Crossing of Saint-Louis — Studies and works on the TCSP track — Sequences 1 to 5 (Q3712969): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed label, description and/or aliases in pt)
 
(2 intermediate revisions by the same user not shown)
label / ptlabel / pt
Travessia de Saint-Louis — Estudos e obras na via TCSP — Sequências 1 a
Travessia de Saint-Louis — Estudos e obras na via TCSP — Sequências 1 a 5
Property / summary: The purpose of the CIVIS operation “Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 to 5” was to create a TCSP of approximately 3.825 km in the heart of the city of Saint-Louis. (English) / qualifier
 
readability score: 0.0194233253879331
Amount0.0194233253879331
Unit1
Property / summaryProperty / summary
O objetivo da operação CIVIS «Traversée de Saint-Louis — Estudos e obras no TCSP Track — Sequências 1 a 5» foi criar um TCSP de aproximadamente 3,825 km no coração da cidade de Saint-Louis. (Portuguese)
O objetivo da operação CIVIS «Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 to 5» era criar um TCSP de cerca de 3,825 km no coração da cidade de Saint-Louis. (Portuguese)

Latest revision as of 13:37, 9 October 2024

Project Q3712969 in France
Language Label Description Also known as
English
Crossing of Saint-Louis — Studies and works on the TCSP track — Sequences 1 to 5
Project Q3712969 in France

    Statements

    0 references
    11,038,419.31 Euro
    0 references
    18,397,365.52 Euro
    0 references
    60.0 percent
    0 references
    1 October 2016
    0 references
    30 June 2020
    0 references
    COMMUNAUTE INTERCOMMUNALE DES VILLES SOLIDAIRES (CIVIS)
    0 references
    0 references

