENERGÉTICA DO EDIFÍCIO EM QUESTÃO? CRIAR UM PROJETO ESPECÍFICO COM BASE NO SEGUINTE CONTEÚDO DOS DISPOSITIVOS: ESTÁ PREVISTA A REMOÇÃO DE QUAISQUER CAIXILHOS DE JANELAS EXISTENTES QUE NÃO CUMPRAM OS REQUISITOS DE DESEMPENHO ESTABELECIDOS NOS REQUISITOS MÍNIMOS 26/06/2015; EM PARALELO, CONTINUAS? A INSTALAÇÃO DE NOVAS JANELAS DE ALUMÍNIO, CORTE TÉRMICO, COM CÂMARA VETRO BASO-BAIXA EMISSÃO (BE), CUMPRINDO OS REQUISITOS DE DESEMPENHO DO DECRETO MINISTERIAL N.º 16.02.2016 (CONTA TÉRMICA 2.0) COM HEW ELT; 1,67 W7M.K. A INSTALAÇÃO AVTRR? COM ESPECIAL ATENÇÃO À CORREÇÃO DA D.C.? PARA PONTES TÉRMICAS? POR CONSEGUINTE, PREVÊ IGUALMENTE A SUBSTITUIÇÃO DOS LIMIARES EXISTENTES POR NOVOS LIMIARES DE REDUÇÃO DO CALOR. AS VIDRAÇAS SUD-EXD-SUD-OVEST SERÃO EQUIPADAS COM UM REVESTIMENTO SELETIVO (VIDRO SOLAR CONTROLADO) DE VIDRO G, GL, N ELT; 0,35-ISOLAMENTO TÉRMICO DE ESTRUTURAS HORIZONTAIS E VERTICAIS: LONGO (Portuguese) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
KYSEISEN RAKENNUKSEN ENERGIATEHOKKUUDEN PARANTAMISTA KOSKEVIEN TAVOITTEIDEN SAAVUTTAMISEKSI? PERUSTETAAN ERITYINEN HANKE, JOKA PERUSTUU SEURAAVIIN OTTELUIDEN SISÄLTÖÖN: SÄÄDETÄÄN SELLAISTEN OLEMASSA OLEVIEN IKKUNAKEHYSTEN POISTAMISESTA, JOTKA EIVÄT TÄYTÄ VÄHIMMÄISVAATIMUKSISSA 26/06/2015 VAHVISTETTUJA SUORITUSKYKYVAATIMUKSIA; MENETKÖ SAMAAN AIKAAN? ASENNETAAN UUDET ALUMIINISET, LÄMPÖLEIKKAUSIKKUNAT, JOISSA ON VETRO-CAMERA BASO-LOW-EMISSION (BE), JOKA TÄYTTÄÄ MINISTERIÖN ASETUKSEN NRO 16.02.2016 (LÄMPÖTILI 2.0) SUORITUSKYKYVAATIMUKSET JA HEW ELT; 1,67 W7M.K. AVTRR-ASENNUS? KIINNITTÄEN ERITYISTÄ HUOMIOTA C.D.:N KORJAAMISEEN? LÄMPÖSILTOJA VARTEN? SEN VUOKSI SIINÄ SÄÄDETÄÄN MYÖS NYKYISTEN KYNNYSARVOJEN KORVAAMISESTA UUSILLA LÄMMÖNLEIKKAUKSEN RAJA-ARVOILLA. SUD-EXD-SUD-OVEST-LASIT ON VARUSTETTU SELEKTIIVISELLÄ PINNOITTEELLA (AURINKOOHJATTU LASI), JOKA ON LASIA G, GL, N ELT; VAAKA- JA PYSTYRAKENTEIDEN 0,35-LÄMPÖERISTYS: PITKÄ (Finnish)
Property / summary: KYSEISEN RAKENNUKSEN ENERGIATEHOKKUUDEN PARANTAMISTA KOSKEVIEN TAVOITTEIDEN SAAVUTTAMISEKSI? PERUSTETAAN ERITYINEN HANKE, JOKA PERUSTUU SEURAAVIIN OTTELUIDEN SISÄLTÖÖN: SÄÄDETÄÄN SELLAISTEN OLEMASSA OLEVIEN IKKUNAKEHYSTEN POISTAMISESTA, JOTKA EIVÄT TÄYTÄ VÄHIMMÄISVAATIMUKSISSA 26/06/2015 VAHVISTETTUJA SUORITUSKYKYVAATIMUKSIA; MENETKÖ SAMAAN AIKAAN? ASENNETAAN UUDET ALUMIINISET, LÄMPÖLEIKKAUSIKKUNAT, JOISSA ON VETRO-CAMERA BASO-LOW-EMISSION (BE), JOKA TÄYTTÄÄ MINISTERIÖN ASETUKSEN NRO 16.02.2016 (LÄMPÖTILI 2.0) SUORITUSKYKYVAATIMUKSET JA HEW ELT; 1,67 W7M.K. AVTRR-ASENNUS? KIINNITTÄEN ERITYISTÄ HUOMIOTA C.D.:N KORJAAMISEEN? LÄMPÖSILTOJA VARTEN? SEN VUOKSI SIINÄ SÄÄDETÄÄN MYÖS NYKYISTEN KYNNYSARVOJEN KORVAAMISESTA UUSILLA LÄMMÖNLEIKKAUKSEN RAJA-ARVOILLA. SUD-EXD-SUD-OVEST-LASIT ON VARUSTETTU SELEKTIIVISELLÄ PINNOITTEELLA (AURINKOOHJATTU LASI), JOKA ON LASIA G, GL, N ELT; VAAKA- JA PYSTYRAKENTEIDEN 0,35-LÄMPÖERISTYS: PITKÄ (Finnish) / rank
 
Normal rank
Property / summary: KYSEISEN RAKENNUKSEN ENERGIATEHOKKUUDEN PARANTAMISTA KOSKEVIEN TAVOITTEIDEN SAAVUTTAMISEKSI? PERUSTETAAN ERITYINEN HANKE, JOKA PERUSTUU SEURAAVIIN OTTELUIDEN SISÄLTÖÖN: SÄÄDETÄÄN SELLAISTEN OLEMASSA OLEVIEN IKKUNAKEHYSTEN POISTAMISESTA, JOTKA EIVÄT TÄYTÄ VÄHIMMÄISVAATIMUKSISSA 26/06/2015 VAHVISTETTUJA SUORITUSKYKYVAATIMUKSIA; MENETKÖ SAMAAN AIKAAN? ASENNETAAN UUDET ALUMIINISET, LÄMPÖLEIKKAUSIKKUNAT, JOISSA ON VETRO-CAMERA BASO-LOW-EMISSION (BE), JOKA TÄYTTÄÄ MINISTERIÖN ASETUKSEN NRO 16.02.2016 (LÄMPÖTILI 2.0) SUORITUSKYKYVAATIMUKSET JA HEW ELT; 1,67 W7M.K. AVTRR-ASENNUS? KIINNITTÄEN ERITYISTÄ HUOMIOTA C.D.:N KORJAAMISEEN? LÄMPÖSILTOJA VARTEN? SEN VUOKSI SIINÄ SÄÄDETÄÄN MYÖS NYKYISTEN KYNNYSARVOJEN KORVAAMISESTA UUSILLA LÄMMÖNLEIKKAUKSEN RAJA-ARVOILLA. SUD-EXD-SUD-OVEST-LASIT ON VARUSTETTU SELEKTIIVISELLÄ PINNOITTEELLA (AURINKOOHJATTU LASI), JOKA ON LASIA G, GL, N ELT; VAAKA- JA PYSTYRAKENTEIDEN 0,35-LÄMPÖERISTYS: PITKÄ (Finnish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
W CELU REALIZACJI CELÓW POPRAWY EFEKTYWNOŚCI ENERGETYCZNEJ DANEGO BUDYNKU? SKONFIGURUJ KONKRETNY PROJEKT OPARTY NA NASTĘPUJĄCEJ TREŚCI URZĄDZEŃ: PRZEWIDZIANO USUNIĘCIE WSZELKICH ISTNIEJĄCYCH RAM OKIENNYCH, KTÓRE NIE SPEŁNIAJĄ WYMOGÓW DOTYCZĄCYCH OSIĄGÓW OKREŚLONYCH W MINIMALNYCH WYMAGANIACH 26/06/2015; RÓWNOLEGLE, KONTYNUUJESZ? INSTALACJA NOWYCH ALUMINIOWYCH OKIEN CIĘTYCH TERMICZNIE Z KAMERĄ VETRO-CAMERA BASO-NISKOEMISYJNĄ (BE), SPEŁNIAJĄCĄ WYMOGI EKSPLOATACYJNE OKREŚLONE W DEKRECIE MINISTERIALNYM NR 16.02.2016 (RACHUNEK TERMICZNY 2.0) Z HEW ELT; 1,67 W7M.K. INSTALACJA AVTRR? ZE SZCZEGÓLNYM UWZGLĘDNIENIEM KOREKTY C.D.? DO MOSTKÓW TERMICZNYCH? W ZWIĄZKU Z TYM PRZEWIDUJE SIĘ RÓWNIEŻ ZASTĄPIENIE ISTNIEJĄCYCH PROGÓW NOWYMI PROGAMI REDUKCJI CIEPŁA. SZYBY SUD-EXD-SUD-OVEST BĘDĄ WYPOSAŻONE W SELEKTYWNĄ POWŁOKĘ (SZKŁO STEROWANE SŁONECZNIE) ZE SZKŁA G, GL, N ELT; 0,35-IZOLACJA TERMICZNA KONSTRUKCJI POZIOMYCH I PIONOWYCH: DŁUGI (Polish)
Property / summary: W CELU REALIZACJI CELÓW POPRAWY EFEKTYWNOŚCI ENERGETYCZNEJ DANEGO BUDYNKU? SKONFIGURUJ KONKRETNY PROJEKT OPARTY NA NASTĘPUJĄCEJ TREŚCI URZĄDZEŃ: PRZEWIDZIANO USUNIĘCIE WSZELKICH ISTNIEJĄCYCH RAM OKIENNYCH, KTÓRE NIE SPEŁNIAJĄ WYMOGÓW DOTYCZĄCYCH OSIĄGÓW OKREŚLONYCH W MINIMALNYCH WYMAGANIACH 26/06/2015; RÓWNOLEGLE, KONTYNUUJESZ? INSTALACJA NOWYCH ALUMINIOWYCH OKIEN CIĘTYCH TERMICZNIE Z KAMERĄ VETRO-CAMERA BASO-NISKOEMISYJNĄ (BE), SPEŁNIAJĄCĄ WYMOGI EKSPLOATACYJNE OKREŚLONE W DEKRECIE MINISTERIALNYM NR 16.02.2016 (RACHUNEK TERMICZNY 2.0) Z HEW ELT; 1,67 W7M.K. INSTALACJA AVTRR? ZE SZCZEGÓLNYM UWZGLĘDNIENIEM KOREKTY C.D.? DO MOSTKÓW TERMICZNYCH? W ZWIĄZKU Z TYM PRZEWIDUJE SIĘ RÓWNIEŻ ZASTĄPIENIE ISTNIEJĄCYCH PROGÓW NOWYMI PROGAMI REDUKCJI CIEPŁA. SZYBY SUD-EXD-SUD-OVEST BĘDĄ WYPOSAŻONE W SELEKTYWNĄ POWŁOKĘ (SZKŁO STEROWANE SŁONECZNIE) ZE SZKŁA G, GL, N ELT; 0,35-IZOLACJA TERMICZNA KONSTRUKCJI POZIOMYCH I PIONOWYCH: DŁUGI (Polish) / rank
 
Normal rank
Property / summary: W CELU REALIZACJI CELÓW POPRAWY EFEKTYWNOŚCI ENERGETYCZNEJ DANEGO BUDYNKU? SKONFIGURUJ KONKRETNY PROJEKT OPARTY NA NASTĘPUJĄCEJ TREŚCI URZĄDZEŃ: PRZEWIDZIANO USUNIĘCIE WSZELKICH ISTNIEJĄCYCH RAM OKIENNYCH, KTÓRE NIE SPEŁNIAJĄ WYMOGÓW DOTYCZĄCYCH OSIĄGÓW OKREŚLONYCH W MINIMALNYCH WYMAGANIACH 26/06/2015; RÓWNOLEGLE, KONTYNUUJESZ? INSTALACJA NOWYCH ALUMINIOWYCH OKIEN CIĘTYCH TERMICZNIE Z KAMERĄ VETRO-CAMERA BASO-NISKOEMISYJNĄ (BE), SPEŁNIAJĄCĄ WYMOGI EKSPLOATACYJNE OKREŚLONE W DEKRECIE MINISTERIALNYM NR 16.02.2016 (RACHUNEK TERMICZNY 2.0) Z HEW ELT; 1,67 W7M.K. INSTALACJA AVTRR? ZE SZCZEGÓLNYM UWZGLĘDNIENIEM KOREKTY C.D.? DO MOSTKÓW TERMICZNYCH? W ZWIĄZKU Z TYM PRZEWIDUJE SIĘ RÓWNIEŻ ZASTĄPIENIE ISTNIEJĄCYCH PROGÓW NOWYMI PROGAMI REDUKCJI CIEPŁA. SZYBY SUD-EXD-SUD-OVEST BĘDĄ WYPOSAŻONE W SELEKTYWNĄ POWŁOKĘ (SZKŁO STEROWANE SŁONECZNIE) ZE SZKŁA G, GL, N ELT; 0,35-IZOLACJA TERMICZNA KONSTRUKCJI POZIOMYCH I PIONOWYCH: DŁUGI (Polish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
DA BI SLEDILI CILJEM IZBOLJŠANJA ENERGETSKE UČINKOVITOSTI ZADEVNE STAVBE? NASTAVITE POSEBEN PROJEKT, KI TEMELJI NA NASLEDNJI VSEBINI NAPELJAV: PREDVIDENA JE ODSTRANITEV VSEH OBSTOJEČIH OKENSKIH OKVIRJEV, KI NE IZPOLNJUJEJO ZAHTEV GLEDE UČINKOVITOSTI, DOLOČENIH V MINIMALNIH ZAHTEVAH 26/06/2015; VZPOREDNO, ALI NADALJUJEŠ? NAMESTITEV NOVEGA ALUMINIJA, TERMIČNO REZANEGA OKNA, Z VETRO-KAMERO BASO-NIZKOEMISIJSKO (BITI), KI IZPOLNJUJE ZAHTEVE GLEDE ZMOGLJIVOSTI IZ MINISTRSKE UREDBE ŠT. 16.02.2016 (TOPLOTNI RAČUN 2.0) S HEW ELT; 1,67 W7M.K. NAMESTITEV AVTRR? S POSEBNIM POUDARKOM NA POPRAVKU C.D.? ZA TOPLOTNE MOSTOVE? ZATO DOLOČA TUDI NADOMESTITEV OBSTOJEČIH PRAGOV Z NOVIMI PRAGOVI ZA ODVAJANJE TOPLOTE. ZASTEKLITEV SUD-EXD-SUD-OVEST BO OPREMLJENA S SELEKTIVNIM PREMAZOM (SONČNO NADZOROVANO STEKLO) IZ STEKLA G, GL, N ELT; 0,35-TERMIČNA IZOLACIJA VODORAVNIH IN NAVPIČNIH KONSTRUKCIJ: DOLGA (Slovenian)
Property / summary: DA BI SLEDILI CILJEM IZBOLJŠANJA ENERGETSKE UČINKOVITOSTI ZADEVNE STAVBE? NASTAVITE POSEBEN PROJEKT, KI TEMELJI NA NASLEDNJI VSEBINI NAPELJAV: PREDVIDENA JE ODSTRANITEV VSEH OBSTOJEČIH OKENSKIH OKVIRJEV, KI NE IZPOLNJUJEJO ZAHTEV GLEDE UČINKOVITOSTI, DOLOČENIH V MINIMALNIH ZAHTEVAH 26/06/2015; VZPOREDNO, ALI NADALJUJEŠ? NAMESTITEV NOVEGA ALUMINIJA, TERMIČNO REZANEGA OKNA, Z VETRO-KAMERO BASO-NIZKOEMISIJSKO (BITI), KI IZPOLNJUJE ZAHTEVE GLEDE ZMOGLJIVOSTI IZ MINISTRSKE UREDBE ŠT. 16.02.2016 (TOPLOTNI RAČUN 2.0) S HEW ELT; 1,67 W7M.K. NAMESTITEV AVTRR? S POSEBNIM POUDARKOM NA POPRAVKU C.D.? ZA TOPLOTNE MOSTOVE? ZATO DOLOČA TUDI NADOMESTITEV OBSTOJEČIH PRAGOV Z NOVIMI PRAGOVI ZA ODVAJANJE TOPLOTE. ZASTEKLITEV SUD-EXD-SUD-OVEST BO OPREMLJENA S SELEKTIVNIM PREMAZOM (SONČNO NADZOROVANO STEKLO) IZ STEKLA G, GL, N ELT; 0,35-TERMIČNA IZOLACIJA VODORAVNIH IN NAVPIČNIH KONSTRUKCIJ: DOLGA (Slovenian) / rank
 
Normal rank
Property / summary: DA BI SLEDILI CILJEM IZBOLJŠANJA ENERGETSKE UČINKOVITOSTI ZADEVNE STAVBE? NASTAVITE POSEBEN PROJEKT, KI TEMELJI NA NASLEDNJI VSEBINI NAPELJAV: PREDVIDENA JE ODSTRANITEV VSEH OBSTOJEČIH OKENSKIH OKVIRJEV, KI NE IZPOLNJUJEJO ZAHTEV GLEDE UČINKOVITOSTI, DOLOČENIH V MINIMALNIH ZAHTEVAH 26/06/2015; VZPOREDNO, ALI NADALJUJEŠ? NAMESTITEV NOVEGA ALUMINIJA, TERMIČNO REZANEGA OKNA, Z VETRO-KAMERO BASO-NIZKOEMISIJSKO (BITI), KI IZPOLNJUJE ZAHTEVE GLEDE ZMOGLJIVOSTI IZ MINISTRSKE UREDBE ŠT. 16.02.2016 (TOPLOTNI RAČUN 2.0) S HEW ELT; 1,67 W7M.K. NAMESTITEV AVTRR? S POSEBNIM POUDARKOM NA POPRAVKU C.D.? ZA TOPLOTNE MOSTOVE? ZATO DOLOČA TUDI NADOMESTITEV OBSTOJEČIH PRAGOV Z NOVIMI PRAGOVI ZA ODVAJANJE TOPLOTE. ZASTEKLITEV SUD-EXD-SUD-OVEST BO OPREMLJENA S SELEKTIVNIM PREMAZOM (SONČNO NADZOROVANO STEKLO) IZ STEKLA G, GL, N ELT; 0,35-TERMIČNA IZOLACIJA VODORAVNIH IN NAVPIČNIH KONSTRUKCIJ: DOLGA (Slovenian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
ZA ÚČELEM DOSAŽENÍ CÍLŮ ZLEPŠENÍ ENERGETICKÉ ÚČINNOSTI DOTČENÉ BUDOVY? VYTVOŘIT KONKRÉTNÍ PROJEKT ZALOŽENÝ NA NÁSLEDUJÍCÍM OBSAHU SVÍTIDEL: BYLA PŘIJATA OPATŘENÍ PRO ODSTRANĚNÍ JAKÝCHKOLI STÁVAJÍCÍCH OKENNÍCH RÁMŮ, KTERÉ NESPLŇUJÍ POŽADAVKY NA VÝKONNOST STANOVENÉ V MINIMÁLNÍCH POŽADAVCÍCH 26/06/2015; PARALELNĚ POKRAČUJETE? INSTALACE NOVÝCH HLINÍKOVÝCH, TEPELNĚ ŘEZANÝCH OKEN S VETRO-KAMERA BASO-LOW-EMISE (BE), SPLŇUJÍCÍ VÝKONNOSTNÍ POŽADAVKY MINISTERSKÉ VYHLÁŠKY Č. 16.02.2016 (TEPELNÝ ÚČET 2.0) SE HEW ELT; 1,67 W7M.K. INSTALACE AVTRR? SE ZVLÁŠTNÍ POZORNOSTÍ VĚNOVANOU KOREKCI C.D.? PRO TEPELNÉ MOSTY? STANOVÍ PROTO ROVNĚŽ NAHRAZENÍ STÁVAJÍCÍCH PRAHOVÝCH HODNOT NOVÝMI PRAHOVÝMI HODNOTAMI PRO SNÍŽENÍ TEPLA. ZASKLENÍ SUD-EXD-SUD-OVEST BUDE VYBAVENO SELEKTIVNÍM POVLAKEM (SOLÁRNÍ KONTROLOVANÉ SKLO) ZE SKLA G, GL, N ELT; 0,35-TEPELNÁ IZOLACE VODOROVNÝCH A SVISLÝCH KONSTRUKCÍ: DLOUHÁ (Czech)
Property / summary: ZA ÚČELEM DOSAŽENÍ CÍLŮ ZLEPŠENÍ ENERGETICKÉ ÚČINNOSTI DOTČENÉ BUDOVY? VYTVOŘIT KONKRÉTNÍ PROJEKT ZALOŽENÝ NA NÁSLEDUJÍCÍM OBSAHU SVÍTIDEL: BYLA PŘIJATA OPATŘENÍ PRO ODSTRANĚNÍ JAKÝCHKOLI STÁVAJÍCÍCH OKENNÍCH RÁMŮ, KTERÉ NESPLŇUJÍ POŽADAVKY NA VÝKONNOST STANOVENÉ V MINIMÁLNÍCH POŽADAVCÍCH 26/06/2015; PARALELNĚ POKRAČUJETE? INSTALACE NOVÝCH HLINÍKOVÝCH, TEPELNĚ ŘEZANÝCH OKEN S VETRO-KAMERA BASO-LOW-EMISE (BE), SPLŇUJÍCÍ VÝKONNOSTNÍ POŽADAVKY MINISTERSKÉ VYHLÁŠKY Č. 16.02.2016 (TEPELNÝ ÚČET 2.0) SE HEW ELT; 1,67 W7M.K. INSTALACE AVTRR? SE ZVLÁŠTNÍ POZORNOSTÍ VĚNOVANOU KOREKCI C.D.? PRO TEPELNÉ MOSTY? STANOVÍ PROTO ROVNĚŽ NAHRAZENÍ STÁVAJÍCÍCH PRAHOVÝCH HODNOT NOVÝMI PRAHOVÝMI HODNOTAMI PRO SNÍŽENÍ TEPLA. ZASKLENÍ SUD-EXD-SUD-OVEST BUDE VYBAVENO SELEKTIVNÍM POVLAKEM (SOLÁRNÍ KONTROLOVANÉ SKLO) ZE SKLA G, GL, N ELT; 0,35-TEPELNÁ IZOLACE VODOROVNÝCH A SVISLÝCH KONSTRUKCÍ: DLOUHÁ (Czech) / rank
 
Normal rank
Property / summary: ZA ÚČELEM DOSAŽENÍ CÍLŮ ZLEPŠENÍ ENERGETICKÉ ÚČINNOSTI DOTČENÉ BUDOVY? VYTVOŘIT KONKRÉTNÍ PROJEKT ZALOŽENÝ NA NÁSLEDUJÍCÍM OBSAHU SVÍTIDEL: BYLA PŘIJATA OPATŘENÍ PRO ODSTRANĚNÍ JAKÝCHKOLI STÁVAJÍCÍCH OKENNÍCH RÁMŮ, KTERÉ NESPLŇUJÍ POŽADAVKY NA VÝKONNOST STANOVENÉ V MINIMÁLNÍCH POŽADAVCÍCH 26/06/2015; PARALELNĚ POKRAČUJETE? INSTALACE NOVÝCH HLINÍKOVÝCH, TEPELNĚ ŘEZANÝCH OKEN S VETRO-KAMERA BASO-LOW-EMISE (BE), SPLŇUJÍCÍ VÝKONNOSTNÍ POŽADAVKY MINISTERSKÉ VYHLÁŠKY Č. 16.02.2016 (TEPELNÝ ÚČET 2.0) SE HEW ELT; 1,67 W7M.K. INSTALACE AVTRR? SE ZVLÁŠTNÍ POZORNOSTÍ VĚNOVANOU KOREKCI C.D.? PRO TEPELNÉ MOSTY? STANOVÍ PROTO ROVNĚŽ NAHRAZENÍ STÁVAJÍCÍCH PRAHOVÝCH HODNOT NOVÝMI PRAHOVÝMI HODNOTAMI PRO SNÍŽENÍ TEPLA. ZASKLENÍ SUD-EXD-SUD-OVEST BUDE VYBAVENO SELEKTIVNÍM POVLAKEM (SOLÁRNÍ KONTROLOVANÉ SKLO) ZE SKLA G, GL, N ELT; 0,35-TEPELNÁ IZOLACE VODOROVNÝCH A SVISLÝCH KONSTRUKCÍ: DLOUHÁ (Czech) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
SIEKIANT PADIDINTI ATITINKAMO PASTATO ENERGIJOS VARTOJIMO EFEKTYVUMĄ? SUKURKITE KONKRETŲ PROJEKTĄ, PAGRĮSTĄ ŠIUO ARMATŪRA TURINIU: NUMATOMA GALIMYBĖ PAŠALINTI VISUS ESAMUS LANGŲ RĖMUS, KURIE NEATITINKA BŪTINIAUSIUOSE REIKALAVIMUOSE NR. 26/06/2015 NUSTATYTŲ EKSPLOATACINIŲ SAVYBIŲ REIKALAVIMŲ; TUO PAT METU JŪS EINATE? NAUJŲ ALIUMINIO, TERMINIO PJOVIMO LANGŲ SU VETRO-CAMERA BASO-MAŽOS EMISIJOS (BE), ATITINKANČIŲ 2016 M. VASARIO 16 D. MINISTRO DEKRETE NR. 16.02.2016 (TERMINĖ SĄSKAITA 2.0) NUSTATYTUS VEIKSMINGUMO REIKALAVIMUS, ĮRENGIMAS SU ELT; 1,67 W7M.K. AVTRR ĮRENGINYS? YPATINGĄ DĖMESĮ SKIRIANT C.D. KOREKCIJAI? DĖL ŠILUMINIŲ TILTŲ? TODĖL JAME TAIP PAT NUMATYTA PAKEISTI ESAMAS RIBINES VERTES NAUJOMIS ŠILUMOS ATKARPOS RIBINĖMIS VERTĖMIS. SUD-EXD-SUD-OVEST ĮSTIKLINIMO STIKLAS BUS PADENGTAS SELEKTYVIĄJA STIKLO G, GL, N ELT DANGA (SAULĖS VALDOMAS STIKLAS); 0,35-HORIZONTALIŲJŲ IR VERTIKALIŲJŲ KONSTRUKCIJŲ IZOLIACIJA: ILGAS (Lithuanian)
Property / summary: SIEKIANT PADIDINTI ATITINKAMO PASTATO ENERGIJOS VARTOJIMO EFEKTYVUMĄ? SUKURKITE KONKRETŲ PROJEKTĄ, PAGRĮSTĄ ŠIUO ARMATŪRA TURINIU: NUMATOMA GALIMYBĖ PAŠALINTI VISUS ESAMUS LANGŲ RĖMUS, KURIE NEATITINKA BŪTINIAUSIUOSE REIKALAVIMUOSE NR. 26/06/2015 NUSTATYTŲ EKSPLOATACINIŲ SAVYBIŲ REIKALAVIMŲ; TUO PAT METU JŪS EINATE? NAUJŲ ALIUMINIO, TERMINIO PJOVIMO LANGŲ SU VETRO-CAMERA BASO-MAŽOS EMISIJOS (BE), ATITINKANČIŲ 2016 M. VASARIO 16 D. MINISTRO DEKRETE NR. 16.02.2016 (TERMINĖ SĄSKAITA 2.0) NUSTATYTUS VEIKSMINGUMO REIKALAVIMUS, ĮRENGIMAS SU ELT; 1,67 W7M.K. AVTRR ĮRENGINYS? YPATINGĄ DĖMESĮ SKIRIANT C.D. KOREKCIJAI? DĖL ŠILUMINIŲ TILTŲ? TODĖL JAME TAIP PAT NUMATYTA PAKEISTI ESAMAS RIBINES VERTES NAUJOMIS ŠILUMOS ATKARPOS RIBINĖMIS VERTĖMIS. SUD-EXD-SUD-OVEST ĮSTIKLINIMO STIKLAS BUS PADENGTAS SELEKTYVIĄJA STIKLO G, GL, N ELT DANGA (SAULĖS VALDOMAS STIKLAS); 0,35-HORIZONTALIŲJŲ IR VERTIKALIŲJŲ KONSTRUKCIJŲ IZOLIACIJA: ILGAS (Lithuanian) / rank
 