    21°14'1.57"S, 55°25'17.87"E
    0 references
    L'opération "Traversée de Saint-Louis – Études et travaux relatifs aux aménagements de la voie TCSP- Séquences 1 à 5" portée par la CIVIS a pour objet la création d’un TCSP d'environ 3,825 km au cœur de la ville de Saint-Louis. (French)
    0 references
    The purpose of the CIVIS operation “Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 to 5” was to create a TCSP of approximately 3.825 km in the heart of the city of Saint-Louis. (English)
    22 November 2021
    0.0194233253879331
    0 references
    Die von der CIVIS durchgeführte Operation „Traversée de Saint-Louis – Studien und Arbeiten zum Ausbau der TCSP-Sequenzen 1 bis 5“ zielt auf die Schaffung eines rund 3,825 km langen TCSP im Herzen der Stadt Saint-Louis ab. (German)
    2 December 2021
    0 references
    Het doel van de CIVIS operatie „Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 tot 5” was het creëren van een TCSP van ongeveer 3,825 km in het hart van de stad Saint-Louis. (Dutch)
    7 December 2021
    0 references
    Lo scopo dell'operazione CIVIS "Traversée de Saint-Louis — Studi e lavori sulla pista TCSP — Sequenze da 1 a 5" era quello di creare un TCSP di circa 3,825 km nel cuore della città di Saint-Louis. (Italian)
    13 January 2022
    0 references
    El propósito de la operación CIVIS «Traversée de Saint-Louis — Estudios y obras en la pista TCSP — Secuencias 1 a 5» fue crear un TCSP de aproximadamente 3,825 km en el corazón de la ciudad de Saint-Louis. (Spanish)
    14 January 2022
    0 references
    CIVISi operatsiooni „Traversée de Saint-Louis – Studies and works on the TCSP Track – Sequences 1–5“ eesmärk oli luua Saint-Louis’ linna südames umbes 3,825 km pikkune TCSP. (Estonian)
    12 August 2022
    0 references
    CIVIS operacijos „Traversée de Saint-Louis – Studies and works on the TCSP Track – Sequences 1–5“ tikslas buvo sukurti maždaug 3,825 km ilgio TCSP Sen Luiso miesto centre. (Lithuanian)
    12 August 2022
    0 references
    Svrha CIVIS operacije „Traversée de Saint-Louis – Studije i radovi na TCSP Track – slijedovi 1 do 5” bio je stvoriti TCSP od oko 3,825 km u srcu grada Saint-Louis. (Croatian)
    12 August 2022
    0 references
    Σκοπός της λειτουργίας CIVIS «Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 to 5» ήταν η δημιουργία ενός TCSP περίπου 3,825 km στην καρδιά της πόλης Saint-Louis. (Greek)
    12 August 2022
    0 references
    Účelom operácie CIVIS „Traversée de Saint-Louis – Štúdie a práce na trati TCSP – Sequences 1 až 5“ bolo vytvoriť TCSP na približne 3,825 km v srdci mesta Saint-Louis. (Slovak)
    12 August 2022
    0 references
    CIVIS-operaation ”Traversée de Saint-Louis – Studies and works on the TCSP Track – Sequences 1–5” tarkoituksena oli luoda noin 3,825 kilometrin pituinen TCSP Saint-Louisin kaupungin ytimeen. (Finnish)
    12 August 2022
    0 references
    Celem operacji CIVIS „Traversée de Saint-Louis – Studia i prace na torze TCSP – Sequences 1 do 5” było stworzenie TCSP o długości około 3,825 km w samym sercu miasta Saint-Louis. (Polish)
    12 August 2022
    0 references
    A CIVIS „Traversée de Saint-Louis – Studies and works on the TCSP Track – Sequences 1 to 5” (Traversée de Saint-Louis – Studies and works on the TCSP – Sequences 1–5) elnevezésű műveletének célja az volt, hogy egy körülbelül 3,825 km-es TCSP-t hozzon létre Saint-Louis szívében. (Hungarian)
    12 August 2022
    0 references
    Účelem operace CIVIS „Traversée de Saint-Louis – Studie a práce na trati TCSP – Sequences 1 až 5“ bylo vytvořit TCSP o délce přibližně 3,825 km v centru města Saint-Louis. (Czech)
    12 August 2022
    0 references
    CIVIS operācijas “Traversée de Saint-Louis — Pētījumi un darbi uz TCSP Track — Sequences 1–5” mērķis bija izveidot TCSP aptuveni 3,825 km attālumā Saint-Louis pilsētas centrā. (Latvian)
    12 August 2022
    0 references
    Ba é cuspóir na hoibríochta CIVIS “Traversée de Saint-Louis — Staidéir agus oibreacha ar Rian TCSP — Seicheamh 1 go 5” TCSP de thart ar 3.825 km a chruthú i gcroílár chathair Saint-Louis. (Irish)
    12 August 2022
    0 references
    Namen operacije CIVIS „Traversée de Saint-Louis – Študije in dela na progi TCSP – zaporedja od 1 do 5“ je bil ustvariti TCSP približno 3,825 km v središču mesta Saint-Louis. (Slovenian)
    12 August 2022
    0 references
    Целта на операцията на CIVIS „Traversée de Saint-Louis — проучвания и работи по трасето TCSP — поредици от 1 до 5“ е да се създаде TCSP на около 3,825 км в сърцето на град Сен Луи. (Bulgarian)
    12 August 2022
    0 references
    L-għan tal-operazzjoni CIVIS “Traversée de Saint-Louis — Studji u xogħlijiet fuq il-linja ferrovjarja TCSP — Sequences 1 sa 5” kien li jinħoloq TCSP ta’ madwar 3.825 km fil-qalba tal-belt ta’ Saint-Louis. (Maltese)
    12 August 2022
    0 references
    O objetivo da operação CIVIS «Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1 to 5» era criar um TCSP de cerca de 3,825 km no coração da cidade de Saint-Louis. (Portuguese)
    12 August 2022
    0 references
    Formålet med CIVIS-operationen "Traversée de Saint-Louis — Studies and works on the TCSP Track — Sequences 1-5" var at skabe en TCSP på ca. 3,825 km i hjertet af byen Saint-Louis. (Danish)
    12 August 2022
    0 references
    Scopul operațiunii CIVIS „Traversée de Saint-Louis – Studii și lucrări pe TCSP Track – secvențe 1-5” a fost de a crea un TCSP de aproximativ 3,825 km în inima orașului Saint-Louis. (Romanian)
    12 August 2022
    0 references
    Syftet med CIVIS operation ”Traversée de Saint-Louis – Studies and works on the TCSP Track – Sequences 1 to 5” var att skapa en TCSP på cirka 3,825 km i hjärtat av staden Saint-Louis. (Swedish)
    12 August 2022
    0 references
    7 December 2023
    0 references

    Identifiers

    RE0016504
    0 references