Normal rank
Property / summary: SIEKIANT PADIDINTI ATITINKAMO PASTATO ENERGIJOS VARTOJIMO EFEKTYVUMĄ? SUKURKITE KONKRETŲ PROJEKTĄ, PAGRĮSTĄ ŠIUO ARMATŪRA TURINIU: NUMATOMA GALIMYBĖ PAŠALINTI VISUS ESAMUS LANGŲ RĖMUS, KURIE NEATITINKA BŪTINIAUSIUOSE REIKALAVIMUOSE NR. 26/06/2015 NUSTATYTŲ EKSPLOATACINIŲ SAVYBIŲ REIKALAVIMŲ; TUO PAT METU JŪS EINATE? NAUJŲ ALIUMINIO, TERMINIO PJOVIMO LANGŲ SU VETRO-CAMERA BASO-MAŽOS EMISIJOS (BE), ATITINKANČIŲ 2016 M. VASARIO 16 D. MINISTRO DEKRETE NR. 16.02.2016 (TERMINĖ SĄSKAITA 2.0) NUSTATYTUS VEIKSMINGUMO REIKALAVIMUS, ĮRENGIMAS SU ELT; 1,67 W7M.K. AVTRR ĮRENGINYS? YPATINGĄ DĖMESĮ SKIRIANT C.D. KOREKCIJAI? DĖL ŠILUMINIŲ TILTŲ? TODĖL JAME TAIP PAT NUMATYTA PAKEISTI ESAMAS RIBINES VERTES NAUJOMIS ŠILUMOS ATKARPOS RIBINĖMIS VERTĖMIS. SUD-EXD-SUD-OVEST ĮSTIKLINIMO STIKLAS BUS PADENGTAS SELEKTYVIĄJA STIKLO G, GL, N ELT DANGA (SAULĖS VALDOMAS STIKLAS); 0,35-HORIZONTALIŲJŲ IR VERTIKALIŲJŲ KONSTRUKCIJŲ IZOLIACIJA: ILGAS (Lithuanian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
LAI SASNIEGTU ATTIECĪGĀS ĒKAS ENERGOEFEKTIVITĀTES UZLABOŠANAS MĒRĶUS? IZVEIDO ĪPAŠU PROJEKTU, KURA PAMATĀ IR ŠĀDS ARMATŪRAS SATURS: IR PAREDZĒTS LIKVIDĒT JEBKĀDUS ESOŠUS LOGU RĀMJUS, KAS NEATBILST MINIMĀLAJĀM PRASĪBĀS NR. 26/06/2015 NOTEIKTAJĀM VEIKTSPĒJAS PRASĪBĀM; PARALĒLI, VAI JŪS TURPINĀT? JAUNU ALUMĪNIJA, TERMISKO GRIEZUMU WINDOWS AR VETRO-CAMERA BASO ZEMU EMISIJU (BE) UZSTĀDĪŠANU, KAS ATBILST MINISTRIJAS DEKRĒTA NR. 16.02.2016 (TERMISKAIS KONTS 2.0) AR HEW ELT VEIKTSPĒJAS PRASĪBĀM; 1,67 W7M.K. AVTRR INSTALĀCIJA? ĪPAŠU UZMANĪBU PIEVĒRŠOT C.D. KOREKCIJAI? TERMISKAJIEM TILTIEM? TĀPĒC TAS ARĪ PAREDZ AIZSTĀT ESOŠOS SLIEKŠŅUS AR JAUNIEM SILTUMA SAMAZINĀŠANAS SLIEKŠŅIEM. SUD-EXD-SUD-OVEST STIKLOJUMS BŪS APRĪKOTS AR SELEKTĪVU PĀRKLĀJUMU (SAULES VADĀMAIS STIKLS) NO STIKLA G, GL, N ELT; 0,35-SILTUMIZOLĀCIJA HORIZONTĀLĀM UN VERTIKĀLĀM KONSTRUKCIJĀM: GARŠ (Latvian)
Property / summary: LAI SASNIEGTU ATTIECĪGĀS ĒKAS ENERGOEFEKTIVITĀTES UZLABOŠANAS MĒRĶUS? IZVEIDO ĪPAŠU PROJEKTU, KURA PAMATĀ IR ŠĀDS ARMATŪRAS SATURS: IR PAREDZĒTS LIKVIDĒT JEBKĀDUS ESOŠUS LOGU RĀMJUS, KAS NEATBILST MINIMĀLAJĀM PRASĪBĀS NR. 26/06/2015 NOTEIKTAJĀM VEIKTSPĒJAS PRASĪBĀM; PARALĒLI, VAI JŪS TURPINĀT? JAUNU ALUMĪNIJA, TERMISKO GRIEZUMU WINDOWS AR VETRO-CAMERA BASO ZEMU EMISIJU (BE) UZSTĀDĪŠANU, KAS ATBILST MINISTRIJAS DEKRĒTA NR. 16.02.2016 (TERMISKAIS KONTS 2.0) AR HEW ELT VEIKTSPĒJAS PRASĪBĀM; 1,67 W7M.K. AVTRR INSTALĀCIJA? ĪPAŠU UZMANĪBU PIEVĒRŠOT C.D. KOREKCIJAI? TERMISKAJIEM TILTIEM? TĀPĒC TAS ARĪ PAREDZ AIZSTĀT ESOŠOS SLIEKŠŅUS AR JAUNIEM SILTUMA SAMAZINĀŠANAS SLIEKŠŅIEM. SUD-EXD-SUD-OVEST STIKLOJUMS BŪS APRĪKOTS AR SELEKTĪVU PĀRKLĀJUMU (SAULES VADĀMAIS STIKLS) NO STIKLA G, GL, N ELT; 0,35-SILTUMIZOLĀCIJA HORIZONTĀLĀM UN VERTIKĀLĀM KONSTRUKCIJĀM: GARŠ (Latvian) / rank
 
Normal rank
Property / summary: LAI SASNIEGTU ATTIECĪGĀS ĒKAS ENERGOEFEKTIVITĀTES UZLABOŠANAS MĒRĶUS? IZVEIDO ĪPAŠU PROJEKTU, KURA PAMATĀ IR ŠĀDS ARMATŪRAS SATURS: IR PAREDZĒTS LIKVIDĒT JEBKĀDUS ESOŠUS LOGU RĀMJUS, KAS NEATBILST MINIMĀLAJĀM PRASĪBĀS NR. 26/06/2015 NOTEIKTAJĀM VEIKTSPĒJAS PRASĪBĀM; PARALĒLI, VAI JŪS TURPINĀT? JAUNU ALUMĪNIJA, TERMISKO GRIEZUMU WINDOWS AR VETRO-CAMERA BASO ZEMU EMISIJU (BE) UZSTĀDĪŠANU, KAS ATBILST MINISTRIJAS DEKRĒTA NR. 16.02.2016 (TERMISKAIS KONTS 2.0) AR HEW ELT VEIKTSPĒJAS PRASĪBĀM; 1,67 W7M.K. AVTRR INSTALĀCIJA? ĪPAŠU UZMANĪBU PIEVĒRŠOT C.D. KOREKCIJAI? TERMISKAJIEM TILTIEM? TĀPĒC TAS ARĪ PAREDZ AIZSTĀT ESOŠOS SLIEKŠŅUS AR JAUNIEM SILTUMA SAMAZINĀŠANAS SLIEKŠŅIEM. SUD-EXD-SUD-OVEST STIKLOJUMS BŪS APRĪKOTS AR SELEKTĪVU PĀRKLĀJUMU (SAULES VADĀMAIS STIKLS) NO STIKLA G, GL, N ELT; 0,35-SILTUMIZOLĀCIJA HORIZONTĀLĀM UN VERTIKĀLĀM KONSTRUKCIJĀM: GARŠ (Latvian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
С ЦЕЛ ПОСТИГАНЕ НА ЦЕЛИТЕ ЗА ПОДОБРЯВАНЕ НА ЕНЕРГИЙНАТА ЕФЕКТИВНОСТ НА ВЪПРОСНАТА СГРАДА? СЪЗДАВАНЕ НА КОНКРЕТЕН ПРОЕКТ ВЪЗ ОСНОВА НА СЛЕДНОТО СЪДЪРЖАНИЕ НА ОСВЕТИТЕЛНИТЕ ТЕЛА: ПРЕДВИЖДА СЕ ПРЕМАХВАНЕТО НА ВСИЧКИ СЪЩЕСТВУВАЩИ ДОГРАМА, КОИТО НЕ ОТГОВАРЯТ НА ЕКСПЛОАТАЦИОННИТЕ ИЗИСКВАНИЯ, ОПРЕДЕЛЕНИ В МИНИМАЛНИТЕ ИЗИСКВАНИЯ 26.6.2015 Г.; УСПОРЕДНО С ТОВА, ПРОДЪЛЖАВАТЕ ЛИ? ИНСТАЛИРАНЕТО НА НОВИ ПРОЗОРЦИ ЗА ТЕРМИЧНО РЯЗАНЕ НА АЛУМИНИЙ С ВЕТРОКАМЕРА BASO С НИСКИ ЕМИСИИ (BE), КОИТО ОТГОВАРЯТ НА ИЗИСКВАНИЯТА ЗА ЕФЕКТИВНОСТ НА МИНИСТЕРСКИ УКАЗ № 16.02.2016 Г. (ТЕРМИЧНА СМЕТКА 2.0) С ИЗКАЧЕН ELT; 1,67 W7M.K. ИНСТАЛАЦИЯТА AVTRR? С ОСОБЕНО ВНИМАНИЕ КЪМ КОРЕКЦИЯТА НА C.D.? ЗА ТОПЛИННИ МОСТОВЕ? ПОРАДИ ТОВА В НЕГО СЪЩО ТАКА СЕ ПРЕДВИЖДА ЗАМЯНАТА НА СЪЩЕСТВУВАЩИТЕ ПРАГОВЕ С НОВИ ПРАГОВЕ ЗА НАМАЛЯВАНЕ НА ТОПЛИННАТА ЕНЕРГИЯ. СТЪКЛОТО SUD-EXD-SUD-OVEST ЩЕ БЪДЕ ОБОРУДВАНО СЪС СЕЛЕКТИВНО ПОКРИТИЕ (СЛЪНЧЕВО КОНТРОЛИРАНО СТЪКЛО) ОТ СТЪКЛО G, GL, N ELT; 0,35-ТЕРМИЧНА ИЗОЛАЦИЯ НА ХОРИЗОНТАЛНИ И ВЕРТИКАЛНИ КОНСТРУКЦИИ: ДЪЛЪГ (Bulgarian)
Property / summary: С ЦЕЛ ПОСТИГАНЕ НА ЦЕЛИТЕ ЗА ПОДОБРЯВАНЕ НА ЕНЕРГИЙНАТА ЕФЕКТИВНОСТ НА ВЪПРОСНАТА СГРАДА? СЪЗДАВАНЕ НА КОНКРЕТЕН ПРОЕКТ ВЪЗ ОСНОВА НА СЛЕДНОТО СЪДЪРЖАНИЕ НА ОСВЕТИТЕЛНИТЕ ТЕЛА: ПРЕДВИЖДА СЕ ПРЕМАХВАНЕТО НА ВСИЧКИ СЪЩЕСТВУВАЩИ ДОГРАМА, КОИТО НЕ ОТГОВАРЯТ НА ЕКСПЛОАТАЦИОННИТЕ ИЗИСКВАНИЯ, ОПРЕДЕЛЕНИ В МИНИМАЛНИТЕ ИЗИСКВАНИЯ 26.6.2015 Г.; УСПОРЕДНО С ТОВА, ПРОДЪЛЖАВАТЕ ЛИ? ИНСТАЛИРАНЕТО НА НОВИ ПРОЗОРЦИ ЗА ТЕРМИЧНО РЯЗАНЕ НА АЛУМИНИЙ С ВЕТРОКАМЕРА BASO С НИСКИ ЕМИСИИ (BE), КОИТО ОТГОВАРЯТ НА ИЗИСКВАНИЯТА ЗА ЕФЕКТИВНОСТ НА МИНИСТЕРСКИ УКАЗ № 16.02.2016 Г. (ТЕРМИЧНА СМЕТКА 2.0) С ИЗКАЧЕН ELT; 1,67 W7M.K. ИНСТАЛАЦИЯТА AVTRR? С ОСОБЕНО ВНИМАНИЕ КЪМ КОРЕКЦИЯТА НА C.D.? ЗА ТОПЛИННИ МОСТОВЕ? ПОРАДИ ТОВА В НЕГО СЪЩО ТАКА СЕ ПРЕДВИЖДА ЗАМЯНАТА НА СЪЩЕСТВУВАЩИТЕ ПРАГОВЕ С НОВИ ПРАГОВЕ ЗА НАМАЛЯВАНЕ НА ТОПЛИННАТА ЕНЕРГИЯ. СТЪКЛОТО SUD-EXD-SUD-OVEST ЩЕ БЪДЕ ОБОРУДВАНО СЪС СЕЛЕКТИВНО ПОКРИТИЕ (СЛЪНЧЕВО КОНТРОЛИРАНО СТЪКЛО) ОТ СТЪКЛО G, GL, N ELT; 0,35-ТЕРМИЧНА ИЗОЛАЦИЯ НА ХОРИЗОНТАЛНИ И ВЕРТИКАЛНИ КОНСТРУКЦИИ: ДЪЛЪГ (Bulgarian) / rank
 
Normal rank
Property / summary: С ЦЕЛ ПОСТИГАНЕ НА ЦЕЛИТЕ ЗА ПОДОБРЯВАНЕ НА ЕНЕРГИЙНАТА ЕФЕКТИВНОСТ НА ВЪПРОСНАТА СГРАДА? СЪЗДАВАНЕ НА КОНКРЕТЕН ПРОЕКТ ВЪЗ ОСНОВА НА СЛЕДНОТО СЪДЪРЖАНИЕ НА ОСВЕТИТЕЛНИТЕ ТЕЛА: ПРЕДВИЖДА СЕ ПРЕМАХВАНЕТО НА ВСИЧКИ СЪЩЕСТВУВАЩИ ДОГРАМА, КОИТО НЕ ОТГОВАРЯТ НА ЕКСПЛОАТАЦИОННИТЕ ИЗИСКВАНИЯ, ОПРЕДЕЛЕНИ В МИНИМАЛНИТЕ ИЗИСКВАНИЯ 26.6.2015 Г.; УСПОРЕДНО С ТОВА, ПРОДЪЛЖАВАТЕ ЛИ? ИНСТАЛИРАНЕТО НА НОВИ ПРОЗОРЦИ ЗА ТЕРМИЧНО РЯЗАНЕ НА АЛУМИНИЙ С ВЕТРОКАМЕРА BASO С НИСКИ ЕМИСИИ (BE), КОИТО ОТГОВАРЯТ НА ИЗИСКВАНИЯТА ЗА ЕФЕКТИВНОСТ НА МИНИСТЕРСКИ УКАЗ № 16.02.2016 Г. (ТЕРМИЧНА СМЕТКА 2.0) С ИЗКАЧЕН ELT; 1,67 W7M.K. ИНСТАЛАЦИЯТА AVTRR? С ОСОБЕНО ВНИМАНИЕ КЪМ КОРЕКЦИЯТА НА C.D.? ЗА ТОПЛИННИ МОСТОВЕ? ПОРАДИ ТОВА В НЕГО СЪЩО ТАКА СЕ ПРЕДВИЖДА ЗАМЯНАТА НА СЪЩЕСТВУВАЩИТЕ ПРАГОВЕ С НОВИ ПРАГОВЕ ЗА НАМАЛЯВАНЕ НА ТОПЛИННАТА ЕНЕРГИЯ. СТЪКЛОТО SUD-EXD-SUD-OVEST ЩЕ БЪДЕ ОБОРУДВАНО СЪС СЕЛЕКТИВНО ПОКРИТИЕ (СЛЪНЧЕВО КОНТРОЛИРАНО СТЪКЛО) ОТ СТЪКЛО G, GL, N ELT; 0,35-ТЕРМИЧНА ИЗОЛАЦИЯ НА ХОРИЗОНТАЛНИ И ВЕРТИКАЛНИ КОНСТРУКЦИИ: ДЪЛЪГ (Bulgarian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
A SZÓBAN FORGÓ ÉPÜLET ENERGIAHATÉKONYSÁGÁNAK JAVÍTÁSÁRA IRÁNYULÓ CÉLKITŰZÉSEK MEGVALÓSÍTÁSA ÉRDEKÉBEN? HOZZON LÉTRE EGY KONKRÉT PROJEKTET A KÖVETKEZŐ TARTALMAK ALAPJÁN: RENDELKEZNI KELL MINDEN OLYAN MEGLÉVŐ ABLAKKERET ELTÁVOLÍTÁSÁRÓL, AMELY NEM FELEL MEG A 2015. JÚNIUS 26-I MINIMUMKÖVETELMÉNYEKBEN MEGHATÁROZOTT TELJESÍTMÉNYKÖVETELMÉNYEKNEK; EZZEL PÁRHUZAMOSAN FOLYTATOD? ÚJ ALUMÍNIUM, HŐKEZELT ABLAKOK TELEPÍTÉSE A VETRO-CAMERA BASO-ALACSONY KIBOCSÁTÁSÚ (BE) RENDSZERREL, AMELY MEGFELEL A 16.02.2016. SZ. MINISZTERI RENDELET TELJESÍTMÉNYKÖVETELMÉNYEINEK (2.0. HŐSZÁMLA) A NYÉL ELT-VEL; 1,67 W7M.K. AZ AVTRR TELEPÍTÉSE? KÜLÖNÖS TEKINTETTEL A C.D. KORREKCIÓJÁRA? HŐHIDAKRA? EZÉRT AZT IS ELŐÍRJA, HOGY A MEGLÉVŐ KÜSZÖBÉRTÉKEKET ÚJ HŐCSÖKKENTÉSI KÜSZÖBÉRTÉKEKKEL KELL FELVÁLTANI. A SUD-EXD-SUD-OVEST ÜVEGEZÉST ÜVEG G, GL, N ELT SZELEKTÍV BEVONATTAL (NAPVEZÉRLÉSŰ ÜVEG) SZERELIK FEL; 0,35-HŐSZIGETELÉS VÍZSZINTES ÉS FÜGGŐLEGES SZERKEZETEK ESETÉBEN: HOSSZÚ (Hungarian)
Property / summary: A SZÓBAN FORGÓ ÉPÜLET ENERGIAHATÉKONYSÁGÁNAK JAVÍTÁSÁRA IRÁNYULÓ CÉLKITŰZÉSEK MEGVALÓSÍTÁSA ÉRDEKÉBEN? HOZZON LÉTRE EGY KONKRÉT PROJEKTET A KÖVETKEZŐ TARTALMAK ALAPJÁN: RENDELKEZNI KELL MINDEN OLYAN MEGLÉVŐ ABLAKKERET ELTÁVOLÍTÁSÁRÓL, AMELY NEM FELEL MEG A 2015. JÚNIUS 26-I MINIMUMKÖVETELMÉNYEKBEN MEGHATÁROZOTT TELJESÍTMÉNYKÖVETELMÉNYEKNEK; EZZEL PÁRHUZAMOSAN FOLYTATOD? ÚJ ALUMÍNIUM, HŐKEZELT ABLAKOK TELEPÍTÉSE A VETRO-CAMERA BASO-ALACSONY KIBOCSÁTÁSÚ (BE) RENDSZERREL, AMELY MEGFELEL A 16.02.2016. SZ. MINISZTERI RENDELET TELJESÍTMÉNYKÖVETELMÉNYEINEK (2.0. HŐSZÁMLA) A NYÉL ELT-VEL; 1,67 W7M.K. AZ AVTRR TELEPÍTÉSE? KÜLÖNÖS TEKINTETTEL A C.D. KORREKCIÓJÁRA? HŐHIDAKRA? EZÉRT AZT IS ELŐÍRJA, HOGY A MEGLÉVŐ KÜSZÖBÉRTÉKEKET ÚJ HŐCSÖKKENTÉSI KÜSZÖBÉRTÉKEKKEL KELL FELVÁLTANI. A SUD-EXD-SUD-OVEST ÜVEGEZÉST ÜVEG G, GL, N ELT SZELEKTÍV BEVONATTAL (NAPVEZÉRLÉSŰ ÜVEG) SZERELIK FEL; 0,35-HŐSZIGETELÉS VÍZSZINTES ÉS FÜGGŐLEGES SZERKEZETEK ESETÉBEN: HOSSZÚ (Hungarian) / rank
 
Normal rank
Property / summary: A SZÓBAN FORGÓ ÉPÜLET ENERGIAHATÉKONYSÁGÁNAK JAVÍTÁSÁRA IRÁNYULÓ CÉLKITŰZÉSEK MEGVALÓSÍTÁSA ÉRDEKÉBEN? HOZZON LÉTRE EGY KONKRÉT PROJEKTET A KÖVETKEZŐ TARTALMAK ALAPJÁN: RENDELKEZNI KELL MINDEN OLYAN MEGLÉVŐ ABLAKKERET ELTÁVOLÍTÁSÁRÓL, AMELY NEM FELEL MEG A 2015. JÚNIUS 26-I MINIMUMKÖVETELMÉNYEKBEN MEGHATÁROZOTT TELJESÍTMÉNYKÖVETELMÉNYEKNEK; EZZEL PÁRHUZAMOSAN FOLYTATOD? ÚJ ALUMÍNIUM, HŐKEZELT ABLAKOK TELEPÍTÉSE A VETRO-CAMERA BASO-ALACSONY KIBOCSÁTÁSÚ (BE) RENDSZERREL, AMELY MEGFELEL A 16.02.2016. SZ. MINISZTERI RENDELET TELJESÍTMÉNYKÖVETELMÉNYEINEK (2.0. HŐSZÁMLA) A NYÉL ELT-VEL; 1,67 W7M.K. AZ AVTRR TELEPÍTÉSE? KÜLÖNÖS TEKINTETTEL A C.D. KORREKCIÓJÁRA? HŐHIDAKRA? EZÉRT AZT IS ELŐÍRJA, HOGY A MEGLÉVŐ KÜSZÖBÉRTÉKEKET ÚJ HŐCSÖKKENTÉSI KÜSZÖBÉRTÉKEKKEL KELL FELVÁLTANI. A SUD-EXD-SUD-OVEST ÜVEGEZÉST ÜVEG G, GL, N ELT SZELEKTÍV BEVONATTAL (NAPVEZÉRLÉSŰ ÜVEG) SZERELIK FEL; 0,35-HŐSZIGETELÉS VÍZSZINTES ÉS FÜGGŐLEGES SZERKEZETEK ESETÉBEN: HOSSZÚ (Hungarian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
CHUN NA CUSPÓIRÍ A BHAINT AMACH MAIDIR LE FEABHAS A CHUR AR ÉIFEACHTÚLACHT FUINNIMH AN FHOIRGNIMH ATÁ I GCEIST? TIONSCADAL SONRACH A BHUNÚ BUNAITHE AR ÁBHAR NA NDAINGNEÁN SEO A LEANAS: DÉANTAR FORÁIL MAIDIR LE HAON FRÁMAÍ FUINNEOIGE ATÁ ANN CHEANA NACH GCOMHLÍONANN NA CEANGLAIS FEIDHMÍOCHTA A LEAGTAR SÍOS IN ÍOSCHEANGLAIS 26/06/2015 A BHAINT; AG AN AM CÉANNA, AN LEANANN TÚ AR AGHAIDH? SUITEÁIL WINDOWS NUA ALÚMANAIM, GEARRTHA TEIRMEACHA, LE VETRO-CAMERA BASO-ÍSEAL-ASTAÍOCHTA (BE), A CHOMHLÍONANN CEANGLAIS FEIDHMÍOCHTA FHORAITHNE AIREACHTA UIMH. 16.02.2016 (CUNTAS TEIRMEACH 2.0) LE HEW ELT; 1,67 W7M.K. AN SUITEÁIL AVTRR? LE HAIRD AR LEITH AR CHEARTÚ C.D.? I GCÁS DROICHID THEIRMIGH? DÁ BHRÍ SIN, DÉANTAR FORÁIL ANN FREISIN MAIDIR LE TAIRSEACHA NUA GEARRTHA TEASA A CHUR IN IONAD NA DTAIRSEACH ATÁ ANN CHEANA. BEIDH GLOINIÚ SUD-EXD-FÓMHAIR FEISTITHE LE BRATÚ ROGHNAÍOCH (GLOINE FAOI RIALÚ GRÉINE) DE GHLOINE G, GL, N ELT; INSLIÚ 0,35-TEIRMEACH AR STRUCHTÚIR CHOTHROMÁNACHA AGUS INGEARACHA: FADA (Irish)
Property / summary: CHUN NA CUSPÓIRÍ A BHAINT AMACH MAIDIR LE FEABHAS A CHUR AR ÉIFEACHTÚLACHT FUINNIMH AN FHOIRGNIMH ATÁ I GCEIST? TIONSCADAL SONRACH A BHUNÚ BUNAITHE AR ÁBHAR NA NDAINGNEÁN SEO A LEANAS: DÉANTAR FORÁIL MAIDIR LE HAON FRÁMAÍ FUINNEOIGE ATÁ ANN CHEANA NACH GCOMHLÍONANN NA CEANGLAIS FEIDHMÍOCHTA A LEAGTAR SÍOS IN ÍOSCHEANGLAIS 26/06/2015 A BHAINT; AG AN AM CÉANNA, AN LEANANN TÚ AR AGHAIDH? SUITEÁIL WINDOWS NUA ALÚMANAIM, GEARRTHA TEIRMEACHA, LE VETRO-CAMERA BASO-ÍSEAL-ASTAÍOCHTA (BE), A CHOMHLÍONANN CEANGLAIS FEIDHMÍOCHTA FHORAITHNE AIREACHTA UIMH. 16.02.2016 (CUNTAS TEIRMEACH 2.0) LE HEW ELT; 1,67 W7M.K. AN SUITEÁIL AVTRR? LE HAIRD AR LEITH AR CHEARTÚ C.D.? I GCÁS DROICHID THEIRMIGH? DÁ BHRÍ SIN, DÉANTAR FORÁIL ANN FREISIN MAIDIR LE TAIRSEACHA NUA GEARRTHA TEASA A CHUR IN IONAD NA DTAIRSEACH ATÁ ANN CHEANA. BEIDH GLOINIÚ SUD-EXD-FÓMHAIR FEISTITHE LE BRATÚ ROGHNAÍOCH (GLOINE FAOI RIALÚ GRÉINE) DE GHLOINE G, GL, N ELT; INSLIÚ 0,35-TEIRMEACH AR STRUCHTÚIR CHOTHROMÁNACHA AGUS INGEARACHA: FADA (Irish) / rank
 
Normal rank
Property / summary: CHUN NA CUSPÓIRÍ A BHAINT AMACH MAIDIR LE FEABHAS A CHUR AR ÉIFEACHTÚLACHT FUINNIMH AN FHOIRGNIMH ATÁ I GCEIST? TIONSCADAL SONRACH A BHUNÚ BUNAITHE AR ÁBHAR NA NDAINGNEÁN SEO A LEANAS: DÉANTAR FORÁIL MAIDIR LE HAON FRÁMAÍ FUINNEOIGE ATÁ ANN CHEANA NACH GCOMHLÍONANN NA CEANGLAIS FEIDHMÍOCHTA A LEAGTAR SÍOS IN ÍOSCHEANGLAIS 26/06/2015 A BHAINT; AG AN AM CÉANNA, AN LEANANN TÚ AR AGHAIDH? SUITEÁIL WINDOWS NUA ALÚMANAIM, GEARRTHA TEIRMEACHA, LE VETRO-CAMERA BASO-ÍSEAL-ASTAÍOCHTA (BE), A CHOMHLÍONANN CEANGLAIS FEIDHMÍOCHTA FHORAITHNE AIREACHTA UIMH. 16.02.2016 (CUNTAS TEIRMEACH 2.0) LE HEW ELT; 1,67 W7M.K. AN SUITEÁIL AVTRR? LE HAIRD AR LEITH AR CHEARTÚ C.D.? I GCÁS DROICHID THEIRMIGH? DÁ BHRÍ SIN, DÉANTAR FORÁIL ANN FREISIN MAIDIR LE TAIRSEACHA NUA GEARRTHA TEASA A CHUR IN IONAD NA DTAIRSEACH ATÁ ANN CHEANA. BEIDH GLOINIÚ SUD-EXD-FÓMHAIR FEISTITHE LE BRATÚ ROGHNAÍOCH (GLOINE FAOI RIALÚ GRÉINE) DE GHLOINE G, GL, N ELT; INSLIÚ 0,35-TEIRMEACH AR STRUCHTÚIR CHOTHROMÁNACHA AGUS INGEARACHA: FADA (Irish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
FÖR ATT UPPNÅ MÅLEN ATT FÖRBÄTTRA ENERGIEFFEKTIVITETEN I BYGGNADEN I FRÅGA? INRÄTTA ETT SPECIFIKT PROJEKT BASERAT PÅ FÖLJANDE INNEHÅLL I FIXTURERNA: DET FINNS BESTÄMMELSER OM AVLÄGSNANDE AV BEFINTLIGA FÖNSTERKARMAR SOM INTE UPPFYLLER DE PRESTANDAKRAV SOM FASTSTÄLLS I MINIMIKRAVEN 26.6.2015. PARALLELLT, FORTSÄTTER DU? INSTALLATION AV NYA VÄRMESKURNA FÖNSTER AV ALUMINIUM, MED VETRO-CAMERA BASO-LÅGUTSLÄPP (BE), SOM UPPFYLLER PRESTANDAKRAVEN I MINISTERDEKRET NR 16.02.2016 (TERMOKONTO 2.0) MED HEW ELT. 1,67 W7M.K. AVTRR-INSTALLATIONEN? MED SÄRSKILD UPPMÄRKSAMHET PÅ KORRIGERINGEN AV C.D.? FÖR TERMISKA BRYGGOR? DÄRFÖR FÖRESKRIVS DET OCKSÅ ATT BEFINTLIGA TRÖSKELVÄRDEN SKA ERSÄTTAS MED NYA VÄRMESÄNKTA TRÖSKELVÄRDEN. SUD-EXD-SUD-OVEST-GLAS KOMMER ATT VARA UTRUSTADE MED EN SELEKTIV BELÄGGNING (SOLKONTROLLERAT GLAS) AV GLAS G, GL, N ELT. 0,35-TERMISK ISOLERING AV HORISONTELLA OCH VERTIKALA STRUKTURER: LÅNG (Swedish)
Property / summary: FÖR ATT UPPNÅ MÅLEN ATT FÖRBÄTTRA ENERGIEFFEKTIVITETEN I BYGGNADEN I FRÅGA? INRÄTTA ETT SPECIFIKT PROJEKT BASERAT PÅ FÖLJANDE INNEHÅLL I FIXTURERNA: DET FINNS BESTÄMMELSER OM AVLÄGSNANDE AV BEFINTLIGA FÖNSTERKARMAR SOM INTE UPPFYLLER DE PRESTANDAKRAV SOM FASTSTÄLLS I MINIMIKRAVEN 26.6.2015. PARALLELLT, FORTSÄTTER DU? INSTALLATION AV NYA VÄRMESKURNA FÖNSTER AV ALUMINIUM, MED VETRO-CAMERA BASO-LÅGUTSLÄPP (BE), SOM UPPFYLLER PRESTANDAKRAVEN I MINISTERDEKRET NR 16.02.2016 (TERMOKONTO 2.0) MED HEW ELT. 1,67 W7M.K. AVTRR-INSTALLATIONEN? MED SÄRSKILD UPPMÄRKSAMHET PÅ KORRIGERINGEN AV C.D.? FÖR TERMISKA BRYGGOR? DÄRFÖR FÖRESKRIVS DET OCKSÅ ATT BEFINTLIGA TRÖSKELVÄRDEN SKA ERSÄTTAS MED NYA VÄRMESÄNKTA TRÖSKELVÄRDEN. SUD-EXD-SUD-OVEST-GLAS KOMMER ATT VARA UTRUSTADE MED EN SELEKTIV BELÄGGNING (SOLKONTROLLERAT GLAS) AV GLAS G, GL, N ELT. 0,35-TERMISK ISOLERING AV HORISONTELLA OCH VERTIKALA STRUKTURER: LÅNG (Swedish) / rank
 
Normal rank
Property / summary: FÖR ATT UPPNÅ MÅLEN ATT FÖRBÄTTRA ENERGIEFFEKTIVITETEN I BYGGNADEN I FRÅGA? INRÄTTA ETT SPECIFIKT PROJEKT BASERAT PÅ FÖLJANDE INNEHÅLL I FIXTURERNA: DET FINNS BESTÄMMELSER OM AVLÄGSNANDE AV BEFINTLIGA FÖNSTERKARMAR SOM INTE UPPFYLLER DE PRESTANDAKRAV SOM FASTSTÄLLS I MINIMIKRAVEN 26.6.2015. PARALLELLT, FORTSÄTTER DU? INSTALLATION AV NYA VÄRMESKURNA FÖNSTER AV ALUMINIUM, MED VETRO-CAMERA BASO-LÅGUTSLÄPP (BE), SOM UPPFYLLER PRESTANDAKRAVEN I MINISTERDEKRET NR 16.02.2016 (TERMOKONTO 2.0) MED HEW ELT. 1,67 W7M.K. AVTRR-INSTALLATIONEN? MED SÄRSKILD UPPMÄRKSAMHET PÅ KORRIGERINGEN AV C.D.? FÖR TERMISKA BRYGGOR? DÄRFÖR FÖRESKRIVS DET OCKSÅ ATT BEFINTLIGA TRÖSKELVÄRDEN SKA ERSÄTTAS MED NYA VÄRMESÄNKTA TRÖSKELVÄRDEN. SUD-EXD-SUD-OVEST-GLAS KOMMER ATT VARA UTRUSTADE MED EN SELEKTIV BELÄGGNING (SOLKONTROLLERAT GLAS) AV GLAS G, GL, N ELT. 0,35-TERMISK ISOLERING AV HORISONTELLA OCH VERTIKALA STRUKTURER: LÅNG (Swedish) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / summary
 
ET SAAVUTADA KÕNEALUSE HOONE ENERGIATÕHUSUSE PARANDAMISE EESMÄRGID? KÄIVITAGE ERIPROJEKT, MIS PÕHINEB JÄRGMISEL SISUL: NÄHAKSE ETTE SELLISTE OLEMASOLEVATE AKNARAAMIDE EEMALDAMINE, MIS EI VASTA 26. JUUNI 2015. AASTA MIINIMUMNÕUETES SÄTESTATUD TOIMIVUSNÕUETELE; KAS JÄTKATE PARALLEELSELT? UUE ALUMIINIUMIST, SOOJUSLÕIGATUD AKENDE PAIGALDAMINE KOOS VETRO-CAMERA BASO-MADALA HEITEGA (BE), MIS VASTAB MINISTRI DEKREEDI NR 16.02.2016 (TERMAALKONTO 2.0) TOIMIVUSNÕUETELE KOOS KÕRGHOONEGA ELT; 1,67 W7MK. AVTRR-I PAIGALDUS? PÖÖRATES ERILIST TÄHELEPANU C.D. KORRIGEERIMISELE? TERMILISTE SILDADE JAOKS? SEEPÄRAST NÄHAKSE SELLEGA ETTE KA OLEMASOLEVATE KÜNNISTE ASENDAMINE UUTE SOOJUSKATKESTUSLÄVEDEGA. SUD-EXD-SUD-OVEST KLAASPINNAD VARUSTATAKSE SELEKTIIVSE KATTEGA (PÄIKESEGA KONTROLLITUD KLAAS) KLAASIST G, GL, NELT; 0,35-TERMILINE HORISONTAAL- JA VERTIKAALKONSTRUKTSIOONIDE ISOLATSIOON: PIKK (Estonian)
Property / summary: ET SAAVUTADA KÕNEALUSE HOONE ENERGIATÕHUSUSE PARANDAMISE EESMÄRGID? KÄIVITAGE ERIPROJEKT, MIS PÕHINEB JÄRGMISEL SISUL: NÄHAKSE ETTE SELLISTE OLEMASOLEVATE AKNARAAMIDE EEMALDAMINE, MIS EI VASTA 26. JUUNI 2015. AASTA MIINIMUMNÕUETES SÄTESTATUD TOIMIVUSNÕUETELE; KAS JÄTKATE PARALLEELSELT? UUE ALUMIINIUMIST, SOOJUSLÕIGATUD AKENDE PAIGALDAMINE KOOS VETRO-CAMERA BASO-MADALA HEITEGA (BE), MIS VASTAB MINISTRI DEKREEDI NR 16.02.2016 (TERMAALKONTO 2.0) TOIMIVUSNÕUETELE KOOS KÕRGHOONEGA ELT; 1,67 W7MK. AVTRR-I PAIGALDUS? PÖÖRATES ERILIST TÄHELEPANU C.D. KORRIGEERIMISELE? TERMILISTE SILDADE JAOKS? SEEPÄRAST NÄHAKSE SELLEGA ETTE KA OLEMASOLEVATE KÜNNISTE ASENDAMINE UUTE SOOJUSKATKESTUSLÄVEDEGA. SUD-EXD-SUD-OVEST KLAASPINNAD VARUSTATAKSE SELEKTIIVSE KATTEGA (PÄIKESEGA KONTROLLITUD KLAAS) KLAASIST G, GL, NELT; 0,35-TERMILINE HORISONTAAL- JA VERTIKAALKONSTRUKTSIOONIDE ISOLATSIOON: PIKK (Estonian) / rank
 
Normal rank
Property / summary: ET SAAVUTADA KÕNEALUSE HOONE ENERGIATÕHUSUSE PARANDAMISE EESMÄRGID? KÄIVITAGE ERIPROJEKT, MIS PÕHINEB JÄRGMISEL SISUL: NÄHAKSE ETTE SELLISTE OLEMASOLEVATE AKNARAAMIDE EEMALDAMINE, MIS EI VASTA 26. JUUNI 2015. AASTA MIINIMUMNÕUETES SÄTESTATUD TOIMIVUSNÕUETELE; KAS JÄTKATE PARALLEELSELT? UUE ALUMIINIUMIST, SOOJUSLÕIGATUD AKENDE PAIGALDAMINE KOOS VETRO-CAMERA BASO-MADALA HEITEGA (BE), MIS VASTAB MINISTRI DEKREEDI NR 16.02.2016 (TERMAALKONTO 2.0) TOIMIVUSNÕUETELE KOOS KÕRGHOONEGA ELT; 1,67 W7MK. AVTRR-I PAIGALDUS? PÖÖRATES ERILIST TÄHELEPANU C.D. KORRIGEERIMISELE? TERMILISTE SILDADE JAOKS? SEEPÄRAST NÄHAKSE SELLEGA ETTE KA OLEMASOLEVATE KÜNNISTE ASENDAMINE UUTE SOOJUSKATKESTUSLÄVEDEGA. SUD-EXD-SUD-OVEST KLAASPINNAD VARUSTATAKSE SELEKTIIVSE KATTEGA (PÄIKESEGA KONTROLLITUD KLAAS) KLAASIST G, GL, NELT; 0,35-TERMILINE HORISONTAAL- JA VERTIKAALKONSTRUKTSIOONIDE ISOLATSIOON: PIKK (Estonian) / qualifier
 
point in time: 5 July 2022
Timestamp+2022-07-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
Property / contained in NUTS
 
Property / contained in NUTS: Province of Florence / rank
 
Normal rank
Property / intervention field
 
Property / intervention field: Generic productive investment in small and medium–sized enterprises (‘SMEs’) / rank
 
Normal rank
Property / location (string)
 
PRATO
Property / location (string): PRATO / rank
 
Normal rank
Property / budget
 
467,854.45 Euro
Amount467,854.45 Euro
UnitEuro
Property / budget: 467,854.45 Euro / rank
 
Normal rank
Property / EU contribution
 
198,387.92 Euro
Amount198,387.92 Euro
UnitEuro
Property / EU contribution: 198,387.92 Euro / rank
 
Normal rank
Property / co-financing rate
 
42.4 percent
Amount42.4 percent
Unitpercent
Property / co-financing rate: 42.4 percent / rank
 
Normal rank

Latest revision as of 18:33, 8 April 2023

Project Q2056957 in Italy
Language Label Description Also known as
English
(10360.14072017.115000034) 03.18_3126_FERMI
Project Q2056957 in Italy

    Statements

    0 references
    198,387.92 Euro
    0 references
    467,854.45 Euro
    0 references
    42.4 percent
    0 references
    23 March 2018
    0 references
    23 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI PRATO
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    ALLO SCOPO DI PERSEGUIRE GLI OBIETTIVI DI EFFICIENTAMENTO ENERGETICO DELL?EDIFICIO IN ESAME, SI ? PREDISPOSTO UNO SPECIFICO PROGETTO CHE SI ARTICOLA SECONDO I SEGUENTI CONTENUTI.- INFISSI: ? PREVISTA LA RIMOZIONE DI TUTTI QUEGLI INFISSI ESISTENTI CHE NON RISPONDONO AI REQUISITI PRESTAZIONALI DI CUI AL DECRETO REQUISITI MINIMI 26/06/2015; PARALLELAMENTE, SI PROCEDER? ALLA POSA IN OPERA DI NUOVI SERRAMENTI IN ALLUMINIO, A TAGLIO TERMICO, CON VETRO-CAMERA BASSO-EMISSIVO (BE), RISPONDENTI AI REQUISITI PRESTAZIONALI DEL D.M. 16.02.2016 (CONTO TERMICO 2.0) CON UW ELT; 1,67 W7MQ.K. L'INSTALLAZIONE AVVERR? CON PARTICOLARE ATTENZIONE ALLA CORREZIONE DEI C.D. ?PONTI TERMICI? PREVEDENDO QUINDI ANCHE LA SOSTITUZIONE DELLE ATTUALI SOGLIE CON NUOVE SOGLIE A TAGLIO TERMICO. LE VETRATE CON ORIENTAMENTO SUD-EST-SUD-SUD-OVEST SARANNO DOTATE DI RIVESTIMENTO SELETTIVO (VETRO A CONTROLLO SOLARE) CON FATTORE SOLARE DEL VETRO G, GL,N ELT; 0,35.- ISOLAMENTO TERMICO STRUTTURE ORIZZONTALI E VERTICALI: LUNGO GLI (Italian)
    0 references
    IN ORDER TO PURSUE THE OBJECTIVES OF IMPROVING THE ENERGY EFFICIENCY OF THE BUILDING IN QUESTION? SET UP A SPECIFIC PROJECT BASED ON THE FOLLOWING CONTENT OF THE FIXTURES: ? PROVISION IS MADE FOR THE REMOVAL OF ANY EXISTING WINDOW FRAMES WHICH DO NOT MEET THE PERFORMANCE REQUIREMENTS LAID DOWN IN MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, DO YOU PROCEED? THE INSTALLATION OF NEW ALUMINIUM, THERMAL CUT WINDOWS, WITH VETRO-CAMERA BASO-LOW-EMISSION (BE), MEETING THE PERFORMANCE REQUIREMENTS OF MINISTERIAL DECREE NO 16.02.2016 (THERMAL ACCOUNT 2.0) WITH HEW ELT; 1,67 W7M.K. THE AVTRR INSTALLATION? WITH PARTICULAR ATTENTION TO THE CORRECTION OF C.D.? FOR THERMAL BRIDGES? IT THEREFORE ALSO PROVIDES FOR THE REPLACEMENT OF EXISTING THRESHOLDS WITH NEW HEAT CUT THRESHOLDS. SUD-EXD-SUD-OVEST GLAZING WILL BE EQUIPPED WITH A SELECTIVE COATING (SOLAR CONTROLLED GLASS) OF GLASS G, GL, N ELT; 0,35-THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES: LONG (English)
    0 references
    AFIN D’ATTEINDRE LES OBJECTIFS D’EFFICACITÉ ÉNERGÉTIQUE DU BÂTIMENT CONSIDÉRÉ, OUI? A PRÉPARÉ UN PROJET SPÉCIFIQUE STRUCTURÉ SELON LES CONTENUTIES SUIVANTES: PRÉVOIT LA SUPPRESSION DE TOUS LES APPAREILS EXISTANTS QUI NE RÉPONDENT PAS AUX EXIGENCES DE PERFORMANCE ÉNONCÉES DANS LE DÉCRET 26/06/2015 RELATIF AUX PRESCRIPTIONS MINIMALES; EN PARALLÈLE, ALLONS-NOUS PROCÉDER? L’INSTALLATION DE NOUVEAUX CADRES EN ALUMINIUM, COUPE THERMIQUE, À FAIBLE ÉMISSION DE VERRE-CHAMBRE (BE), RÉPONDANT AUX EXIGENCES DE PERFORMANCE DU DÉCRET MINISTÉRIEL 16.02.2016 (COMPTE THERMIQUE 2.0) AVEC UW ELT; 1.67 W7MQ.K. L’INSTALLATION VA SE RÉALISER? AVEC UNE ATTENTION PARTICULIÈRE À LA CORRECTION DES PONTS THERMIQUES C.D.? IL PRÉVOIT DONC ÉGALEMENT LE REMPLACEMENT DES SEUILS ACTUELS PAR DE NOUVEAUX SEUILS DE COUPE THERMIQUE. LES FENÊTRES EN VERRE ORIENTÉES SUD-EST-SUD-SUD-SUD-SUD-OUEST SERONT ÉQUIPÉES D’UN REVÊTEMENT SÉLECTIF (VERRE CONTRÔLÉ SOLAIRE) AVEC FACTEUR SOLAIRE G, GL, N ELT; 0.35.- STRUCTURES HORIZONTALES ET VERTICALES D’ISOLATION THERMIQUE: LE LONG DE LA (French)
    16 December 2021
    0 references
    OM DE ENERGIE-EFFICIËNTIEDOELSTELLINGEN VAN HET BETROKKEN GEBOUW TE BEREIKEN, JA? EEN SPECIFIEK PROJECT VOORBEREID DAT GESTRUCTUREERD IS VOLGENS DE VOLGENDE CONTENUTIES.- ARMATUREN: VOORZIEN IN DE VERWIJDERING VAN ALLE BESTAANDE ARMATUREN DIE NIET VOLDOEN AAN DE PRESTATIEVEREISTEN VAN HET MINIMUMEISENDE BESLUIT 26/06/2015; PARALLEL, ZULLEN WE VERDER GAAN? DE INSTALLATIE VAN NIEUWE ALUMINIUM FRAMES, THERMISCH GESLEPEN, MET EMISSIEARME GLASKAMER (BE), DIE VOLDOEN AAN DE PRESTATIEVEREISTEN VAN MINISTERIEEL BESLUIT 16.02.2016 (THERMISCHE REKENING 2.0) MET UW ELT; 1.67 W7MQ.K. DE INSTALLATIE ZAL UITKOMEN? MET BIJZONDERE AANDACHT VOOR DE CORRECTIE VAN C.D.? THERMISCHE BRUGGEN? ZIJ VOORZIET DAAROM OOK IN DE VERVANGING VAN DE HUIDIGE DREMPELS DOOR NIEUWE THERMISCHE REDUCTIEDREMPELS. GLAS RAMEN MET ZUID-OOST-ZUID-ZUID-WEST ORIËNTATIE ZAL WORDEN UITGERUST MET SELECTIEVE COATING (ZONNEGESTUURD GLAS) MET ZONNEFACTOR G, GL, N ELT; 0.35.- THERMISCHE ISOLATIE HORIZONTALE EN VERTICALE CONSTRUCTIES: LANGS DE (Dutch)
    23 December 2021
    0 references
    UM DIE ENERGIEEFFIZIENZZIELE DES BETREFFENDEN GEBÄUDES ZU ERREICHEN, JA? ERSTELLTE EIN SPEZIFISCHES PROJEKT, DAS NACH FOLGENDEN CONTENUTIES.- VORRICHTUNGEN STRUKTURIERT IST: VORGESEHEN IST, DASS ALLE VORHANDENEN EINRICHTUNGEN ENTFERNT WERDEN, DIE DIE LEISTUNGSANFORDERUNGEN DES DEKRETS 26/06/2015 NICHT ERFÜLLEN; WERDEN WIR PARALLEL WEITERMACHEN? DIE INSTALLATION NEUER ALUMINIUMRAHMEN, THERMISCHER SCHNITT, MIT EMISSIONSARMEM GLAS-KAMMER (BE), DIE DEN LEISTUNGSANFORDERUNGEN DES MINISTERIALDEKRETS 16.02.2016 (THERMAL ACCOUNT 2.0) MIT UW ELT ENTSPRECHEN; 1.67 W7MQ.K. DIE INSTALLATION WIRD WAHR WERDEN? MIT BESONDEREM AUGENMERK AUF DIE KORREKTUR VON C.D.? WÄRMEBRÜCKEN? SIE SIEHT DAHER AUCH DIE ERSETZUNG DER DERZEITIGEN SCHWELLENWERTE DURCH NEUE THERMISCHE KÜRZUNGSSCHWELLEN VOR. GLASFENSTER MIT SÜD-SÜD-SÜD-WEST-AUSRICHTUNG WERDEN MIT SELEKTIVER BESCHICHTUNG (SOLARGESTEUERTES GLAS) MIT SOLARFAKTOR G, GL,N ELT AUSGESTATTET; 0,35.- WÄRMEDÄMMUNG HORIZONTALE UND VERTIKALE STRUKTUREN: ENTLANG DER (German)
    24 December 2021
    0 references
    PARA ALCANZAR LOS OBJETIVOS DE EFICIENCIA ENERGÉTICA DEL EDIFICIO EN CUESTIÓN, ¿SÍ? PREPARÓ UN PROYECTO ESPECÍFICO QUE SE ESTRUCTURA DE ACUERDO CON LAS SIGUIENTES CONTENUTIES.- ACCESORIOS: SE PREVÉ LA ELIMINACIÓN DE TODOS LOS ACCESORIOS EXISTENTES QUE NO CUMPLAN LOS REQUISITOS DE RENDIMIENTO ESTABLECIDOS EN LOS REQUISITOS MÍNIMOS DEL DECRETO 26/06/2015; PARALELAMENTE, ¿VAMOS A PROCEDER? LA INSTALACIÓN DE NUEVOS BASTIDORES DE ALUMINIO, DE CORTE TÉRMICO, CON CÁMARA DE VIDRIO DE BAJA EMISIÓN (BE), CUMPLIENDO LOS REQUISITOS DE RENDIMIENTO DEL DECRETO MINISTERIAL 16.02.2016 (CUENTA TÉRMICA 2.0) CON UW ELT; 1.67 W7MQ.K. LA INSTALACIÓN SE HARÁ REALIDAD? CON ESPECIAL ATENCIÓN A LA CORRECCIÓN DE LOS PUENTES TÉRMICOS DE C.D.? POR LO TANTO, TAMBIÉN PREVÉ LA SUSTITUCIÓN DE LOS UMBRALES ACTUALES POR NUEVOS UMBRALES DE CORTE TÉRMICO. LAS VENTANAS DE VIDRIO CON ORIENTACIÓN SURESTE-SUR-SUR-SUR-OESTE ESTARÁN EQUIPADAS CON REVESTIMIENTO SELECTIVO (VIDRIO CONTROLADO SOLAR) CON FACTOR SOLAR G, GL, N ELT; 0.35.- ESTRUCTURAS HORIZONTALES Y VERTICALES DE AISLAMIENTO TÉRMICO: A LO LARGO DE LA (Spanish)
    25 January 2022
    0 references
    MED HENBLIK PÅ AT FORFØLGE MÅLENE OM AT FORBEDRE ENERGIEFFEKTIVITETEN I DEN PÅGÆLDENDE BYGNING? OPRETTE ET SPECIFIKT PROJEKT BASERET PÅ FØLGENDE INDHOLD AF INVENTARET: DER ER FASTSAT BESTEMMELSER OM FJERNELSE AF EKSISTERENDE VINDUESRAMMER, SOM IKKE OPFYLDER YDEEVNEKRAVENE I MINDSTEKRAVENE 26.6.2015 PARALLELT, FORTSÆTTER DU? INSTALLATION AF NYE VARMEAFSKÅRNE VINDUER AF ALUMINIUM MED VETRO-KAMERA BASO-LAVEMISSION (BE), DER OPFYLDER PRÆSTATIONSKRAVENE I MINISTERIELT DEKRET NR. 16.02.2016 (TERMISK REGNSKAB 2.0) MED HEW ELT 1,67 W7M.K. AVTRR INSTALLATION? MED SÆRLIG OPMÆRKSOMHED PÅ KORREKTIONEN AF C.D.? TIL TERMISKE BROER? DET INDEHOLDER DERFOR OGSÅ BESTEMMELSER OM UDSKIFTNING AF EKSISTERENDE TÆRSKLER MED NYE VARMEAFBRYDELSESTÆRSKLER. SUD-EXD-SUD-OVEST-RUDER VIL VÆRE UDSTYRET MED EN SELEKTIV BELÆGNING (SOLSTYRET GLAS) AF GLAS G, GL, N ELT; 0,35-TERMISK ISOLERING AF VANDRETTE OG LODRETTE KONSTRUKTIONER: LANG (Danish)
    5 July 2022
    0 references
    ΠΡΟΚΕΙΜΈΝΟΥ ΝΑ ΕΠΙΤΕΥΧΘΟΎΝ ΟΙ ΣΤΌΧΟΙ ΤΗΣ ΒΕΛΤΊΩΣΗΣ ΤΗΣ ΕΝΕΡΓΕΙΑΚΉΣ ΑΠΌΔΟΣΗΣ ΤΟΥ ΕΝ ΛΌΓΩ ΚΤΙΡΊΟΥ; ΔΗΜΙΟΥΡΓΊΑ ΕΙΔΙΚΟΎ ΣΧΕΔΊΟΥ ΜΕ ΒΆΣΗ ΤΟ ΑΚΌΛΟΥΘΟ ΠΕΡΙΕΧΌΜΕΝΟ ΤΩΝ ΦΩΤΙΣΤΙΚΏΝ: ΠΡΟΒΛΈΠΕΤΑΙ Η ΑΦΑΊΡΕΣΗ ΤΥΧΌΝ ΥΦΙΣΤΆΜΕΝΩΝ ΠΛΑΙΣΊΩΝ ΠΑΡΑΘΎΡΩΝ ΠΟΥ ΔΕΝ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΕΠΙΔΌΣΕΩΝ ΠΟΥ ΟΡΊΖΟΝΤΑΙ ΣΤΙΣ ΕΛΆΧΙΣΤΕΣ ΑΠΑΙΤΉΣΕΙΣ 26/06/2015· ΠΑΡΆΛΛΗΛΑ, ΠΡΟΧΩΡΆΤΕ; ΤΗΝ ΕΓΚΑΤΆΣΤΑΣΗ ΝΈΟΥ ΑΛΟΥΜΙΝΊΟΥ, ΘΕΡΜΟΚΟΠΤΏΝ ΠΑΡΑΘΎΡΩΝ, ΜΕ VETRO-CAMERA BASO-LOW-EMISSION (BE), ΠΟΥ ΠΛΗΡΟΎΝ ΤΙΣ ΑΠΑΙΤΉΣΕΙΣ ΑΠΌΔΟΣΗΣ ΤΗΣ ΥΠΟΥΡΓΙΚΉΣ ΑΠΌΦΑΣΗΣ ΑΡΙΘ. 16.02.2016 (ΘΕΡΜΙΚΌΣ ΛΟΓΑΡΙΑΣΜΌΣ 2.0) ΜΕ ELT. 1,67 W7M.K. Η ΕΓΚΑΤΆΣΤΑΣΗ AVTRR; ΜΕ ΙΔΙΑΊΤΕΡΗ ΠΡΟΣΟΧΉ ΣΤΗ ΔΙΌΡΘΩΣΗ ΤΟΥ C.D.; ΓΙΑ ΘΕΡΜΙΚΈΣ ΓΈΦΥΡΕΣ; ΩΣ ΕΚ ΤΟΎΤΟΥ, ΠΡΟΒΛΈΠΕΙ ΕΠΊΣΗΣ ΤΗΝ ΑΝΤΙΚΑΤΆΣΤΑΣΗ ΤΩΝ ΥΦΙΣΤΆΜΕΝΩΝ ΚΑΤΏΤΑΤΩΝ ΟΡΊΩΝ ΑΠΌ ΝΈΑ ΚΑΤΏΤΑΤΑ ΌΡΙΑ ΜΕΊΩΣΗΣ ΤΗΣ ΘΕΡΜΌΤΗΤΑΣ. ΟΙ ΥΑΛΟΠΊΝΑΚΕΣ SUD-EXD-SUD-OVEST ΘΑ ΕΊΝΑΙ ΕΞΟΠΛΙΣΜΈΝΟΙ ΜΕ ΕΠΙΛΕΚΤΙΚΉ ΕΠΙΚΆΛΥΨΗ (ΗΛΙΑΚΌΣ ΥΑΛΟΠΊΝΑΚΑΣ) ΑΠΌ ΓΥΑΛΊ G, GL, N ELT· 0,35-ΘΕΡΜΙΚΉ ΜΌΝΩΣΗ ΟΡΙΖΌΝΤΙΩΝ ΚΑΙ ΚΑΤΑΚΌΡΥΦΩΝ ΔΟΜΏΝ: ΜΑΚΡΎΣ (Greek)
    5 July 2022
    0 references
    KAKO BI SE OSTVARILI CILJEVI POBOLJŠANJA ENERGETSKE UČINKOVITOSTI PREDMETNE ZGRADE? USPOSTAVITI ODREĐENI PROJEKT KOJI SE TEMELJI NA SLJEDEĆEM SADRŽAJU ČVORA: PREDVIĐENO JE UKLANJANJE SVIH POSTOJEĆIH OKVIRA PROZORA KOJI NE ISPUNJAVAJU ZAHTJEVE U POGLEDU UČINKOVITOSTI UTVRĐENE U MINIMALNIM ZAHTJEVIMA OD 26. LIPNJA 2015.; PARALELNO, NASTAVLJAŠ LI? UGRADNJA NOVIH ALUMINIJSKIH, TOPLINSKI REZNIH PROZORA, S VETRO-KAMEROM BASO-NISKA EMISIJA (BE), KOJA ISPUNJAVA ZAHTJEVE U POGLEDU UČINKOVITOSTI MINISTARSKE UREDBE BR. 16.02.2016 (TOPLINSKI RAČUN 2.0) S HEW ELT-OM; 1,67 W7M.K. AVTRR INSTALACIJA? S POSEBNIM NAGLASKOM NA KOREKCIJU C.D.? ZA TOPLINSKE MOSTOVE? STOGA SE PREDVIĐA I ZAMJENA POSTOJEĆIH PRAGOVA NOVIM PRAGOVIMA ZA SMANJENJE TOPLINE. SUD-EXD-SUD-OVEST STAKLA BIT ĆE OPREMLJENA SELEKTIVNIM PREMAZOM (SOLARNIM KONTROLIRANIM STAKLOM) OD STAKLA G, GL, N ELT; 0,35-TOPLINSKA IZOLACIJA VODORAVNIH I VERTIKALNIH KONSTRUKCIJA: DUGO (Croatian)
    5 July 2022
    0 references
    PENTRU A URMĂRI OBIECTIVELE DE ÎMBUNĂTĂȚIRE A EFICIENȚEI ENERGETICE A CLĂDIRII ÎN CAUZĂ? REALIZAREA UNUI PROIECT SPECIFIC PE BAZA URMĂTORULUI CONȚINUT AL CORPURILOR: SE PREVEDE ÎNDEPĂRTAREA CADRELOR DE FERESTRE EXISTENTE CARE NU ÎNDEPLINESC CERINȚELE DE PERFORMANȚĂ PREVĂZUTE ÎN CERINȚELE MINIME DIN 26.6.2015; ÎN PARALEL, CONTINUAȚI? INSTALAREA DE FERESTRE NOI DIN ALUMINIU, TĂIATE TERMIC, CU CAMERĂ VETRO-CAMERA BASO CU EMISII SCĂZUTE (BE), ÎNDEPLININD CERINȚELE DE PERFORMANȚĂ DIN DECRETUL MINISTERIAL NR. 16.02.2016 (CONT TERMIC 2.0) CU ELT; 1,67 W7MK INSTALAȚIA AVTRR? CU O ATENȚIE DEOSEBITĂ LA CORECTAREA C.D.? PENTRU PODURI TERMICE? PRIN URMARE, ACESTA PREVEDE, DE ASEMENEA, ÎNLOCUIREA PRAGURILOR EXISTENTE CU NOI PRAGURI DE REDUCERE A CĂLDURII. GEAMURILE SUD-EXD-SUD-OVEST VOR FI ECHIPATE CU UN STRAT SELECTIV (STICLĂ CONTROLATĂ SOLAR) DIN STICLĂ G, GL, N ELT; 0,35-IZOLAREA TERMICĂ A STRUCTURILOR ORIZONTALE ȘI VERTICALE: LUNGĂ (Romanian)
    5 July 2022
    0 references
    NA DOSIAHNUTIE CIEĽOV ZLEPŠENIA ENERGETICKEJ ÚČINNOSTI PREDMETNEJ BUDOVY? VYTVORIŤ KONKRÉTNY PROJEKT ZALOŽENÝ NA TOMTO OBSAHU PRÍPRAVKOV: PRIJALI SA OPATRENIA NA ODSTRÁNENIE AKÝCHKOĽVEK EXISTUJÚCICH OKENNÝCH RÁMOV, KTORÉ NESPĹŇAJÚ VÝKONNOSTNÉ POŽIADAVKY STANOVENÉ V MINIMÁLNYCH POŽIADAVKÁCH 26/06/2015; PARALELNE, POKRAČUJEŠ? INŠTALÁCIA NOVÝCH HLINÍKOVÝCH, TEPELNÝCH REZNÝCH OKIEN S VETRO-CAMERA BASO-NÍZKOEMISNÝMI (BE), SPĹŇAJÚCICH VÝKONNOSTNÉ POŽIADAVKY MINISTERSKEJ VYHLÁŠKY Č. 16.02.2016 (TEPELNÝ ÚČET 2.0) S HROTOM ELT; 1,67 W7M.K. INŠTALÁCIA AVTRR? S OSOBITNÝM DÔRAZOM NA KOREKCIU C.D.? PRE TEPELNÉ MOSTY? PRETO SA V ŇOM STANOVUJE AJ NAHRADENIE EXISTUJÚCICH PRAHOVÝCH HODNÔT NOVÝMI PRAHOVÝMI HODNOTAMI PRE ZNÍŽENIE TEPLA. ZASKLENIE SUD-EXD-SUD-OVEST BUDE VYBAVENÉ SELEKTÍVNYM POVLAKOM (SOLÁRNYM RIADENÝM SKLOM) ZO SKLA G, GL, N ELT; 0,35-TEPELNÁ IZOLÁCIA HORIZONTÁLNYCH A VERTIKÁLNYCH KONŠTRUKCIÍ: DLHÁ (Slovak)
    5 July 2022
    0 references
    SABIEX JINTLAĦQU L-GĦANIJIET TAT-TITJIB TAL-EFFIĊJENZA ENERĠETIKA TAL-BINI INKWISTJONI? TISTABBILIXXI PROĠETT SPEĊIFIKU BBAŻAT FUQ IL-KONTENUT LI ĠEJ TAL-ATTREZZATURI: ISSIR DISPOŻIZZJONI GĦAT-TNEĦĦIJA TA’ KWALUNKWE QAFAS TAT-TWIEQI EŻISTENTI LI MA JISSODISFAX IR-REKWIŻITI TAL-PRESTAZZJONI STIPULATI FIR-REKWIŻITI MINIMI 26/06/2015; B’MOD PARALLEL, TIPPROĊEDI INT? L-INSTALLAZZJONI TA’ ALUMINJU ĠDID, TWIEQI MAQTUGĦA TERMALI, B’VETRO-CAMERA BASO B’EMISSJONIJIET BAXXI (BE), LI JISSODISFAW IR-REKWIŻITI TAL-PRESTAZZJONI TAD-DIGRIET MINISTERJALI NRU 16.02.2016 (KONT TERMALI 2.0) MA’ HEW ELT; 1,67 W7M.K. L-INSTALLAZZJONI AVTRR? B’ATTENZJONI PARTIKOLARI GĦALL-KORREZZJONI TAS-C.D.? GĦAL PONTIJIET TERMALI? GĦALHEKK JIPPROVDI WKOLL GĦAS-SOSTITUZZJONI TAL-LIMITI EŻISTENTI B’LIMITI ĠODDA GĦALL-QTUGĦ TAS-SĦANA. IL-ĦĠIEĠ SUD-EXD-SUD-OVEST SE JKUN MGĦAMMAR B’KISJA SELETTIVA (ĦĠIEĠ IKKONTROLLAT MIX-XEMX) TA’ ĦĠIEĠ G, GL, N ELT; 0,35-INSULAZZJONI TERMALI TA’ STRUTTURI ORIZZONTALI U VERTIKALI: TUL TA’ ŻMIEN (Maltese)
    5 July 2022
    0 references
    A FIM DE PROSSEGUIR OS OBJETIVOS DE MELHORIA DA EFICIÊNCIA ENERGÉTICA DO EDIFÍCIO EM QUESTÃO? CRIAR UM PROJETO ESPECÍFICO COM BASE NO SEGUINTE CONTEÚDO DOS DISPOSITIVOS: ESTÁ PREVISTA A REMOÇÃO DE QUAISQUER CAIXILHOS DE JANELAS EXISTENTES QUE NÃO CUMPRAM OS REQUISITOS DE DESEMPENHO ESTABELECIDOS NOS REQUISITOS MÍNIMOS 26/06/2015; EM PARALELO, CONTINUAS? A INSTALAÇÃO DE NOVAS JANELAS DE ALUMÍNIO, CORTE TÉRMICO, COM CÂMARA VETRO BASO-BAIXA EMISSÃO (BE), CUMPRINDO OS REQUISITOS DE DESEMPENHO DO DECRETO MINISTERIAL N.º 16.02.2016 (CONTA TÉRMICA 2.0) COM HEW ELT; 1,67 W7M.K. A INSTALAÇÃO AVTRR? COM ESPECIAL ATENÇÃO À CORREÇÃO DA D.C.? PARA PONTES TÉRMICAS? POR CONSEGUINTE, PREVÊ IGUALMENTE A SUBSTITUIÇÃO DOS LIMIARES EXISTENTES POR NOVOS LIMIARES DE REDUÇÃO DO CALOR. AS VIDRAÇAS SUD-EXD-SUD-OVEST SERÃO EQUIPADAS COM UM REVESTIMENTO SELETIVO (VIDRO SOLAR CONTROLADO) DE VIDRO G, GL, N ELT; 0,35-ISOLAMENTO TÉRMICO DE ESTRUTURAS HORIZONTAIS E VERTICAIS: LONGO (Portuguese)
    5 July 2022
    0 references
    KYSEISEN RAKENNUKSEN ENERGIATEHOKKUUDEN PARANTAMISTA KOSKEVIEN TAVOITTEIDEN SAAVUTTAMISEKSI? PERUSTETAAN ERITYINEN HANKE, JOKA PERUSTUU SEURAAVIIN OTTELUIDEN SISÄLTÖÖN: SÄÄDETÄÄN SELLAISTEN OLEMASSA OLEVIEN IKKUNAKEHYSTEN POISTAMISESTA, JOTKA EIVÄT TÄYTÄ VÄHIMMÄISVAATIMUKSISSA 26/06/2015 VAHVISTETTUJA SUORITUSKYKYVAATIMUKSIA; MENETKÖ SAMAAN AIKAAN? ASENNETAAN UUDET ALUMIINISET, LÄMPÖLEIKKAUSIKKUNAT, JOISSA ON VETRO-CAMERA BASO-LOW-EMISSION (BE), JOKA TÄYTTÄÄ MINISTERIÖN ASETUKSEN NRO 16.02.2016 (LÄMPÖTILI 2.0) SUORITUSKYKYVAATIMUKSET JA HEW ELT; 1,67 W7M.K. AVTRR-ASENNUS? KIINNITTÄEN ERITYISTÄ HUOMIOTA C.D.:N KORJAAMISEEN? LÄMPÖSILTOJA VARTEN? SEN VUOKSI SIINÄ SÄÄDETÄÄN MYÖS NYKYISTEN KYNNYSARVOJEN KORVAAMISESTA UUSILLA LÄMMÖNLEIKKAUKSEN RAJA-ARVOILLA. SUD-EXD-SUD-OVEST-LASIT ON VARUSTETTU SELEKTIIVISELLÄ PINNOITTEELLA (AURINKOOHJATTU LASI), JOKA ON LASIA G, GL, N ELT; VAAKA- JA PYSTYRAKENTEIDEN 0,35-LÄMPÖERISTYS: PITKÄ (Finnish)
    5 July 2022
    0 references
    W CELU REALIZACJI CELÓW POPRAWY EFEKTYWNOŚCI ENERGETYCZNEJ DANEGO BUDYNKU? SKONFIGURUJ KONKRETNY PROJEKT OPARTY NA NASTĘPUJĄCEJ TREŚCI URZĄDZEŃ: PRZEWIDZIANO USUNIĘCIE WSZELKICH ISTNIEJĄCYCH RAM OKIENNYCH, KTÓRE NIE SPEŁNIAJĄ WYMOGÓW DOTYCZĄCYCH OSIĄGÓW OKREŚLONYCH W MINIMALNYCH WYMAGANIACH 26/06/2015; RÓWNOLEGLE, KONTYNUUJESZ? INSTALACJA NOWYCH ALUMINIOWYCH OKIEN CIĘTYCH TERMICZNIE Z KAMERĄ VETRO-CAMERA BASO-NISKOEMISYJNĄ (BE), SPEŁNIAJĄCĄ WYMOGI EKSPLOATACYJNE OKREŚLONE W DEKRECIE MINISTERIALNYM NR 16.02.2016 (RACHUNEK TERMICZNY 2.0) Z HEW ELT; 1,67 W7M.K. INSTALACJA AVTRR? ZE SZCZEGÓLNYM UWZGLĘDNIENIEM KOREKTY C.D.? DO MOSTKÓW TERMICZNYCH? W ZWIĄZKU Z TYM PRZEWIDUJE SIĘ RÓWNIEŻ ZASTĄPIENIE ISTNIEJĄCYCH PROGÓW NOWYMI PROGAMI REDUKCJI CIEPŁA. SZYBY SUD-EXD-SUD-OVEST BĘDĄ WYPOSAŻONE W SELEKTYWNĄ POWŁOKĘ (SZKŁO STEROWANE SŁONECZNIE) ZE SZKŁA G, GL, N ELT; 0,35-IZOLACJA TERMICZNA KONSTRUKCJI POZIOMYCH I PIONOWYCH: DŁUGI (Polish)
    5 July 2022
    0 references
    DA BI SLEDILI CILJEM IZBOLJŠANJA ENERGETSKE UČINKOVITOSTI ZADEVNE STAVBE? NASTAVITE POSEBEN PROJEKT, KI TEMELJI NA NASLEDNJI VSEBINI NAPELJAV: PREDVIDENA JE ODSTRANITEV VSEH OBSTOJEČIH OKENSKIH OKVIRJEV, KI NE IZPOLNJUJEJO ZAHTEV GLEDE UČINKOVITOSTI, DOLOČENIH V MINIMALNIH ZAHTEVAH 26/06/2015; VZPOREDNO, ALI NADALJUJEŠ? NAMESTITEV NOVEGA ALUMINIJA, TERMIČNO REZANEGA OKNA, Z VETRO-KAMERO BASO-NIZKOEMISIJSKO (BITI), KI IZPOLNJUJE ZAHTEVE GLEDE ZMOGLJIVOSTI IZ MINISTRSKE UREDBE ŠT. 16.02.2016 (TOPLOTNI RAČUN 2.0) S HEW ELT; 1,67 W7M.K. NAMESTITEV AVTRR? S POSEBNIM POUDARKOM NA POPRAVKU C.D.? ZA TOPLOTNE MOSTOVE? ZATO DOLOČA TUDI NADOMESTITEV OBSTOJEČIH PRAGOV Z NOVIMI PRAGOVI ZA ODVAJANJE TOPLOTE. ZASTEKLITEV SUD-EXD-SUD-OVEST BO OPREMLJENA S SELEKTIVNIM PREMAZOM (SONČNO NADZOROVANO STEKLO) IZ STEKLA G, GL, N ELT; 0,35-TERMIČNA IZOLACIJA VODORAVNIH IN NAVPIČNIH KONSTRUKCIJ: DOLGA (Slovenian)
    5 July 2022
    0 references
    ZA ÚČELEM DOSAŽENÍ CÍLŮ ZLEPŠENÍ ENERGETICKÉ ÚČINNOSTI DOTČENÉ BUDOVY? VYTVOŘIT KONKRÉTNÍ PROJEKT ZALOŽENÝ NA NÁSLEDUJÍCÍM OBSAHU SVÍTIDEL: BYLA PŘIJATA OPATŘENÍ PRO ODSTRANĚNÍ JAKÝCHKOLI STÁVAJÍCÍCH OKENNÍCH RÁMŮ, KTERÉ NESPLŇUJÍ POŽADAVKY NA VÝKONNOST STANOVENÉ V MINIMÁLNÍCH POŽADAVCÍCH 26/06/2015; PARALELNĚ POKRAČUJETE? INSTALACE NOVÝCH HLINÍKOVÝCH, TEPELNĚ ŘEZANÝCH OKEN S VETRO-KAMERA BASO-LOW-EMISE (BE), SPLŇUJÍCÍ VÝKONNOSTNÍ POŽADAVKY MINISTERSKÉ VYHLÁŠKY Č. 16.02.2016 (TEPELNÝ ÚČET 2.0) SE HEW ELT; 1,67 W7M.K. INSTALACE AVTRR? SE ZVLÁŠTNÍ POZORNOSTÍ VĚNOVANOU KOREKCI C.D.? PRO TEPELNÉ MOSTY? STANOVÍ PROTO ROVNĚŽ NAHRAZENÍ STÁVAJÍCÍCH PRAHOVÝCH HODNOT NOVÝMI PRAHOVÝMI HODNOTAMI PRO SNÍŽENÍ TEPLA. ZASKLENÍ SUD-EXD-SUD-OVEST BUDE VYBAVENO SELEKTIVNÍM POVLAKEM (SOLÁRNÍ KONTROLOVANÉ SKLO) ZE SKLA G, GL, N ELT; 0,35-TEPELNÁ IZOLACE VODOROVNÝCH A SVISLÝCH KONSTRUKCÍ: DLOUHÁ (Czech)
    5 July 2022
    0 references
    SIEKIANT PADIDINTI ATITINKAMO PASTATO ENERGIJOS VARTOJIMO EFEKTYVUMĄ? SUKURKITE KONKRETŲ PROJEKTĄ, PAGRĮSTĄ ŠIUO ARMATŪRA TURINIU: NUMATOMA GALIMYBĖ PAŠALINTI VISUS ESAMUS LANGŲ RĖMUS, KURIE NEATITINKA BŪTINIAUSIUOSE REIKALAVIMUOSE NR. 26/06/2015 NUSTATYTŲ EKSPLOATACINIŲ SAVYBIŲ REIKALAVIMŲ; TUO PAT METU JŪS EINATE? NAUJŲ ALIUMINIO, TERMINIO PJOVIMO LANGŲ SU VETRO-CAMERA BASO-MAŽOS EMISIJOS (BE), ATITINKANČIŲ 2016 M. VASARIO 16 D. MINISTRO DEKRETE NR. 16.02.2016 (TERMINĖ SĄSKAITA 2.0) NUSTATYTUS VEIKSMINGUMO REIKALAVIMUS, ĮRENGIMAS SU ELT; 1,67 W7M.K. AVTRR ĮRENGINYS? YPATINGĄ DĖMESĮ SKIRIANT C.D. KOREKCIJAI? DĖL ŠILUMINIŲ TILTŲ? TODĖL JAME TAIP PAT NUMATYTA PAKEISTI ESAMAS RIBINES VERTES NAUJOMIS ŠILUMOS ATKARPOS RIBINĖMIS VERTĖMIS. SUD-EXD-SUD-OVEST ĮSTIKLINIMO STIKLAS BUS PADENGTAS SELEKTYVIĄJA STIKLO G, GL, N ELT DANGA (SAULĖS VALDOMAS STIKLAS); 0,35-HORIZONTALIŲJŲ IR VERTIKALIŲJŲ KONSTRUKCIJŲ IZOLIACIJA: ILGAS (Lithuanian)
    5 July 2022
    0 references
    LAI SASNIEGTU ATTIECĪGĀS ĒKAS ENERGOEFEKTIVITĀTES UZLABOŠANAS MĒRĶUS? IZVEIDO ĪPAŠU PROJEKTU, KURA PAMATĀ IR ŠĀDS ARMATŪRAS SATURS: IR PAREDZĒTS LIKVIDĒT JEBKĀDUS ESOŠUS LOGU RĀMJUS, KAS NEATBILST MINIMĀLAJĀM PRASĪBĀS NR. 26/06/2015 NOTEIKTAJĀM VEIKTSPĒJAS PRASĪBĀM; PARALĒLI, VAI JŪS TURPINĀT? JAUNU ALUMĪNIJA, TERMISKO GRIEZUMU WINDOWS AR VETRO-CAMERA BASO ZEMU EMISIJU (BE) UZSTĀDĪŠANU, KAS ATBILST MINISTRIJAS DEKRĒTA NR. 16.02.2016 (TERMISKAIS KONTS 2.0) AR HEW ELT VEIKTSPĒJAS PRASĪBĀM; 1,67 W7M.K. AVTRR INSTALĀCIJA? ĪPAŠU UZMANĪBU PIEVĒRŠOT C.D. KOREKCIJAI? TERMISKAJIEM TILTIEM? TĀPĒC TAS ARĪ PAREDZ AIZSTĀT ESOŠOS SLIEKŠŅUS AR JAUNIEM SILTUMA SAMAZINĀŠANAS SLIEKŠŅIEM. SUD-EXD-SUD-OVEST STIKLOJUMS BŪS APRĪKOTS AR SELEKTĪVU PĀRKLĀJUMU (SAULES VADĀMAIS STIKLS) NO STIKLA G, GL, N ELT; 0,35-SILTUMIZOLĀCIJA HORIZONTĀLĀM UN VERTIKĀLĀM KONSTRUKCIJĀM: GARŠ (Latvian)
    5 July 2022
    0 references
    С ЦЕЛ ПОСТИГАНЕ НА ЦЕЛИТЕ ЗА ПОДОБРЯВАНЕ НА ЕНЕРГИЙНАТА ЕФЕКТИВНОСТ НА ВЪПРОСНАТА СГРАДА? СЪЗДАВАНЕ НА КОНКРЕТЕН ПРОЕКТ ВЪЗ ОСНОВА НА СЛЕДНОТО СЪДЪРЖАНИЕ НА ОСВЕТИТЕЛНИТЕ ТЕЛА: ПРЕДВИЖДА СЕ ПРЕМАХВАНЕТО НА ВСИЧКИ СЪЩЕСТВУВАЩИ ДОГРАМА, КОИТО НЕ ОТГОВАРЯТ НА ЕКСПЛОАТАЦИОННИТЕ ИЗИСКВАНИЯ, ОПРЕДЕЛЕНИ В МИНИМАЛНИТЕ ИЗИСКВАНИЯ 26.6.2015 Г.; УСПОРЕДНО С ТОВА, ПРОДЪЛЖАВАТЕ ЛИ? ИНСТАЛИРАНЕТО НА НОВИ ПРОЗОРЦИ ЗА ТЕРМИЧНО РЯЗАНЕ НА АЛУМИНИЙ С ВЕТРОКАМЕРА BASO С НИСКИ ЕМИСИИ (BE), КОИТО ОТГОВАРЯТ НА ИЗИСКВАНИЯТА ЗА ЕФЕКТИВНОСТ НА МИНИСТЕРСКИ УКАЗ № 16.02.2016 Г. (ТЕРМИЧНА СМЕТКА 2.0) С ИЗКАЧЕН ELT; 1,67 W7M.K. ИНСТАЛАЦИЯТА AVTRR? С ОСОБЕНО ВНИМАНИЕ КЪМ КОРЕКЦИЯТА НА C.D.? ЗА ТОПЛИННИ МОСТОВЕ? ПОРАДИ ТОВА В НЕГО СЪЩО ТАКА СЕ ПРЕДВИЖДА ЗАМЯНАТА НА СЪЩЕСТВУВАЩИТЕ ПРАГОВЕ С НОВИ ПРАГОВЕ ЗА НАМАЛЯВАНЕ НА ТОПЛИННАТА ЕНЕРГИЯ. СТЪКЛОТО SUD-EXD-SUD-OVEST ЩЕ БЪДЕ ОБОРУДВАНО СЪС СЕЛЕКТИВНО ПОКРИТИЕ (СЛЪНЧЕВО КОНТРОЛИРАНО СТЪКЛО) ОТ СТЪКЛО G, GL, N ELT; 0,35-ТЕРМИЧНА ИЗОЛАЦИЯ НА ХОРИЗОНТАЛНИ И ВЕРТИКАЛНИ КОНСТРУКЦИИ: ДЪЛЪГ (Bulgarian)
    5 July 2022
    0 references
    A SZÓBAN FORGÓ ÉPÜLET ENERGIAHATÉKONYSÁGÁNAK JAVÍTÁSÁRA IRÁNYULÓ CÉLKITŰZÉSEK MEGVALÓSÍTÁSA ÉRDEKÉBEN? HOZZON LÉTRE EGY KONKRÉT PROJEKTET A KÖVETKEZŐ TARTALMAK ALAPJÁN: RENDELKEZNI KELL MINDEN OLYAN MEGLÉVŐ ABLAKKERET ELTÁVOLÍTÁSÁRÓL, AMELY NEM FELEL MEG A 2015. JÚNIUS 26-I MINIMUMKÖVETELMÉNYEKBEN MEGHATÁROZOTT TELJESÍTMÉNYKÖVETELMÉNYEKNEK; EZZEL PÁRHUZAMOSAN FOLYTATOD? ÚJ ALUMÍNIUM, HŐKEZELT ABLAKOK TELEPÍTÉSE A VETRO-CAMERA BASO-ALACSONY KIBOCSÁTÁSÚ (BE) RENDSZERREL, AMELY MEGFELEL A 16.02.2016. SZ. MINISZTERI RENDELET TELJESÍTMÉNYKÖVETELMÉNYEINEK (2.0. HŐSZÁMLA) A NYÉL ELT-VEL; 1,67 W7M.K. AZ AVTRR TELEPÍTÉSE? KÜLÖNÖS TEKINTETTEL A C.D. KORREKCIÓJÁRA? HŐHIDAKRA? EZÉRT AZT IS ELŐÍRJA, HOGY A MEGLÉVŐ KÜSZÖBÉRTÉKEKET ÚJ HŐCSÖKKENTÉSI KÜSZÖBÉRTÉKEKKEL KELL FELVÁLTANI. A SUD-EXD-SUD-OVEST ÜVEGEZÉST ÜVEG G, GL, N ELT SZELEKTÍV BEVONATTAL (NAPVEZÉRLÉSŰ ÜVEG) SZERELIK FEL; 0,35-HŐSZIGETELÉS VÍZSZINTES ÉS FÜGGŐLEGES SZERKEZETEK ESETÉBEN: HOSSZÚ (Hungarian)
    5 July 2022
    0 references
    CHUN NA CUSPÓIRÍ A BHAINT AMACH MAIDIR LE FEABHAS A CHUR AR ÉIFEACHTÚLACHT FUINNIMH AN FHOIRGNIMH ATÁ I GCEIST? TIONSCADAL SONRACH A BHUNÚ BUNAITHE AR ÁBHAR NA NDAINGNEÁN SEO A LEANAS: DÉANTAR FORÁIL MAIDIR LE HAON FRÁMAÍ FUINNEOIGE ATÁ ANN CHEANA NACH GCOMHLÍONANN NA CEANGLAIS FEIDHMÍOCHTA A LEAGTAR SÍOS IN ÍOSCHEANGLAIS 26/06/2015 A BHAINT; AG AN AM CÉANNA, AN LEANANN TÚ AR AGHAIDH? SUITEÁIL WINDOWS NUA ALÚMANAIM, GEARRTHA TEIRMEACHA, LE VETRO-CAMERA BASO-ÍSEAL-ASTAÍOCHTA (BE), A CHOMHLÍONANN CEANGLAIS FEIDHMÍOCHTA FHORAITHNE AIREACHTA UIMH. 16.02.2016 (CUNTAS TEIRMEACH 2.0) LE HEW ELT; 1,67 W7M.K. AN SUITEÁIL AVTRR? LE HAIRD AR LEITH AR CHEARTÚ C.D.? I GCÁS DROICHID THEIRMIGH? DÁ BHRÍ SIN, DÉANTAR FORÁIL ANN FREISIN MAIDIR LE TAIRSEACHA NUA GEARRTHA TEASA A CHUR IN IONAD NA DTAIRSEACH ATÁ ANN CHEANA. BEIDH GLOINIÚ SUD-EXD-FÓMHAIR FEISTITHE LE BRATÚ ROGHNAÍOCH (GLOINE FAOI RIALÚ GRÉINE) DE GHLOINE G, GL, N ELT; INSLIÚ 0,35-TEIRMEACH AR STRUCHTÚIR CHOTHROMÁNACHA AGUS INGEARACHA: FADA (Irish)
    5 July 2022
    0 references
    FÖR ATT UPPNÅ MÅLEN ATT FÖRBÄTTRA ENERGIEFFEKTIVITETEN I BYGGNADEN I FRÅGA? INRÄTTA ETT SPECIFIKT PROJEKT BASERAT PÅ FÖLJANDE INNEHÅLL I FIXTURERNA: DET FINNS BESTÄMMELSER OM AVLÄGSNANDE AV BEFINTLIGA FÖNSTERKARMAR SOM INTE UPPFYLLER DE PRESTANDAKRAV SOM FASTSTÄLLS I MINIMIKRAVEN 26.6.2015. PARALLELLT, FORTSÄTTER DU? INSTALLATION AV NYA VÄRMESKURNA FÖNSTER AV ALUMINIUM, MED VETRO-CAMERA BASO-LÅGUTSLÄPP (BE), SOM UPPFYLLER PRESTANDAKRAVEN I MINISTERDEKRET NR 16.02.2016 (TERMOKONTO 2.0) MED HEW ELT. 1,67 W7M.K. AVTRR-INSTALLATIONEN? MED SÄRSKILD UPPMÄRKSAMHET PÅ KORRIGERINGEN AV C.D.? FÖR TERMISKA BRYGGOR? DÄRFÖR FÖRESKRIVS DET OCKSÅ ATT BEFINTLIGA TRÖSKELVÄRDEN SKA ERSÄTTAS MED NYA VÄRMESÄNKTA TRÖSKELVÄRDEN. SUD-EXD-SUD-OVEST-GLAS KOMMER ATT VARA UTRUSTADE MED EN SELEKTIV BELÄGGNING (SOLKONTROLLERAT GLAS) AV GLAS G, GL, N ELT. 0,35-TERMISK ISOLERING AV HORISONTELLA OCH VERTIKALA STRUKTURER: LÅNG (Swedish)
    5 July 2022
    0 references
    ET SAAVUTADA KÕNEALUSE HOONE ENERGIATÕHUSUSE PARANDAMISE EESMÄRGID? KÄIVITAGE ERIPROJEKT, MIS PÕHINEB JÄRGMISEL SISUL: NÄHAKSE ETTE SELLISTE OLEMASOLEVATE AKNARAAMIDE EEMALDAMINE, MIS EI VASTA 26. JUUNI 2015. AASTA MIINIMUMNÕUETES SÄTESTATUD TOIMIVUSNÕUETELE; KAS JÄTKATE PARALLEELSELT? UUE ALUMIINIUMIST, SOOJUSLÕIGATUD AKENDE PAIGALDAMINE KOOS VETRO-CAMERA BASO-MADALA HEITEGA (BE), MIS VASTAB MINISTRI DEKREEDI NR 16.02.2016 (TERMAALKONTO 2.0) TOIMIVUSNÕUETELE KOOS KÕRGHOONEGA ELT; 1,67 W7MK. AVTRR-I PAIGALDUS? PÖÖRATES ERILIST TÄHELEPANU C.D. KORRIGEERIMISELE? TERMILISTE SILDADE JAOKS? SEEPÄRAST NÄHAKSE SELLEGA ETTE KA OLEMASOLEVATE KÜNNISTE ASENDAMINE UUTE SOOJUSKATKESTUSLÄVEDEGA. SUD-EXD-SUD-OVEST KLAASPINNAD VARUSTATAKSE SELEKTIIVSE KATTEGA (PÄIKESEGA KONTROLLITUD KLAAS) KLAASIST G, GL, NELT; 0,35-TERMILINE HORISONTAAL- JA VERTIKAALKONSTRUKTSIOONIDE ISOLATSIOON: PIKK (Estonian)
    5 July 2022
    0 references
    PRATO
    0 references

    Identifiers